BHARTIA INFRA PROJECTS LIMITED
-
India
-
Construction
-
100 - 200 Employee
-
-
Nov 2021 - Present
Customer - N.F Railway Underground construction of tunnel No 4 & 5 (total length = 1500m) for new BG railway line project from Malvom to Kohima, Nagaland of N.F Railway projects
-
-
-
Apr 2019 - Oct 2021
Customer - N.F Railway Underground construction of tunnel no. 2 & 3 (total length = 1370m) for new BG railway line project from Titilia to Byrnihat including minor bridges, Assam, of N.F Railway projects.
-
-
-
Oct 2016 - Mar 2019
Customer - N.F. Railway Underground construction of tunnel No 7 A&C, 6A and 5 (total length = 3500m) for New B.G. railway line projects from Jiribam to Tupul (Imphal) and construction of foundation and sub-structure (Including pile foundation, piers, abutment, bed block, etc.) of major Bridge No. 53 ( span- 378m, steel girder) on river Barak including protection work in the approaches and other ancillary works in connection with construction of new B.G. Railway line from Jiribhum to Tupul (Imphal), Manipur of N.F. Railway (construction). Show less
-
-
-
IVRCL Infrastructures and Projects Ltd
-
India
-
Construction
-
700 & Above Employee
-
-
Aug 2012 - Nov 2014
Customer - IRCON InternationalConstruction of underground Railway Tunnel Project, PackageT-74R, including Road Works.Constructed Main Tunnel- 8.5m dia, Horse shoe type length- 3.5km, Escape Tunnel- 5.5m dia, Horse Shoe Type, length- 2.5km & intermediate Cross Passage Tunnel. The tunneling works shall be carried out by NATM. Planning and Programing as per drawing and specifications
-
-
-
Aug 2009 - Aug 2012
Customer - Adani Power Ltd. and Siemens Ltd.Construction of Civil Works in+/-500KV, 2500MW, HVDC Mohindergarh Terminal Station Project. Work includes earthwork, RCC work for equipment & tower founds. Control Room, Other Auxiliary Buildings Works, Valve Hall up top linth and its roofs slab- ht. =22m complete staging, Rail cum Road,Firewalls, Converter Transformer foundation, Cable Trenches, Drains, Underground Oil tanks, Road Works, Boundary wall, Chain-link fencing, Pre-cast concrete slab for cable trench and Yard graveling works. Show less
-
-
-
Jun 2006 - Jul 2009
Customer - Swasti Power Construction of underground hydro power project (3x7.5MW) including HRT 4.5m D-shape, Desilting Chamber, Surge Shaft (7.5m-10.0m, ht.=44m), Power house building (size60x40x36m),50m long Tail Race channel, silt flushing tunnel (dia. 2.5m, L=100m), road works. While executing these works, I was also associated with managing the labour, materials, plant and equipment, staff to achieve maximum efficiency and cost effectiveness. Also, timely completion of project within the given time frame and maintaining the quality of work at all stages as per specifications. Working closely with clients to understand their needs Show less
-
-
-
Jaiprakash Associates Ltd.
-
Consumer Goods
-
700 & Above Employee
-
Project Engineer
-
Sep 2001 - Jun 2006
Construction of underground H.E. Project (4x100MW) including road works. Constructed U/G,HRT (4.4m horseshoe/circular=3.20km), Pressure shaft-95m, Valve chamber, Surge Shaft (10mdia, L=165m), excavation, mucking, drilling, anchoring support by Structural Steel fabrication & erection, Rock bolting, grouting, lining concrete. Construction of underground H.E. Project (4x100MW) including road works. Constructed U/G,HRT (4.4m horseshoe/circular=3.20km), Pressure shaft-95m, Valve chamber, Surge Shaft (10mdia, L=165m), excavation, mucking, drilling, anchoring support by Structural Steel fabrication & erection, Rock bolting, grouting, lining concrete.
-
-
-
NIPPON POWER LIMITED
-
Darjeeling, West Bengal, India
-
Project Engineer
-
Aug 2000 - Aug 2001
Customer - WBPDCL,Construction of mini hydro projects (2x1.5MW) including motorable service Road Constructed intake to power house (L=3.5km)-excavation, protection wall, RCC works, grouting, Planning & Programming as per drawing & specification, reconciliation of materials, etc. Customer - WBPDCL,Construction of mini hydro projects (2x1.5MW) including motorable service Road Constructed intake to power house (L=3.5km)-excavation, protection wall, RCC works, grouting, Planning & Programming as per drawing & specification, reconciliation of materials, etc.
-
-
-
S.P. MALIK & CO PVT LTD
-
India
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Apr 1999 - Jul 2000
Construction of bridge, span-45m, well foundation including road works and retaining wall. Constructed well foundation, in rocky strata-excavation, well curb with steel lining, steining wall concrete, Tilt & shift measuring, bottom plugging, well cap, abutment shaft, RCC girder casting, fixing bearing Plate, slab casting, load testing, billing, reconciliation of materials Construction of bridge, span-45m, well foundation including road works and retaining wall. Constructed well foundation, in rocky strata-excavation, well curb with steel lining, steining wall concrete, Tilt & shift measuring, bottom plugging, well cap, abutment shaft, RCC girder casting, fixing bearing Plate, slab casting, load testing, billing, reconciliation of materials
-
-
-
ACCO ENGINEERS LIMITED
-
Rajasthan, India
-
Project Engineer
-
Jun 1998 - Mar 1999
Customer - RAU-Constructed hostel buildings and Stadium for RAU. Customer - RAU-Constructed hostel buildings and Stadium for RAU.
-
-
-
-
-
May 1997 - Jun 1998
Customer - SAI, JN Sports ComplexPolo Stadium (10,000 sitting capacity) – all concrete structure, billing, programming and planning as per schedule items, drawing and specifications, reconciliation of materials.
-
-
-
May 1994 - Apr 1997
Customer - NEEPCOConstructed power house building for (3x135MW), Ranghanadi, H.E.Project.Power House (size- 70x50x35 m) & 80m long tail race channel, TG foundation, fabrication and erection of roof truss, excavation, grouting, concreting, programming & planning, billing, reconciliation of materials, etc.
-
-
-
High Construction Pvt. Ltd.
-
Assam, India
-
DY. Project Engineer
-
Jul 1990 - May 1994
Customer - PWD(R&B)-Assam & Meghalaya State Constructed 4 nos. Built- up- girder & 1no.PSC bridge including approach Road works. Madarkura(span-68m), Torsa(span-54m), Bishkhowa-II(span-98m), Botertol(span-98m) & Williamnagar (span-132m),well and open foundation in Rocky, Sandy and Clayey Strata, Built-up-girder fabrication & erection over bridge cap of steel/neoprene bearing, PSC Girder casting, Cable stressing and proper record, girder shifting, bottom plugging, tilt & shift measuring record, surveying, billing, reconciliation of materials, load testing, etc. Show less
-
-
-
High Construction Pvt.Ltd.
-
Meghalaya, India
-
Asst. Project Engineer
-
Jul 1984 - Jul 1990
Customer - Me.S.E.B., Umium & Umtru(stage-IV) Constructed power house building and appurtenant works including Road works for(2x30MW),Power House (size-60x40x35m) & 60m long tail race channel, TG foundation, excavation, concreting, Roof truss, fabrication and erection, rail line fixing over RCC girder for EOT crane, slab casting, extra item rate analysis, procurement of store materials, reconciliation of materials, programming & planning, attended monthly project monitoring meeting, preparation of tender, survey works, billing, etc. Show less
-
-
-
HIGH CONSTRUCTION PVT. LTD.
-
Ranchi, Jharkhand, India
-
Junior Engineer
-
May 1982 - Jun 1984
Customer - Hitek Industries Constructed factory building with CGI roof over steel truss, Bay (size-1x72x18m&1x60x18m), Slitter machine & CFU machine foundation, fabrication and erection of truss, RCC gantry girder, rail line fixing for EOT crane. Administrative and other building, excavation, concreting, grouting, boundary Wall by B.M., survey works, preparation of bills, analysis of extra works, reconciliation of materials, Planning & programming as per schedule items, drawing and specifications. Show less
-
-
Education
-
Jagadish Chandra Polytechnic
Diploma of Education, Civil Engineering -
Dum Dum Airport Higher Secondary School
Higher National