Samer Ayaad

Chief Surveyor at BAUER International FZE
  • Claim this Profile
Contact Information
Location
Amman, Jordan, JO

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Chief Surveyor
      • Jun 2022 - Present
    • Quantity Surveyor - Land Surveyor
      • Jan 2018 - Nov 2022

      Project: The Rehabilitation and Reinstatement Works of Dike 19 - Arab Potash Company (cost 82 million). • Performed measurements for structural and architectural works to prepare cost estimates for projects. • Facilitated construction by mapping out utility installations and establishing reference points, grades and elevations. • Supervised survey projects measuring volume capacity of landfills and containment ponds. • Calculated correct costs for project-specific goods and services by gathering information from team members, sub-contractors and vendors. • Reviewed all consultant drawings and made recommendation to adjust site requirements. • Utilized cost estimation systems to document project information, create estimates and revise project costs to reflect current data. • Using any kind of surveying Equipment and coordinate between the drawings and the site. • Checking of bill of quantity and drawings and comparison between them. Show less

    • Land Surveyor
      • May 2017 - Jan 2018

      Project: Expansion of Al-Hussein Thermal Plant (cost 60 million). • Compiled measurement and marker data from plats and drawings using public records to determine geographical boundaries of land parcels and utility locations. • Measured and marked property lines and key topographic features. • Set up precise measurement and control equipment. • Used Trimble and AutoCAD to create detailed maps from raw field data. Project: Expansion of Al-Hussein Thermal Plant (cost 60 million). • Compiled measurement and marker data from plats and drawings using public records to determine geographical boundaries of land parcels and utility locations. • Measured and marked property lines and key topographic features. • Set up precise measurement and control equipment. • Used Trimble and AutoCAD to create detailed maps from raw field data.

    • Jordan
    • Civil Engineering
    • 200 - 300 Employee
    • Quantity Surveyor
      • Aug 2014 - May 2017

      Project: Al-Karak Dam (cost 11 million). • Managed and coordinated cost, availability and timely delivery of materials and project schedules for suppliers. • Utilized cost estimation systems to document project information, create estimates and revise project costs to reflect current data. • Calculated correct costs for project-specific goods and services by gathering information from team members, sub-contractors and vendors. • Reviewed all Tender drawings and made recommendation to adjust site requirements. • Provided accurate estimates by defining scope, timelines, potential setbacks and limitations. • Collected historical cost data to estimate costs for current or future products. Show less

    • Quantity Surveyor
      • Feb 2014 - Aug 2014

      Project: Infrastructure Design and Construction Supervision for Al Rayyan Hills Project (cost 3 million). • Performed measurements for structural and architectural works to prepare cost estimates for projects. • Managed and coordinated cost, availability and timely delivery of materials and project schedules for suppliers. • Calculated correct costs for project-specific goods and services by gathering information from team members, sub-contractors and vendors. • Used AutoCAD Civil 3D and Excel to amend project design changes. • Reviewed all consultant drawings and made recommendation to adjust site requirements. • Estimated and analyzed work performed to request payment from clients. Show less

    • Senior Land Surveyor
      • May 2007 - Feb 2014

      Arab Towers Contracting Company (ATCCO), Amman, Jordan • Worked in Several Project with company as follow : 1. IKEA Jordan (Amman) cost 32 million. 2. Expansion of Jordan Bromine Company (Ghor Safi) cost 12 million. 3. Rehabilitation of Faisal Street - Downtown (Amman) cost 1.5 million. 4. Manaseer Villas (Amman) cost 45 million. 5. Porsche Service and Maintenance Center (Amman) cost 1 million. 6. Rehabilitation of Rainbow Street (Amman) cost 1.5 million. • Using any kind of surveying Equipment and coordinate between the drawings and the site. • Measured and marked property lines and key topographic features. • Facilitated construction by mapping out utility installations and establishing reference points, grades and elevations. • Performed field calculations to complete assessments. • Followed local, regional and national guidelines for land surveying. • Supervised survey projects measuring volume capacity of landfills and containment ponds. • Assessed individual survey project needs and planned workflows. Show less

    • Land Surveyor
      • Nov 2005 - May 2007

      Project: Zara Ma'in Water Treatment Plant (Cost 135 million). • Consulted public records and contacted previous owners to conduct research on ownership, usage and zoning history. • Compiled measurement and marker data from plats and drawings using public records to determine geographical boundaries of land parcels and utility locations. • Performed field calculations to complete assessments. Project: Zara Ma'in Water Treatment Plant (Cost 135 million). • Consulted public records and contacted previous owners to conduct research on ownership, usage and zoning history. • Compiled measurement and marker data from plats and drawings using public records to determine geographical boundaries of land parcels and utility locations. • Performed field calculations to complete assessments.

Education

  • Diploma Academy
    Surveying Engineering, Diploma
    2005 - 2005

Community

You need to have a working account to view this content. Click here to join now