Samer Mohammed,PMI-PMP®
Procurement and Contracts Manager at AL KAWTHER INDUSTRIES LTD- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
Credentials
-
PMP® Certification Training Course
Project Management InstituteJul, 2020- Nov, 2024 -
Project Management Professional (PMP)
Project Management InstituteJul, 2020- Nov, 2024
Experience
-
AL KAWTHER INDUSTRIES LTD
-
Saudi Arabia
-
Industrial Machinery Manufacturing
-
100 - 200 Employee
-
Procurement and Contracts Manager
-
Aug 2021 - Present
-
-
Sr.Tendering & Project Procurement Engineer.
-
May 2015 - Aug 2021
Experience in Installation of water, Waste Water Treatment Plants & Pump Station.1-Installation of Bar Screen, Dewatering Machines, Air Blower , Pumps , Clarifiers, RO System.2-Experience in Design and Installation of (MV/LV) Power Substations3-Experience in Electrical power calculation, Single Line Diagram, Cables, Sizing of Transformer and Generators, ATS.4-Experience in Design and Installation of industrial Automation (PLC, HMI, and SCADA Systems).5-Experience in Design and Installation of Motor Control Center (Schneider, ABB).6-Estimating the cost of Big Project.7-Project Procurement Engineer. Show less
-
-
-
-
Project Engineer
-
Aug 2013 - May 2015
Project Achievement : 1.Station Expansion of wastewater treatment (Extended Aeration) in housing strategic missile base. (GLS Tank) 1. Station Expansion of wastewater treatment (Extended Aeration) 400 m3/day (Extend Aeration) situated housing ground forces. (GLS Tank) Job Responsibilities - Daily site report . - Prepare the P & I Diagram. - Prepare the Single Line Diagram. - Request for Quotations for long lead items. - Issuance & follow-up of the P.O. - Control Panel Fabrication. - Interconnection of Cables. - O & M Manual. - Testing And commissioning. Show less
-
-
-
MENA-Water
-
United Arab Emirates
-
Environmental Services
-
1 - 100 Employee
-
Electrical Engineer
-
Sep 2012 - Aug 2013
1-Programmed station control operator is automatically using PLC program. 2-Been maintained Air Blower, rehabilitate and installation. 3-Reviews connected air blower star delta to protection current start. 4-Maintenance of all aeration system.. 1-Programmed station control operator is automatically using PLC program. 2-Been maintained Air Blower, rehabilitate and installation. 3-Reviews connected air blower star delta to protection current start. 4-Maintenance of all aeration system..
-
-
Education
-
Sudan University of Science and Technology
Bachelor of Engineering (B.E.), Electrical and Electronics Engineering