Taylor Woodrow
-
Civil Engineering
-
300 - 400 Employee
-
Sub Agent
-
Jan 2023 - Present
-
-
Section Engineer
-
Apr 2020 - Feb 2023
-
-
Section Engineer
-
Sep 2019 - Mar 2020
As Section Engineer within the Structures team I was responsible for the self delivery of reinforced concrete anchor blocks for the VRS transition to the bridge parapets from setting out, pre and post pour checks, covermeter surveys and as-builts. During this time I was also managing the self delivery of the bearing grout to the gantry bases.I also managed a number of Subcontractor packages including the installation of the slip formed Concrete Safety Barrier and Surface water channel.Towards the end of the project I was involved in the close out of snags and defects across multiple disciplines.
-
-
Site Engineer
-
Apr 2018 - Sep 2019
Whilst on the M6 J2-4 Smart Motorway programme I was responsible for the management and delivery of bored piles and plunge piles. This included carrying out clash detection with other disciplines both in design and construction phasing. I was also responsible for producing the handover package associated with these works.
-
-
Site Engineer
-
Aug 2017 - Mar 2018
Digital Engineering Team
-
-
Site Engineer
-
May 2017 - Aug 2017
Whilst on the M20 Junction 10a Improvement Scheme I was responsible for the extraction of information from 3D design models and drawings for use in the planning phase.
-
-
Site Engineer
-
Mar 2017 - May 2017
At Old Oak Common Depot I developed further on my digital skills in a site based role. Whilst at Old Oak Common Depot I produced the as-built drawings based on the information provided by the engineers involved in construction.
-
-
Site Engineer
-
Jan 2017 - Mar 2017
Developing my role with the BIM team I assisted with quantity takeoffs from models. I also extracted sections from 3D models for use in drawings.
-
-
Assistant Engineer
-
Oct 2016 - Dec 2016
The BIM team support the response to tenders and assist with live project requests. As part of my role in the BIM team I produced 3D models for use in visualisations.
-
-
Assistant Engineer
-
Oct 2015 - Oct 2016
Filton Bank 4 Tracking is the delivery of a capacity enhancement scheme between Dr Day's Junction and Filton Abbey Wood Station, which will see the rail corridor increased from 2 tracks to 4 tracks. As part of this project I was lead engineer for the delivery of the waterproofing works at Boiling Wells Lane Underpass and the parapet extensions as Ducie Road Bridge.
-
-
Education
-
University of Southampton
Master of Science (MSc), Civil Engineering -
University of Southampton
Bachelor of Science (BSc), Mathematics