Sameer Bhatnagar
Deputy General Manager CHP at Uprvunl Nigam Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Hindi -
Topline Score
Bio
Experience
-
Uprvunl Nigam Limited
-
India
-
Consumer Services
-
1 - 100 Employee
-
Deputy General Manager CHP
-
Dec 2017 - Present
Operation & Maintenance of Complete Coal Handling Plant , Coal Transportation & Unloading , Crushed Coal Stacking and Reclaiming ,Coal Feeding in Raw Coal Bunkers through various Wagon Tripplers ,Coal Crushers , T.Ps , Conveyor Belts ,e.t.c Operation & Maintenance of Complete Coal Handling Plant , Coal Transportation & Unloading , Crushed Coal Stacking and Reclaiming ,Coal Feeding in Raw Coal Bunkers through various Wagon Tripplers ,Coal Crushers , T.Ps , Conveyor Belts ,e.t.c
-
-
-
-
Deputy General Manager O & M Boiler , Mills and Turbine of 500 MW DTPS
-
Feb 2016 - Dec 2017
Deputy General Manager O & M in 500 MW Thermal Power Plant ,including Commissioning of Coal Fired Boiler , Bowl Mills and Steam Turbine . Managing Complete Operation and Maintenance works and Team Management . Deputy General Manager O & M in 500 MW Thermal Power Plant ,including Commissioning of Coal Fired Boiler , Bowl Mills and Steam Turbine . Managing Complete Operation and Maintenance works and Team Management .
-
-
-
-
Executive Engineer (O&M) BMD
-
Jun 2007 - Jan 2016
Managing the Operation, Overhauling & Breakdown Maintenance of Main Boiler of Coal Fired 500 M.W unit. Managing overall operation & maintenance of Main Boiler Pressure Parts, Safety Valves, H.P. and L.P.Valves, Air and Flue Gas Ducts, Wall Blowers, Long Range Soot Blowers, Pulverized Coal Burner Assemblies , Oil Guns Assembly, Boiler Circulation Pumps, Air Pre Heater , Electro Static Precipitator &; Submerged Scrapper Conveyor .
-
-
Assistant Engineer (O&M)
-
Feb 1996 - Jun 2007
Overhauling, Running & Breakdown Maintenance of Main Boiler of Coal Fired 500 M.W,Maintenance of Main Boiler Pressure Parts, Safety Valves, H.P. and L.P.Valves, Air and Flue Gas Ducts, Wall Blowers, Long Range Soot Blowers, Pulverized Coal Burner Assemblies and Oil Guns Assembly, Boiler Circulation Pumps.Operation & smooth running of Toshiba, Japan's 500 M. W.Turbine of Coal Fired 500 M.W,To maintain continuous generation of steam through proper functioning of main Boiler and its accessories. Also, the stability of fireball in Boiler with the use of oil fired guns and coal burners for continuous Generation . Smooth rolling of Turbine and finally synchronizing the unit with the grid. Show less
-
-
Assistant Engineer (Training).
-
Feb 1995 - Feb 1996
Joined as trainee in 500 M.W, simulator, Anpara and was absorbed in the running plant as assistant engineer for turbine side independently. In the team size of two the role included start-up & shut-down of turbine accessories and main turbine from the U.C.B.
-
-
Education
-
Karnatak University
BE, Mechanical Engineering