Sardar Moshin Ali

Project Manager at TDFC Company Pvt Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Muzaffarabad, Azad Kashmir, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Cswip 3.1 (level 2) Certified welding inspector
    Certified Scheme of Welding Inpection Program UK
    Jan, 2017
    - Oct, 2024

Experience

    • Pakistan
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Manager
      • Oct 2017 - Present

      Project Manager (Askari Cement Private Limited Nizampur KPK, Major Project: Installation of 6500 TPD Cement clinker line and 10 MW Waste Heat recovery power generation plant at FCCL-DG KHAN. 6500 TPD Cement line installation at Askari Cement Limited at Nizampur with 10 MW WHRPP. Area Manager /Coordinator (Lucky Cement limited 7500 TPD line 1 project) Major Projects: • Fabrication, erection and installation of Loesche Cement Mill VRM 56.3+3 for line C and D. • Fabrication, erection and installation of Loesche Raw Mill VRM 69.6 for the Line I project Project Manager (Cherat Cement Company limited WHRPP Line-3) Major Projects: • 10 MW WHRPP (Waste Heat Recovery power plant) for CCCL line 3. Project Manager (Fauji Cement WHR LINE-1) Aug. 2017 to June 2018 Major Projects: • 9 MW Capacity WHRPP (Waste Heat Recovery Power Plant) for FCCL line-1. • Premix bin for FCCL line-1. • Waste Clinker Handling Unit including Apron Conveyor installation for FCCL line-1. • Bucket Elevator for CF Silo FCCL Line -1. Show less

    • United Arab Emirates
    • Oil and Gas
    • 100 - 200 Employee
    • Mechanical Design Engineer
      • Oct 2014 - Oct 2017

      • Involved in design of the cleaning pigs like MBCT & profile. • Involved in design of inline inspection pigs like MFL, UT, IMU and TFI. • Prepare configuration for short and long run for different size of pipelines for different media.(Oil & Gas) • Involved in pipeline pigging operations and pigging stations design. • Perform cleaning and foam Pigging of 44 Km sales gas line from Bobi Oil Filed to Tando Adham.(OGDCL Pakistan) • Involved in design of the cleaning pigs like MBCT & profile. • Involved in design of inline inspection pigs like MFL, UT, IMU and TFI. • Prepare configuration for short and long run for different size of pipelines for different media.(Oil & Gas) • Involved in pipeline pigging operations and pigging stations design. • Perform cleaning and foam Pigging of 44 Km sales gas line from Bobi Oil Filed to Tando Adham.(OGDCL Pakistan)

    • Site Enigneer (Field gathering constrcution)
      • Aug 2013 - Sep 2014

      Involved in laying flow lines, Well head Assemblies construction, Tank Repair services and pipe fabrication and installation for LPG Plant at OGDCL Gas Condensate Field, Sanjohro,Sindh. Major Projects: 1).6" dia 27 km Flow line from Dachrapur to Daru Gas processing Facility including wellhead facilities construction. 2). Pipe Fabrication and erection of almost 3000 dia inches at LPG Plant, Sanjhoro Gas Condensate Facility. Sindh 3)- Pipe and Structure Fabricstion and installation of 16" dia flue gad line at Kunnar Oil Field, Sindh Show less

    • Pakistan
    • Glass, Ceramics and Concrete Manufacturing
    • 1 - 100 Employee
    • Assistant Mechanical E ngineer
      • Jan 2011 - Aug 2013

      Involved in Steel Structure Fabrication and Erection of 30 ton per day Pressed Glass Plant including furnace,Distributors, Fore-hearths, Batching plant, cullet Crushing plant and sand washing plant. Involved in laying of plant basic utilities i.e Water, Compressed Air, Natural Gas and Furnace Oil. Comprehensive knowledge of plant water, Compressed air and Natural gas circuits for the plant. Involved in furnace refractory construction. involved in different hoppers capacity calculations. Show less

Education

  • Dawood University of Engineering and Technology
    bechlor, Industrial Engineering
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now