Sambhu Saran Mitra

Senior at Mowah CO.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Dubai, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Construction
    • 1 - 100 Employee
    • Senior
      • Aug 2021 - Present

    • Saudi Arabia
    • Utilities
    • 700 & Above Employee
    • Executive Manager - Desalination Engineering
      • Jul 2013 - Present

      • Support of Technical Services for Business Development team to provide leadership, guidance, outlines, schedules, and direction for all proposal stakeholders, as well as continual proposal process improvement. • Owns the entire proposal process through the opportunity life cycle from draft RFP release to post-proposal submission activities and actively participating in the proposal development for large-scale IWP/ IWPP business opportunities in desalination sector Middle East. • Able to manage multiple proposals or task order responses concurrently. • Provide value creation and innovation as Technology Department. • Uses performance data objectively to maintain and improve Utilities' functions. • Establishes and leads results oriented innovation and continuous process improvement projects. • Ensure that the engineering review comments from the technical team are appropriate and consistent with the contract. • Develop procedures for the efficient processing of the review documents. Manage budget change control for home office activities. • Understand the Contractual requirements of the EPC Contractor. Ensure that the contract requirements are followed by the EPC Contractor. • Guide and manage the technical team in this regard. Provide clear, concise and timely reporting of engineering review status. • Project handled during this periods are:  Barka 1 Exp 1, Oman – 45,460 m3/d  Barka 1 Exp 2, Oman – 56,825 m3/d  Shuaibah 3 Exp 2, Saudi Arabia – 250,000 m3/d  Qurayyat, Oman – 200,000 m3/d  Az Zour North 2, Kuwait – 122,742 m3/d, 340,950 m3/d MED  Salalah 3, Oman – 113,650 m3/d  Umm Al Quwain, UAE – 204,570  Rabigh 3 IWP, Saudi Arabia – 600,000 m3/d Show less

    • Asst Vice President (RO Operations)
      • Mar 2010 - Jun 2013

      • Basic design and engineering depending on the raw seawater quality at various sites. Pretreatment section dissolved air floatation, clarification, media filtration, etc. this includes Membrane filtration and identification of proper membrane, HP pump, energy Recovery Devices specification and suitable parameter to match system. Set up pilot plant design, pilot testing and analysis of pilot study for finalization of plant configuration. • Excel based modeling various desalination, solar desalination technologies to identify site specific technical solution like design, engineering and best energy solution for water tariff optimization, etc. • Projects handled in this tenure:  Shuaibah, Saudi Arabia – 150020 m3/d  Shuwaikh, Kuwait – 136,000 m3/d  Tuas 2, Singapore – 318,500 m3/d  Jeddah 3, Saudi Arabia – 240,030 m3/d  Ras Al Khair, Saudi Arabia – 309,130 m3/d, 727,320 m3/d MSF  Busan RO, Korea – 45,460 m3/d  Escondida, Chile – 220,000 m3/d Show less

    • Utilities
    • 200 - 300 Employee
    • Water Plant Manager
      • Sep 2006 - Feb 2010

      • Officiating for Operations Manager and officiated as Plant manager. • Cut down water operation cost by 40% - 4 MUSD to 2.5 MUSD by optimizing the process and chemical regime. • World biggest hybrid desalination plant is in Fujairah with 37.5 MIGD SWRO and 62.5 MIGD MSF and I am responsible for all Operation and Maintenance of complete Desalination Plant And for last nine months after took over of plant Water Availability is 100% • This is 4th year of operation and due to lack of Membrane replacement plan existing plant is in critical phase of operation. Optimized complete process, chemical regime, cleaning regime and plant is running with rated output. • Winter is the lean period for MSF operation and in last winter I have we did the chemical cleaning of MSF for the first time with optimizing process and time. • Also optimized the process and chemical regime to get better performance ration in MSF units. • Made all the procedures and standards for better life of water/ steam cycle in Power and MSF block • Handing corrosion reporting and insurance for technical inputs • Implemented Environmental Monitoring Program for this plant. • Minimized waste water and solid waste in the plant – working on various recycling process for betterment of Environment Compliance. • Working for ISO 17025, ISO 9001, ISO 14001 and OSHA 18000 and hope to complete them by 2010 1Q. • Maintaining the existing plant with highest safety and house-keeping standards. Additionally worked for proposals for:  Fujairah 2 IWPP – 136,380 m3/d RO and 454,600 m3/d Thermal  Salalah 1 IWPP – 68,090 m3/d RO Show less

  • AES Kelanitissa, Sri Lanka
    • Colombo, Sri Lanka
    • Team Leader - Balance of Plant
      • Sep 2004 - Aug 2006

      • Worked as acting Operation Manager and officiated as Plant manager. • Annual Operations budgeting and complete water and fuel Management of site. • Biggest challenge at this site is raw water quality – there is intrusion of seawater in river stream between December and March. This caused condenser tube failure in year 2003-04. This year we could able to manage to maintain water salinity to a minimum level by taking water in predetermined time using tide chart. Started using new chemical to cover this high stressed water condition. • Changed most of the chemicals and finalized Nalco contract for complete water treatment. Also reduced treatment chemical cost by 30% in a year. • Chemicals were changed for safe handling and new chemical SMS are documented. • Documented SOPs and qualification book for BOP – including WTP, Fuel handling, air compressor, etc. • To solve the water salinity problem specified above proposed for variable frequency drive SWRO at the upstream to present RO and going to install it by next year. • Actively involved in safety and environmental related matters. • Additionally taking part in redesigning GT inlet air filters and involved in day to day operational activities record monitoring, record logging, helped in making software for e-recording, etc. • Made excel base site specific software for chemical reporting, water and fuel consumption and inventory control for bulk chemicals. And with the help of software specialist trying to develop it in VISUAL-BASIC program for elogging and reporting. • Fuel procurement and fuel management and looking for adding up LNG facility. • Fuel inventory management based on fuel price forecast to reduce losses. Show less

    • Plant Chemist and Environment Management
      • Jan 2003 - Aug 2004

  • GE BetzDearborn
    • Bangladesh, India
    • Technical Consultant
      • Dec 2001 - 2002

  • ENRON -Dabhol Power Company
    • Ratnagiri Area, India
    • Manager – Environment and Chemical Services.
      • Nov 1997 - Dec 2001

      • Managing water treatment plant and laboratory for analysis of water, oil, fuel. Maintenance of water/ steam chemistry for HRSG. Managing Environment management for total site inclusive of pollution monitoring, oil spill response, waste Handling, Hazardous Material Handling, different STP functioning, Incinerator and Bio-degradable waste handling, etc. • Worked as Management Representative for ISO 9000 and ISO 14000 certifications. • Setup state-of-art Laboratory for power plant Chemistry and Environment with instrument like Inductively Coupled Plasma – Atomic Emission, Gas Chromatography, Ion Chromatograph, Auto Titrator, CHN Analyzer, etc. and worked on them. • Commissioning of Steam Water Sampling table for HRSG and Maintenance of water chemistry in HRSG at fluctuating load of operation. Early detection of condenser tube leak and boiler tube leakage, monitoring and restoration of chemical parameter. • Early detection of Transformer dissolved gases in GC and protection of transformer from damage. Changing the lubricity additive in naphtha fueled gas turbine to avoid frequent tripping. • Getting different consent and approval from State/Central Pollution Regulatory Authority and annual environment statement preparation. Assisting on Techno-legal aspects of Environmental Cases and liaison with regulatory authorities. • Managing Environment management for total site inclusive of waste Handling, Hazardous Material Handling, different STP functioning, Incinerator, Bio-degradable waste handling, Air emission, effluent water, etc. Show less

    • Manager – Chemistry & Environment
      • Jun 1996 - Oct 1997

    • Dy Manager
      • Jul 1984 - Jun 1996

Education

  • University of Southampton
    PhD, Environmental Engineering
  • Indian Institute of Technology, Kharagpur
    Master of Science (MSc), Chemistry
    1980 - 1982
  • IChemE, UK
    AMIChemE
  • IEI India
    AIME, CEng (Chemical), Chemical Engineering

Community

You need to have a working account to view this content. Click here to join now