Sandeep Rane
Vice President Operations at HYTECH ENGINEERS LTD- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Hindi Full professional proficiency
-
Marathi Native or bilingual proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Master black belt
Mahindra GroupAug, 2018- Sep, 2024 -
Train the trainer
Dale carniegeMar, 2013- Sep, 2024
Experience
-
HYTECH ENGINEERS LTD
-
Chemical Manufacturing
-
1 - 100 Employee
-
Vice President Operations
-
Apr 2023 - Present
Heading 4 plants, 600 people with strategy implementation Heading 4 plants, 600 people with strategy implementation
-
-
-
CIE Automotive India Ltd.
-
India
-
Motor Vehicle Parts Manufacturing
-
700 & Above Employee
-
Plant Manager
-
May 2021 - Apr 2023
Headed gear Div at pune, 600 people, all functions With P&L responsibilty. Headed gear Div at pune, 600 people, all functions With P&L responsibilty.
-
-
-
DANA ANAND India Private Limited (DAIPL)
-
India
-
Manufacturing
-
300 - 400 Employee
-
Deputy General Manager Operations
-
Mar 2012 - May 2021
Plant head, drive shaf div at satara, HOD in Operations,production and active in continuous improvements using lean principles across all plants. Lean Topics Coach and trainer,Achieving Productivity,Cost saving targets. Plant head, drive shaf div at satara, HOD in Operations,production and active in continuous improvements using lean principles across all plants. Lean Topics Coach and trainer,Achieving Productivity,Cost saving targets.
-
-
-
Mahle
-
Germany
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Sr Manager
-
Apr 2010 - Mar 2012
Strategic supply chain management Strategic supply chain management
-
-
-
-
Sr. Engineer
-
Oct 2006 - Mar 2009
1. E.P.E (Existing product engineering) which involves supporting Engg activities for current running models of pumps. Conducting VA/VE and product improvement activities. It also involves providing engg. Support to Production, S.C.M, and Manufacturing Engg and quality functions. Respond to customers queries and provide design solutions for MPS (Marketing product specs) i.e. new business with modification in current product. 2. N.P.D (New Product development) which involves leading projects which will add new products in company portfolio using six sigma methodology.I am responsible for implementing Internal valve feature for our Global Gear Pump programme. 3. Implementation of systems like FRACAS (Failure Reporting and corrective action system) and MPS prototype tracker. Show less
-
-
-
Caterpillar India Pvt Ltd
-
India
-
Retail Office Equipment
-
200 - 300 Employee
-
Sr. Assoc. Engg
-
Apr 2005 - Aug 2006
1. leading the project, Deliver Quality and on time delivery of projects by utilizing Pro-E, Preparing the estimation and quote the hours to the process partners of the projects. 2.Executing engineering change request by modifying current product design and maintain Engineering documentation as the Caterpillar Standards. 1. leading the project, Deliver Quality and on time delivery of projects by utilizing Pro-E, Preparing the estimation and quote the hours to the process partners of the projects. 2.Executing engineering change request by modifying current product design and maintain Engineering documentation as the Caterpillar Standards.
-
-
-
Larsen & Toubro Limited
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Sr. Engineer
-
Mar 2004 - Jun 2006
1) Application engineering to fetch orders: To prepare the Technical Sheet, cost sheets, General Arrangement drawings in order to convert the enquiries into order booking. 2) Product design and verification: To carry out detailed engineering design and drawing, load calculations and verifications in order to execute the order within the time frame. 3) Productivity improvement: To carry out standardization and release of common drawing, creation of templates in CAD software (PRO-E) and in excel, in order to reduce the lead-time of the design (Drawing Release) Show less
-
-
-
Mahindra and Mahindra
-
India
-
1 - 100 Employee
-
Dy.Manager
-
Jul 2000 - Mar 2005
Design, development and production of new hydraulic aggregate pertaining to the launch of new tractor. - The aggregate consisted of lift unit, power steering system and auxiliary valve system - The project covered various tasks such as customer survey, finalising specifications, benchmarking, QFD, concept generation, layout preparation, detailed design & development, vehicle integration, aggregate & vehicle testing, performance optimisation, production and launch. - Solved the chronic problem of draft disengage linkage of lift unit. Lead cost Re-engineering projects for Arjun Series tractors in vehicle integration group Show less
-
-
Education
-
Indian Institute of Management, Calcutta
PGPEX, Operations Management -
Bharati Vidyapeeth
B.E, Mechanical Engg -
K.J.Somaiya polytechnic
Diploma in Mech Engg.