      • May 2019 - Present

      More than 25 years of experience in project management including site supervision. Comprehensive experience in Mechanical, implementation execution & monitoring involving liaising with other disciplines. Outstanding skills in managing various kind of projects such as Construction of Airports, High-rise towers, Infrastructure, Villas and school buildings. Well versed in executing construction of civil and MEP projects involving construction methodology development, contract administration, in compliance to project scope of work. Show less

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • Deputy Project Manager
      • Sep 2015 - Apr 2019

       Involved in the technical evaluation with site team of MEP systems including drainage, firefighting, water supply, HVAC, irrigation, BMS, BHS (Baggage handling system) blue water system, external networks, elevators, as well as airport special systems.  Handling the Organizational issues with project manager and process for the mobilization of consultant staff.  Supervising the weekly, monthly progress meetings and follow with client with project key issues related to current activities on site.  Supervising the weekly, monthly technical meetings along with contractor and consultant staff and sort out the critical and technical issues and follow ups with previous issues.  Managing the consultant staff team including heads of all disciplines and having technical meetings to mitigate the risks.  Supervising the project with full team by sudden site visits as well as with contractor managerial staff.  Closely monitoring the all discipline logs with delay and impact on project.  Give guidance, timeline and deadlines of the assignments to concerned staff members for their work.  Managing the critical path and the risk assessment plan with project team members to see the possible risk factors for the project finish milestone.  Monitor the project progress with project team with different ways like to see the plan, actual and forecasted S-Curve.  Monitor the project cash flow as plan and actual and to see the contractor invoices as per contractual terms and conditions and give guidelines to the team in this regard.  Monitor with the project site team manpower curve and histograms that if contractor is having sufficient manpower.  Technical evaluations are held with the site team and management.  Correspondences and letters between client and contractor for the progress, technical, administrative issues.  Monitor closely procurement plan and long lead with contractor procurement manager and project director. Show less

    • United States
    • Professional Services
    • 700 & Above Employee
    • MEP MANAGER
      • Nov 2013 - Aug 2015

       Head of MEP department to monitor and review the design issues, specifications.  Strong coordination and give instructions to each MEP manager on sites related to technical issues.  Final review and approval for the all long lead MEP items. And proper tracking of the procurement at all stages of projects.  Ensure successful achievement of project mission statement and goals and be responsible for all day-to-day activities.  Follow up with various departments within the company in all Project related matters of the operation of the Project.  Monitor the contractual issues related to the day-to-day of all Projects.  Determined all Project requirements (Technical and General).  Weekly, Monthly site visits with core team management and attend the progress and technical meetings with contractors/clients.  Ensured the timely submittal of all project submittals and obtaining approvals. (Samples, Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules, Programs etc.)  Arranged timely obtaining of all clearances, approvals, permissions, etc as may require from time to time from any of the statutory authorities during the execution of the Projects.  Schedule and plan all projects in line with Master Program in co-ordination with the core team Planning Engineer.  Manage all project related instructions from the Client, stakeholders etc and transmit, communicate and arrange effective action in co-ordination with the Management. Show less

    • Deputy MEP Manager
      • Oct 2011 - Nov 2013

       Fully in-charge of all Electro/Mechanical Project activities.  Ensure successful achievement of project mission statement and goals and be responsible for all day-to-day activities.  Follow up with various departments within the company in all Project related matters of the operation of the Project.  Responsible for planning and scheduling of all major activities of the Project to achieve timely completion of the Project.  Monitor the contractual issues related to the day-to-day running of the Project.  Responsible for managing a Staff/Labor in the project.  To be overall responsible for overseeing and effective execution of all project related activities under the instructions of the Management.  Determined all Project requirements (Technical and General).  Ensured the timely submittal of all project submittals and obtaining approvals. (Samples, Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules, Programs etc.)  Arranged timely obtaining of all clearances, approvals, permissions, etc as may require from time to time from any of the statutory authorities during the execution of the Project.  Schedule and plan all project activities in line with Master Program in co-ordination with the Planning Engineer.  Manage all project related instructions from the Client, Engineer, Main Contractor, etc and transmit, communicate and arrange effective action in co-ordination with the Management.  Give all notices, etc to the Client/Engineer/Main Contractor under the instructions of the Project Director.  Attended all project related meetings with Client/Engineer/Main Contractor and reporting back to the Division Manager on the proceedings.  Assignment of all project related activities to all resources.  Evaluate the requirement of all project resources (materials, machinery, manpower) as per schedule and arrange for the availability of the same. Show less

  • Mac Air LLC.
    • Dubai, U. A. E.
    • MEP Project Manager
      • Jul 2000 - Nov 2008

       Lead and Communicate with Field Supervision, Subcontractors and Vendors to assist them in working to the Project Schedule as it pertains to MEP’s.  Administer financial aspects of the subcontracts, and purchase orders.  Build effective working relationship with client and project team members  Project Start-Up  Review the general contract and contract documents and confirm the budget setup and project milestones in conjunction with Project Lead.  Create a schedule of values and project logs, plan for project safety and mobilization, including review and validation with team members.  Maintain the schedule, write scopes of work, distribute and log subcontracts, write required contract riders and purchase orders, and confirm compliance with project insurance requirements.  Review subcontractor references, obtain Subcontractor bonds, and maintain project files.  Maintain and manage all purchase and delivery schedules, change order processes, shop drawings, document control logs, Owner, Architect and Subcontractor correspondence.  Work with Purchasing in setting up/executing trade buyout including: defining scope of work, authoring Exhibit B’s, ensuring scope coverage, coordinating buy and project schedules.  Attend all schedule and management MEP meetings necessary to monitor and manage the project, chairing as appropriate.  Manage all requisitions and payments including lien releases and project payroll and maintains best possible cash flow throughout the project, communicating issues proactively.  Project Closeout  Deliver all necessary manuals to the Owner, consolidates project documentation and files.  Manage subcontractor closeout, transfer of utilities, owner training, and punch list process.  Deliver all warranties, as-builts and training to the owner. Show less

    • Mechanical Engineer
      • Sep 1993 - Jan 2000

       Responsible for the implementations and monitoring of all mechanical activities at the site as per approved drawings and methods and safety rules.  Attend meetings related to the construction project, and go on job site walks to ensure the project is being built properly.  To ensure the equipment is erected, pre-commissioned, tested (if required), and commissioned in accordance with agreed contracts. Coordination with equipment suppliers is an important task during construction.  Maintain the records of the tasks, which was the basis for troubleshooting later and may also impact the warranty claims.  Supervises all installations of machines and equipment at site thereby ensuring fulfillment of industry standards and requirements.  Review the works produced by the design engineers and maintains necessary coordination with other discipline engineers for the smooth flow of projects.  Review the progress meeting and inspect the machine components or other machinery.  Incoming Inspection – checking the dimensions of the incoming material (rather of the sample) to ensure that the material’s dimensions are within the permissible limits.  Air Conditioning – installing/planning the air conditioning systems of buildings (sans the electronics part) is the job of mechanical engineers.  Up-keep and maintenance of various machines used at the site.  Ensuring proper erection and alignment of pumps and turbines.  Execution and proper installation of their respective piping connection and quality analysis of joints. Making reports of everything and interact with clients.  Estimates prepare and assign resources such as manpower, materials, consumables, equipment, tools, etc., required for all Mechanical and related works prior to execution.  Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to the execution. Show less