Samy Safwat
Senior Project Engineer at Scatec ASA- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Arabic Native or bilingual proficiency
-
English Professional working proficiency
Topline Score
Bio
Shaimaa Tarek
Eng. Samy is a very high added value to any project that would win him over. i had the honor to work with him on JV of ACEE project and he helped a lot in structuring the Engineering department, Supporting on Office and more on the Site. Helped in making our relation better with both the employer and subcontractor. i highly recommend him for any company that can win him over.
Tarek Elsemary
I was pleased to work with Samy Safwat during the execution of Benban Solar Park- ( Upper Egypt solar power plant 50MW / Zafarana solar power plant 50MW ) at Aswan. During this time, we worked together to accomplish the required civil works. Samy Safwat is a person who has a strong and cooperative personality and is ready to make every effort to make the project a success. He is technically competent and diligent and has the technical expertise to qualify for a higher position in the field of construction, Creative, dynamic, solutions-oriented and very enthusiastic with great communication skills. Samy is a source of strength for any company that works with it
Shaimaa Tarek
Eng. Samy is a very high added value to any project that would win him over. i had the honor to work with him on JV of ACEE project and he helped a lot in structuring the Engineering department, Supporting on Office and more on the Site. Helped in making our relation better with both the employer and subcontractor. i highly recommend him for any company that can win him over.
Tarek Elsemary
I was pleased to work with Samy Safwat during the execution of Benban Solar Park- ( Upper Egypt solar power plant 50MW / Zafarana solar power plant 50MW ) at Aswan. During this time, we worked together to accomplish the required civil works. Samy Safwat is a person who has a strong and cooperative personality and is ready to make every effort to make the project a success. He is technically competent and diligent and has the technical expertise to qualify for a higher position in the field of construction, Creative, dynamic, solutions-oriented and very enthusiastic with great communication skills. Samy is a source of strength for any company that works with it
Shaimaa Tarek
Eng. Samy is a very high added value to any project that would win him over. i had the honor to work with him on JV of ACEE project and he helped a lot in structuring the Engineering department, Supporting on Office and more on the Site. Helped in making our relation better with both the employer and subcontractor. i highly recommend him for any company that can win him over.
Tarek Elsemary
I was pleased to work with Samy Safwat during the execution of Benban Solar Park- ( Upper Egypt solar power plant 50MW / Zafarana solar power plant 50MW ) at Aswan. During this time, we worked together to accomplish the required civil works. Samy Safwat is a person who has a strong and cooperative personality and is ready to make every effort to make the project a success. He is technically competent and diligent and has the technical expertise to qualify for a higher position in the field of construction, Creative, dynamic, solutions-oriented and very enthusiastic with great communication skills. Samy is a source of strength for any company that works with it
Shaimaa Tarek
Eng. Samy is a very high added value to any project that would win him over. i had the honor to work with him on JV of ACEE project and he helped a lot in structuring the Engineering department, Supporting on Office and more on the Site. Helped in making our relation better with both the employer and subcontractor. i highly recommend him for any company that can win him over.
Tarek Elsemary
I was pleased to work with Samy Safwat during the execution of Benban Solar Park- ( Upper Egypt solar power plant 50MW / Zafarana solar power plant 50MW ) at Aswan. During this time, we worked together to accomplish the required civil works. Samy Safwat is a person who has a strong and cooperative personality and is ready to make every effort to make the project a success. He is technically competent and diligent and has the technical expertise to qualify for a higher position in the field of construction, Creative, dynamic, solutions-oriented and very enthusiastic with great communication skills. Samy is a source of strength for any company that works with it
Credentials
-
Certified Cost Professional (CCP) Training Course
Luqman AcademyFeb, 2022- Nov, 2024 -
First Aid
Egyptian Red CrescentJan, 2019- Nov, 2024 -
OSHA (10H) Training Course
Orascom Construction PLCFeb, 2018- Nov, 2024 -
Occupational Health (Stress at Work) Training Program
Orascom Construction PLCApr, 2016- Nov, 2024 -
Project Management Professional (PMP)
Project Management InstituteNov, 2021- Nov, 2024
Experience
-
Scatec ASA
-
Norway
-
Renewable Energy Power Generation
-
700 & Above Employee
-
Senior Project Engineer
-
Jul 2022 - Present
Scatec ASA, Fertiglobe, Orascom Construction, and The Sovereign Fund of Egypt (TSFE) have entered into an agreement to develop a 100 MW Electrolyzer facility to produce Green Hydrogen. The Project covers the Engineering, Procurement, Construction as well as Commissioning of the facility. Scatec is acting as the Owner's Engineer for the Project during construction and will provide asset management and O&M services. Scatec ASA, Fertiglobe, Orascom Construction, and The Sovereign Fund of Egypt (TSFE) have entered into an agreement to develop a 100 MW Electrolyzer facility to produce Green Hydrogen. The Project covers the Engineering, Procurement, Construction as well as Commissioning of the facility. Scatec is acting as the Owner's Engineer for the Project during construction and will provide asset management and O&M services.
-
-
-
-
Senior Project Engineer
-
Jun 2019 - Jun 2022
Julius Nyerere Hydropower Project 2115MW, TanzaniaWith a project cost of 2.9 Billion Dollars for building the main dam and appurtenant structures, with an expected reservoir length of 100 km, covering an area of about 1,350 square km. The dam height is about 134 meters. When complete, this project will more than triple the country’s current installed hydropower capacity of 562 MW.Responsibilities: In addition to the above-summarized qualifications; the main responsibilities were:* Coordinate with design consultants, engineers project representatives, third parties, and the Client Representative to set up design deliverables requirements for submission.* Review design deliverables together with design consultants and engineers to ensure order for submission.* Coordinate and discuss with project coordination team members, Designers, vendors, and subcontractors with regards to the workability and constructability of the design.* Coordinate with document controller on design deliverables transaction to ensure a smooth flow of documents.* Assist procurement team with all necessary technical inputs collected from the Engineering Team to facilitate the award of procurement and subcontract packages.* Update and report the Engineering Progress through MDL, Bi-weekly, and Monthly reports.* Develop relations with planning engineer on design submission schedule and ensure timely design submissions.* Participate in technical design clarification and project meetings.* Involve in technical clarifications as required.* Provide administrative support for division manager and discipline department heads.* Lead and direct routine Engineering Division activities after consulting the Engineering Manager.* Update and maintain the Engineering Department O-Chart and deployment plan.* Assist all Engineering Department personnel along with entire project staff with any needs.* Record inputs, logs, and daily work orders
-
-
-
Scatec ASA
-
Norway
-
Renewable Energy Power Generation
-
700 & Above Employee
-
Project Civil Engineer
-
Jul 2018 - Jun 2019
Upper Egypt and Zafarana Solar Power Plants 130MW, EgyptWith a project cost of 110 Million Dollars, the project was part of the Egyptian governmentsolar Feed-in-Tariff program which launched in 2015 intending to generate 20% of energy fromrenewable sources by 2022. With 1.8 GW and covering 36 km² the Benban site near Aswan isin 2019 the world’s largest on-site solar project. Scatec Solar entered the market with 400 MWunder construction, the company is the largest solar developer in Egypt.Responsibilities: Working as Owner representative, supervising all civil works by thesubcontractors, reviewing drawings, assisting in the planning and the improvement of theproject schedule, and the review of the monthly payment certificates
-
-
-
Orascom Construction PLC
-
Egypt
-
Construction
-
700 & Above Employee
-
Site Civil Engineer
-
Jan 2016 - Jul 2018
Asyut Combined Cycle Power Plant 500MW, EgyptWith a project cost of 430 Million Dollars to convert Asyut power plant from simple tocombined cycle with an additional capacity of 500 MW (2*250 class D200). The two D200steam turbines will use the waste heat from the existing 8x125 MW 9E Frame gas turbines togenerate the 500 MW extra power. This will take the total capacity of the plant from 1000 MWto 1500 MW.Responsibilities: Acting as a Senior Site Engineer, supervising the execution of Steam TurbineBuilding, Air Cooled Condenser, Electrical Control Building, Transformer, all UndergroundFacilities, and Piping Thermal Insulation of two HRSG’s and BOP systems.
-
-
Site Civil Engineer
-
Jan 2015 - Dec 2015
New Asyut Power Plant-Fast Track-1000MW, EgyptWith an 870 Million Dollars EPC contract the consortium will build Eight (8) CTGs, GE (PG9171E) dual-fired Gas Turbine Generator equipment package with all required Balance of Plantsystems on a fast track basis of 9 months to the first fire.Responsibilities: Supervising the execution of all structural activities of three Gas turbinesincluding all miscellaneous buildings and fuel tanks area.
-
-
Technical Office Engineer
-
Sep 2014 - Jan 2015
Grand Heights Villas, EgyptWith a project cost of 238 million Egyptian pounds, Kuwadico Grand Heights consists of 168ResidentialUnits (C2 Villas) - 6th of October City - Egypt.Responsibilities: Drafting all civil shop drawings and coordinate their approval process withthe project consultant, make the quantity take-off for monthly invoices, and supporting alltechnical issues.
-
-
Site Civil Engineer
-
Sep 2013 - Sep 2014
Grand Heights Villas, EgyptWith a project cost of 172 million Egyptian pounds, Kuwadico Grand Heights consists of 110Residential Units (C1 Villas) - 6th of October City - Egypt.Responsibilities: Supervising the execution of all structural activities of different villas’ types.
-
-
-
Orascom Construction PLC
-
Egypt
-
Construction
-
700 & Above Employee
-
Associate Civil Engineer (Summer Internship)
-
Jun 2012 - Sep 2012
Giza North 1500MW Power Plant, EgyptOCI has been awarded the 181million Dollar civil works package for the combined cycle powerplant from Cairo, Electricity Production Company to be executed in 32 months. The projectconsists of three modules each module includes two 250 MW Combustion Turbine Generators(CTGs).Responsibilities: Supervising all structural activities of 220KV & 500KV buildings. Giza North 1500MW Power Plant, EgyptOCI has been awarded the 181million Dollar civil works package for the combined cycle powerplant from Cairo, Electricity Production Company to be executed in 32 months. The projectconsists of three modules each module includes two 250 MW Combustion Turbine Generators(CTGs).Responsibilities: Supervising all structural activities of 220KV & 500KV buildings.
-
-
-
Orascom Construction PLC
-
Egypt
-
Construction
-
700 & Above Employee
-
Associate Civil Engineer (Summer Internship)
-
Jun 2011 - Sep 2011
Emaar Misr - Mivida Entry villas Project, EgyptParcel 3 is called Entry Villas and contains 110 villas (concrete and block works, architecturalworks, interior decoration & finishes, and MEP works), each having an area varies from 228 m²to 340 m²Responsibilities: Supervising the execution of all structural activities of different villas’ types. Emaar Misr - Mivida Entry villas Project, EgyptParcel 3 is called Entry Villas and contains 110 villas (concrete and block works, architecturalworks, interior decoration & finishes, and MEP works), each having an area varies from 228 m²to 340 m²Responsibilities: Supervising the execution of all structural activities of different villas’ types.
-
-
-
Orascom Construction PLC
-
Egypt
-
Construction
-
700 & Above Employee
-
Associate Civil Engineer (Summer Internship)
-
Jun 2010 - Sep 2010
El-Ain El Sokhna Power Plant, EgyptOCI was awarded the site services contract CP-123 which includes warehouse building,administrative building, and Employer’s villasResponsibilities: Assisting the Site Engineer in the execution of the structural activities for theEmployer’s villas. El-Ain El Sokhna Power Plant, EgyptOCI was awarded the site services contract CP-123 which includes warehouse building,administrative building, and Employer’s villasResponsibilities: Assisting the Site Engineer in the execution of the structural activities for theEmployer’s villas.
-
-
Education
-
El Shorouk Academy
Bachelor’s Degree, Civil Engineering