Sam Webb
Piping Supervisor at Cavendish Northern Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Piping Supervisor
-
Oct 2016 - Present
-
-
-
LX Engineering (North) Ltd
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Pipefitter
-
Aug 2016 - Oct 2016
-
-
-
Bilfinger
-
Germany
-
Mechanical Or Industrial Engineering
-
700 & Above Employee
-
Pipe Fitter
-
Feb 2016 - Apr 2016
-
-
-
Cape plc
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Pipefitter
-
Aug 2015 - Nov 2015
-
-
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Pipe Fitter/ Charge Hand
-
Sep 2014 - Aug 2015
-
-
Pipe Fitter
-
Jul 2014 - Aug 2014
Based on Fine Organics at Seal Sands. Fabricated and installed carbon and stainless spools. Also fabricated and installed plastic lined spools.
-
-
-
Equans BeLux
-
Belgium
-
Mechanical Or Industrial Engineering
-
700 & Above Employee
-
Pipe Fitter
-
Aug 2014 - Sep 2014
-
-
-
Hertel
-
Oil and Gas
-
700 & Above Employee
-
Pipe Fitter
-
May 2014 - Jul 2014
Based on Air Products site on seal sands. Working on pipe up to 6" carbon steel In the gasifier area. Based on Air Products site on seal sands. Working on pipe up to 6" carbon steel In the gasifier area.
-
-
-
Ledwood Mechanical Engineering Ltd
-
United Kingdom
-
Oil and Gas
-
100 - 200 Employee
-
Pipe Fitter
-
Mar 2014 - May 2014
Working at the ppp3 site on the victrex plant in Fleetwood. Instalation of carbon and stainless upto 6" schedule 80. Working at the ppp3 site on the victrex plant in Fleetwood. Instalation of carbon and stainless upto 6" schedule 80.
-
-
-
Interserve
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Pipe Fitter
-
May 2013 - Mar 2014
Working nightshift on Runcorn TPS waste to energy new build power station, consisting of the fabrication and instalation of pipework in either the fabrication shop or on site. Ranging from 1" carbon to 14" carbon heavy wall including jacketed pipework. October 2013: Transferred on to air products, north tees. Worked mainly on the pipe bridges working with carbon and stainless steel pipe up to 36". Working nightshift on Runcorn TPS waste to energy new build power station, consisting of the fabrication and instalation of pipework in either the fabrication shop or on site. Ranging from 1" carbon to 14" carbon heavy wall including jacketed pipework. October 2013: Transferred on to air products, north tees. Worked mainly on the pipe bridges working with carbon and stainless steel pipe up to 36".
-
-
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Pipe Fitter
-
Mar 2013 - May 2013
Based in the fabrication shop, work consists of all aspects of pipework using either carbon steel or stainless steel. Based in the fabrication shop, work consists of all aspects of pipework using either carbon steel or stainless steel.
-
-
-
-
Pipe Fitter
-
Oct 2012 - Mar 2013
Construction of the Britannia Long Term Compression Unit consisting of fabrication and installation of various size and schedule pipework. Sub contracted to IKM Testing to carry out the punch listing of pipelines, pre test checks, pressure testing, re installation and commissioning after test work has been carried out. Construction of the Britannia Long Term Compression Unit consisting of fabrication and installation of various size and schedule pipework. Sub contracted to IKM Testing to carry out the punch listing of pipelines, pre test checks, pressure testing, re installation and commissioning after test work has been carried out.
-
-
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Pipe Fitter
-
Aug 2012 - Oct 2012
Working on fine organics seal sands, fabricating and installing various size pipework then working in fabrication shop in billingham mainly working with carbon steel with some 316 stainless spools as well. Working on fine organics seal sands, fabricating and installing various size pipework then working in fabrication shop in billingham mainly working with carbon steel with some 316 stainless spools as well.
-
-
-
Doosan Babcock
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Pipe Fitter
-
Jul 2012 - Aug 2012
Working at the ineos oil refinery in grangemouth scotland based on the kg flex project fabricating carbon and stainless steel spools ranging from schedule 40 up to xxs. Working at the ineos oil refinery in grangemouth scotland based on the kg flex project fabricating carbon and stainless steel spools ranging from schedule 40 up to xxs.
-
-
-
Stavanger Contracting and Engineering
-
Stavanger Area, Norway
-
Pipe Fitter
-
Apr 2012 - Jun 2012
Sub contracted to fabricom gdf suez in a fabrication shop, fabricating spools for offshore rigs in a range of sizes and materials from schedule 10 upto xxs and ranging from 3/4 to 12" pipe in carbon, duplex and super duplex. Sub contracted to fabricom gdf suez in a fabrication shop, fabricating spools for offshore rigs in a range of sizes and materials from schedule 10 upto xxs and ranging from 3/4 to 12" pipe in carbon, duplex and super duplex.
-
-
-
Equans BeLux
-
Belgium
-
Mechanical Or Industrial Engineering
-
700 & Above Employee
-
Pipe Fitter
-
Aug 2011 - Mar 2012
Fabrication and instalation of small & large nominal bore carbon steel pipe either off isometric drawings or site measure. Patching up/renewing badly corroded pipework and replacing valves. Fabrication and instalation of small & large nominal bore carbon steel pipe either off isometric drawings or site measure. Patching up/renewing badly corroded pipework and replacing valves.
-
-
-
Cavendish Northern Limited
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Pipe Fitter
-
Aug 2010 - Aug 2011
Work on multiple sites around Teesside and Seal Sands, also worked on Bramall Oil Terminal. Consisting of fabrication instalation and commissioning. Work on multiple sites around Teesside and Seal Sands, also worked on Bramall Oil Terminal. Consisting of fabrication instalation and commissioning.
-
-
-
Equans BeLux
-
Belgium
-
Mechanical Or Industrial Engineering
-
700 & Above Employee
-
Pipe Fitter
-
Jun 2010 - Jul 2010
Pre shutdown and shutdown work on BOC teesport.
-
-
Pipe Fitter
-
Apr 2010 - May 2010
Renew bank of boiler tubes in Wilton wmps power station.
-
-
-
Equans BeLux
-
Belgium
-
Mechanical Or Industrial Engineering
-
700 & Above Employee
-
Pipe Fitter Advanced Apprentice/ Pipe fitter
-
Sep 2007 - Feb 2010
T8 cat recovery project, various Wilton link line jobs, px gasses seal sands,yorwaste site in Scarborough, ensus bio ethanol project, Wilton WMPS power station. These jobs consisted of fabrication installation and hydrostatic pressure testing of small and large nominal bore carbon and stainless steel pipe. T8 cat recovery project, various Wilton link line jobs, px gasses seal sands,yorwaste site in Scarborough, ensus bio ethanol project, Wilton WMPS power station. These jobs consisted of fabrication installation and hydrostatic pressure testing of small and large nominal bore carbon and stainless steel pipe.
-
-
-
Alstom Power @ NETA
-
NETA/ Hartlepool College
-
Advanced Apprentice
-
Aug 2006 - Sep 2007
First year apprentice at NETA training, 2 weeks in the workshop followed by 2 weeks at college throughout the year. After one year I had achieved an NVQ Level 2 installing plant and systems, also completed all college work for the remainder of the apprenticeship. First year apprentice at NETA training, 2 weeks in the workshop followed by 2 weeks at college throughout the year. After one year I had achieved an NVQ Level 2 installing plant and systems, also completed all college work for the remainder of the apprenticeship.
-
-
Education
-
Neta
NVQ Level 3, Installing Plant And Systems -
Ian Ramsey church of england