Samuel Roberts

at IC Power
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
León, León, Nicaragua, NI

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Peru
    • Oil and Gas
    • 1 - 100 Employee
      • May 2016 - Present

      Now I've got 3 plants to look after !. Thank goodness I can use my cardinal to commute between them.

      • Jan 1999 - Present

      70 MW power barge “Margarita II”, Corinto, Nicaragua.

    • Head of transmission Security
      • Jan 1995 - Jan 1998

      . Developed a PC based SCADA/AGC system to supplement existing outdated system. This development was presented as a paper in the 1996 "CONCAPAN" IEEE conference in Panama. Participated in the drafting of the "Normativas de Operación" that regulate Nicaragua's merchant power market. . Developed a PC based SCADA/AGC system to supplement existing outdated system. This development was presented as a paper in the 1996 "CONCAPAN" IEEE conference in Panama. Participated in the drafting of the "Normativas de Operación" that regulate Nicaragua's merchant power market.

    • Senior Software Engineer
      • Jan 1993 - Sep 1995

      Developed software for the Energy Management System controlling the New England power grid. 1992: Associate Engineer at the New England Power Planning. Performed multi-area reliability studies for the Northeast Power Coordinating Council. Developed software for the Energy Management System controlling the New England power grid. 1992: Associate Engineer at the New England Power Planning. Performed multi-area reliability studies for the Northeast Power Coordinating Council.

    • Head of the Electronics Lab
      • Jan 1987 - Jan 1991

      Led/participated in the installation and commissioning of the National Load Dispatch Center SCADA / AGC System. Specialized in hardware. Performed installation, testing and commissioning of a 3 link, 120 channel microwave system, a 9 link power line carrier system, and the complete telephone communications system for the National Load Dispatch Center project. Repaired, adjusted and tested turbine governors and voltage regulators for 25 to 45 MW generators. Headed a team of engineers for measuring transfer functions of governors and exciters of all generators in the Nicaraguan network. Designed, programmed and tested the software for the PLC that controls the Asturias pumping station, part of the 50 MW CENTROAMERICA hydroelectric complex. Show less

Education

  • 2005 MBA UAM Managua and ITESM Mexico
    MBA, Business Administration
    2005 - 2006
  • Rensselaer Polytechnic Institute
    MSC, Electric Power
    1991 - 1992
  • Sofia University St. Kliment Ohridski
    BS, MS, Physics; radiophysics and electronics
    1981 - 1986

Community

You need to have a working account to view this content. Click here to join now