Sam Warren

Senior Project Manager at adi Mechanical Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Senior Project Manager
      • Jan 2022 - Present
    • United Kingdom
    • Industrial Machinery Manufacturing
    • 100 - 200 Employee
    • Project Manager
      • Jul 2019 - Jan 2022

      Projects Everards Meadows - Turnkey 50Hl Brewery AB InBev - Brewhouse Pipework AB InBev - New Infeed Conveyor Coors - FABS Upgrade Baxter Healthcare - Production Expansion Projects Everards Meadows - Turnkey 50Hl Brewery AB InBev - Brewhouse Pipework AB InBev - New Infeed Conveyor Coors - FABS Upgrade Baxter Healthcare - Production Expansion

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Manager
      • Nov 2015 - Jul 2019

      Projects (Past/Present):Sealed Air, New In-line Mixing System Thornbridge Brewery, Full Brewery Expansion Wye Valley Brewery, Hot Liqueur Skid Boots, Symex 4000l Vessel and Services Porterhouse Brewery, Turnkey New Brewery - Dublin Bath Ales - Turnkey New Brewery St Austell Brewery - New Hot Liquor System Ensuring these projects are delivered on time and within budget whilst our clients ever demanding needs are met.

    • Project Engineer
      • Aug 2013 - Nov 2015

      Projects:• Veolia Water, Thermo Hydrolysis Plant, Oxford (Severn Trent Water)• Packing Line 4 and 5, Slough (Mars UK) • New HTHW Mains, Wakefield (Coca-Cola Enterprises)• Cooling Water Mains, Tutbury (Nestle)• Railside 8” Mild Steel Steam Main, Tutbury (Nestle)• Dove Stainless Steel Platforms, Tutbury (Nestle)• Dove Roasters, Tutbury (Nestle)• Pipework Repair and Maintenance, Tutbury (Nestle) February 2014 – Present day• Pipework Repair and Maintenance, Wakefield (Coca-Cola Enterprises) March 2015 – Present day• CIP Ring Main, Halifax (Nestle)• Modify Rovema Filling Stations, Tutbury (Nestle)Responsibilities:• Producing tenders from a client URS.• Produce basic design drawings/check and amend proposed design drawings• Produce programmes using Microsoft Project• Order materials and ensure all materials are on site in a timely fashion in order to carry out the project.• Attend regular contractor safety meetings with the client’s health and safety director.• Manage small works projects e.g break downs and repairs. This would involve me assessing a break down, offering a solution to the problem, managing labour to resolve the issue and ensuring the work is carried out in a timely fashion to avoid a fall in factory production.• Offer the client (Nestle) any new and innovative products such as valves, pumps etc.• Co-ordinate CDM projects• Ensuring that all welding operations are carried out safely on site and to a standard acceptable of the client. Often this would mean visual inspection of weld penetration but also would mean sending spools of pipe work for NDT. • Completing monthly contract reviews.Being based on site at Nestle and liaising on a daily basis with the end user has allowed me to develop my communication and interpersonal skills. It has also enabled me to develop my knowledge of process pipework and machinery, steam pipe work (expansion bellows, supports and loadings), platform design and coffee roaster installation. Show less

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Contracts Engineer
      • Sep 2012 - Aug 2013

      Projects: • Bell House, Sittingbourne (Interserve) • Chinese Studies, Nottingham Uni (GFT) • Swanwick Hall Sports Hall, Derby (GFT) • Warwickshire Shopping Park, Coventry (Galliford Try) • Chesterfield Market Hall Refurb, Chesterfield (GFT) • Glenfield Hospital Ward 3, Leicester (Interserve) • Southfield House, Derby (Carter Construction) • St. Joseph’s Church, Derby (Davlyn Construction) Responsibilities: • Attending pre-contract meetings and finalising all contractual matters • Reviewing tender summary sheets ensuring that nothing has been missed • Better buying against the tender summary to increase commercial gain • Reviewing programmes and compiling sectional programmes using Microsoft project • Ensuring all materials are delivered to site in accordance with the main contractors programme • Checking design drawings, either done by a consultant or in house, and making amendments to these drawings using AutoCAD • Managing labour to allow a prompt start date on site • Producing application for payments at the end of each month against the contract order • Making regular visits to a number of sites, due to the nature of the company I would have two to three projects running at any one time which meant that time management is essential • Ensuring all work is carried out safely to the main contractors safety procedures • Reviewing progress on site against the contract programme • Highlighting areas on which I feel could be difficult and planning ahead to ensure that there are no mistakes made • Producing commissioning programmes once all installation is complete • Reviewing commissioning reports • Arranging client demonstration of all systems and plant Whilst my actual job title is contracts engineer I regularly produce tenders, whether it be a pre-designed job or design and build. D&B jobs would mean using AutoCAD and sometimes HEVAComp to produce drawings and design parameters. Show less

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Project Engineer
      • Aug 2009 - Nov 2012

      Projects: • Severn Trent New Operations Centre, Coventry (Balfour Beatty Construction) • Queen Elizabeth Hospital, Birmingham (Balfour Beatty Construction) • HMP Featherstone 2, Wolverhampton (Kier Build/Construction) Responsibilities: • Ensuring deadlines are met and delivering high profile projects on time and to budget • Co-ordinating teams on 30+ men to install and test mechanical and electrical systems • Value engineering to provide the greatest quality product but also allowing the business to make a worth while profit • Pre-fabrication design at the company’s off site facility – Most notably a pre-packaged plant room for HMP Featherstone 2. Containing 4 dual foil boilers, a biomass boiler, CHP plant, 2 +10,000 ltr water tanks and numerous pumps and booster sets • Making sure that my team are working safely and in accordance to company procedures, during this time completing a 5 day IOSH Managing Safely and Working Safely course • Procuring materials to ensure that the production can be completed on time • Produce labour forecasts and request additional labour or downsize the labour force on site • Record production against live programmes, if production was starting to slip behind the live programme then I would need to plan how to increase production without losing sight of delivering a high quality service. • Cost analysis along side our commercial manger to keep on top of spending. • Produce as-fitted drawings for client issue • Compile operation and maintenance manuals Show less

    • United Kingdom
    • Pharmaceutical Manufacturing
    • 1 - 100 Employee
    • Quality Control Engineer
      • Jun 2008 - Aug 2009

      Ensuring that the pharmaceuticals produced on the production line met client specification and needs, this included moisture, strength and evaporation tests. Evaluating test results and comparisons with previous batches of products Sampling materials and raw products prior to them being used in production Ensuring that the pharmaceuticals produced on the production line met client specification and needs, this included moisture, strength and evaporation tests. Evaluating test results and comparisons with previous batches of products Sampling materials and raw products prior to them being used in production

Education

  • Liverpool John Moores University
    HND, Building Services Engineering and Management
    2009 - 2012
  • The Pingle School
    2001 - 2008
  • Applied Project Management
    Project Management Qualification

Community

You need to have a working account to view this content. Click here to join now