Samuel Sirait
Catalogue Manufacturing Supervisor at TACO Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Bronze Achievement OPEXCON 20
SHIFT Indonesia - Operational Excellence CommunityNov, 2020- Nov, 2024 -
CERTIFIED SOLIDWORKS PROFESSIONAL (CSWP) - Mechanical Design
Dassault SystèmesSep, 2020- Nov, 2024 -
CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) - Mechanical Design
Dassault SystèmesAug, 2020- Nov, 2024 -
Project Management Essentials Certified
Management & Strategy InstituteAug, 2020- Nov, 2024 -
Six Sigma Yellow Belt
6SIGMAstudy - The global certification body for six sigma certificationsAug, 2020- Nov, 2024
Experience
-
TACO Group
-
Indonesia
-
Wholesale Building Materials
-
200 - 300 Employee
-
Catalogue Manufacturing Supervisor
-
Feb 2023 - Present
-
-
-
KDS Indonesia (Daishinku Corp.)
-
Cikarang Barat, Jawa Barat, Indonesia
-
Chief Production
-
Feb 2021 - Feb 2023
Responsibility: 1. Ensuring the production process to achieve the production targets by managing the PPC 2. Controlling the CTQ by managing the 2 QC Staff to ensure achieve of yield 3. Check the most important problem of production LOT to collect the problem and make the problem solve 4. Manage the QCC team in the production area to improve or solve the quality issues Project: 1. Reduce 0,2% Base Plating NG 2. Increase 0,7% yield by reduce NG of "Dottite nempel di atas base" 3. Increase 3,1% yield by reduce "Over Frequency" NG 4. Reduce 96,8% "Cap Geser" NG Show less
-
-
-
Boehringer Ingelheim
-
Germany
-
Pharmaceutical Manufacturing
-
700 & Above Employee
-
Internship Program
-
Feb 2020 - Feb 2021
Production Dept. | Aug 2020 – Feb 2021 Project: - Reduce 89,6% defect of print VDR from 3,5𝜎 (21290 PPM) to 4,6𝜎 (1894 PPM). - Reduce 76% set up time auto blister packing machine from 4,5-hour to 1,1-hour SCM Dept. | Mei 2020 – Aug 2020 - Managing Cycle Time and Lead Time KPI report. - Managing Inventory Capacity Routing. - Managing production budget target (CoGS) vs actual production budget routing. - Helping the planner manage MRP for PM/RM for 1 month and calculate RCCP for validate MRP to production capacity. Facility Maintenance Div. | Feb 2020 – Mei 2020 - Contributing to the improvement with QCC teams. - Create CAD & CAE part design for production machines and CFD for HVAC, Compressor. Show less
-
-