Sanan Garaisayev

Material Engineer at Kocks Consult GmbH
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Azerbaijan, AZ
Languages
  • Azerbaijani Native or bilingual proficiency
  • Turkish Professional working proficiency
  • Russian Native or bilingual proficiency
  • English Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Panah Jafar

Gozel insan. Savadli muhendis. Yeniden bir yerde ishlemek umudu ile...

Javanshir Azizov

Знающий свою профессию на отлично. В коллективе его все любят и уважают. Коммуникабельный инженер.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • 1 - 100 Employee
    • Material Engineer
      • Sep 2020 - Present

      Project: - Design, Supply and Installation Works for Rail Track Rehabilitation (Including Structures) of Yalama-Sumgait Line (168 km). Project: - Design, Supply and Installation Works for Rail Track Rehabilitation (Including Structures) of Yalama-Sumgait Line (168 km).

    • Quality Control Manager
      • Feb 2020 - Aug 2020

      Project: - Upgrading to four lanes of 130.15 km section of the Ganja-Gazakh-Georgian Border Highway on M2/E60 Road Corridor. Lot1, Upgrading to four lanes of Ganja-Zayam Road, km 00+000 - 39+800 Project: - Upgrading to four lanes of 130.15 km section of the Ganja-Gazakh-Georgian Border Highway on M2/E60 Road Corridor. Lot1, Upgrading to four lanes of Ganja-Zayam Road, km 00+000 - 39+800

    • Quality Control Manacer
      • Dec 2018 - Feb 2020

      Project: - Rehabilitation of the road "Bishkek - Osh", km 507,5 - km 574,826 (Madaniyat - Jalal Abad)

    • Material Engineer and Quality Control
      • 2017 - Dec 2018

      Project: - Construction of Zagatala International Airport

    • Material Engineer and Quality Control
      • 2015 - 2017

      Project: - Reconstruction of Mingachevir-Bahramtapa Motorway, Lot1: Mingachevir-Mingacevir station

    • Material Engineer and Quality Control
      • 2014 - 2015

      Project: - Construction of motorways within the project of “White City”

    • Material Engineer and Quality Control
      • 2013 - 2015

      Project: - Construction of access roads, engineering structures and underground pedestrian passages to the 4-6 km section of Baku-Alat motorway

    • Material Engineer and Quality Control
      • 2013 - 2015

      Project: - Construction of new 8 lanes motorway, road junctions, engineering structure and underground pedestrian passages parallel to Nobel Avenue

    • Material Engineer and Quality Control
      • 2013 - 2015

      Project: - Design and construction of new motorway from Hasan Aliyev Street to Koroglu metro station parallel to Ziya Bunyadov Avenue, Part 1

    • Material Engineer and Quality Control
      • 2011 - 2013

      Project: - Reconstruction of Motorway “Baku-Alat-Gazakh-State Border with the Republic of Georgia”, section 2-4 km (road of State Flag Square)

    • Material Engineer and Quality Control
      • 2010 - 2011

      Project: - “Construction of Bilgah-Novkhani-Sumgayit motorway” (km 0+000 - 14+000)

    • Architecture and Planning
    • 1 - 100 Employee
    • Teacher
      • 2014 - 2015

  • Evrascon
    • Азербайджан
    • Material Engineer
      • 2008 - 2010

      Project: - “Takhtakorpu Water Storage Reservoir and EPS” Project: - “Takhtakorpu Water Storage Reservoir and EPS”

Education

  • Azerbaijan Architecture and Construction University
    Doctor of Philosophy (PhD), Construction Mechanics
    2008 - 2014
  • İstanbul Üniversitesi
    Master's degree, Construction Engineering
    2006 - 2008
  • Gazi Üniversitesi
    TOMER - Turkish Language Education
    2005 - 2006
  • Azerbaijan Architecture and Construction University
    Bachelor's degree, Transport Construction Engineering
    2001 - 2005

Community

You need to have a working account to view this content. Click here to join now