Samuel Sirait

Catalogue Manufacturing Supervisor at TACO Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
West Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Bronze Achievement OPEXCON 20
    SHIFT Indonesia - Operational Excellence Community
    Nov, 2020
    - Nov, 2024
  • CERTIFIED SOLIDWORKS PROFESSIONAL (CSWP) - Mechanical Design
    Dassault Systèmes
    Sep, 2020
    - Nov, 2024
  • CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) - Mechanical Design
    Dassault Systèmes
    Aug, 2020
    - Nov, 2024
  • Project Management Essentials Certified
    Management & Strategy Institute
    Aug, 2020
    - Nov, 2024
  • Six Sigma Yellow Belt
    6SIGMAstudy - The global certification body for six sigma certifications
    Aug, 2020
    - Nov, 2024

Experience

    • Indonesia
    • Wholesale Building Materials
    • 200 - 300 Employee
    • Catalogue Manufacturing Supervisor
      • Feb 2023 - Present

  • KDS Indonesia (Daishinku Corp.)
    • Cikarang Barat, Jawa Barat, Indonesia
    • Chief Production
      • Feb 2021 - Feb 2023

      Responsibility: 1. Ensuring the production process to achieve the production targets by managing the PPC 2. Controlling the CTQ by managing the 2 QC Staff to ensure achieve of yield 3. Check the most important problem of production LOT to collect the problem and make the problem solve 4. Manage the QCC team in the production area to improve or solve the quality issues Project: 1. Reduce 0,2% Base Plating NG 2. Increase 0,7% yield by reduce NG of "Dottite nempel di atas base" 3. Increase 3,1% yield by reduce "Over Frequency" NG 4. Reduce 96,8% "Cap Geser" NG Show less

    • Germany
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Internship Program
      • Feb 2020 - Feb 2021

      Production Dept. | Aug 2020 – Feb 2021 Project: - Reduce 89,6% defect of print VDR from 3,5𝜎 (21290 PPM) to 4,6𝜎 (1894 PPM). - Reduce 76% set up time auto blister packing machine from 4,5-hour to 1,1-hour SCM Dept. | Mei 2020 – Aug 2020 - Managing Cycle Time and Lead Time KPI report. - Managing Inventory Capacity Routing. - Managing production budget target (CoGS) vs actual production budget routing. - Helping the planner manage MRP for PM/RM for 1 month and calculate RCCP for validate MRP to production capacity. Facility Maintenance Div. | Feb 2020 – Mei 2020 - Contributing to the improvement with QCC teams. - Create CAD & CAE part design for production machines and CFD for HVAC, Compressor. Show less

Community

You need to have a working account to view this content. Click here to join now