Sam North

Team Principal at North Motorsport
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Team Principal
      • Jun 2020 - Present

    • United Arab Emirates
    • Oil and Gas
    • 700 & Above Employee
    • Senior Project Engineer
      • Nov 2018 - Jun 2020

  • ZADCO
    • Abu Dhabi
    • Commissioning Team Lead
      • Nov 2013 - Jun 2020

    • Oil and Gas
    • 100 - 200 Employee
    • Completions Team Leader/Deputy Commissioning Manager - In Salah Gas Southern Fields
      • Mar 2011 - Nov 2013

      Working for the client team, manage a multi-discipline team of 14 Construction & Commissioning Engineers in providing assurance of EPC Contractor's Engineering, Construction & Commissioning activities on all equipment and systems up to final handover.• Construction & Commissioning planning, reviewing and development of: Systemisation LOSH drawings, Construction & Commissioning procedures, development of Inspection and Test Plan and check sheets. • Project planning; provide assurance of the EPC Contractor's schedule for Construction & Commissioning activities and to meet planned contractual milestone dates. Track key activities and liaise information back to the Project Management Team. • Work closely with the EPC Contractor to populate the Completions Management database. • Assist the Mechanical Engineering Team, review static and rotating Engineering design as well as participate in Vendor inspections and Factory Acceptance Tests.• Active member of the HAZOP, HAZID and 3D model review teams, providing mechanical, commissioning input to the studies.• Start-up planning, developing a start-up philosophy for the safe introduction of Hydrocarbons to the new facility.• Ensure that preservation and maintenance of all equipment is correctly identified and is being carried out in accordance to the approved standards and procedures. Show less

    • Mechanical Commissioning Engineer - In Salah Gas
      • Jul 2010 - Mar 2011

      Working for the client team, providing mechanical and quality assurance of the EPC Contractor's Engineering, Construction and Commissioning activities. •Demonstrate HSE leadership, ensuring that the EPC contractor and sub-contractors/vendors are abiding to HSE regulations/policies. •Make sure all work implemented as per the approved construction method statements by attending QC inspections as required by the approved Inspection Test Plans.•Participate in tri-party punchlist sub-system walkdown at MC, for sub-systems that have associated static and rotating mechanical equipment.•Assure rigorous implementation of approved Commissioning Method Statements and System Commissioning Procedures by witness of critical Pre-commissioning and Commissioning activities.•Active member of the start up team, introduction of hydrocarbons to the plant, start up of and performance testing. Show less

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer – Commissioning/Operations
      • Aug 2009 - Jun 2010

      Project: Peru LNG Liquefaction Train (Hunt Oil/Repsol), Peru - US$1.5 BillionRole: Led a team of Engineers providing engineering and technical input to the Commissioning & Operations team.• Pre-commissioning activities such as, line blowing and cleaning, flushing and chemical cleaning, line drying, inerting and leak testing.• Utilised WinPCS to track progress of Commissioning activities, ensuring the timely handover of sub-systems.• Commissioning operations that included, GE frame 7 gas turbine driven LNG compressors, Fire water system testing, start up and operation of Utilities equipment (Compressed air, Nitrogen generation, 3 x GTGs), Cool down and unloading of Ethylene and Propane.• Generated Commissioning and operation procedures and manuals. Show less

    • Project Engineer
      • Feb 2009 - Aug 2009

      Project:Peru LNG Liquefaction Train (Hunt Oil/Repsol), Peru - US$1.5 BillionRole: Managed a multi-disciplinary team of Engineers providing engineering support to the Construction team during the construction of the Utilities Area. • Liaised with on-site fabrication yard ensuring spool fabrication was aligned with priority sub-system completions.• Ensured materials were delivered to the work face in timely manner aligning with constructions needs. • Administered all technical queries arising from Utilities area; coordinated with the on-site Technical Services and home office engineering teams to generate viable engineered solutions.• Delivered input to the Project Controls team, providing progress reports and forecast completion dates. Show less

    • Construction / Mechanical Tanks Field Engineer
      • Aug 2005 - Feb 2009

      Role: Provide Engineering assistance to the construction of five double containment 155,000m^3 LNG storage tanks; my daily responsibilities and key tasks under taken included: • Ensure safe working practices are followed using ISO, BS and CB&I standards, maintaining a safe working environment for employees.• Assist in the detailed planning of construction activities by setting milestones to achieve crucial project deadlines, requisitioning material and equipment to be available in order to meet schedule.• Provide technical assistance to the supervision and crew, instigate and follow up technical quires with cooperate design and construction departments; ensure all work conforms to QA & QC standards.• Measure and analyze daily progress and schedule performance, report data to the Project/Construction Manager and the Project Controls department.• Develop construction method statements, plans and procedures as well as heavy lift plans• Design/develop (3D AutoCAD), manage the fabrication of and test temporary structures and construction equipment. Show less

    • Intern/placement Engineer
      • Jan 2003 - Aug 2004

      Role: Lead Design Engineer for the restoration of a large tank farm (total project cost £0.8 million). Responsible for overseeing the development of each of the design stages and making key design decisions, ensuring the design, project team and construction group worked to meet deadlines and key goals. • Lean engineering techniques – Gained an appreciation for Lean, and how it can have an effect on a business. • HAZOP studies – Contributed as an active member of the HAZOP team for a number of studies. • Developed a broader understanding of and improved my man management and influencing skills. • Work Week Management planning skills. • Cost management and control of medium value project schemes Show less

Education

  • The University of Salford
    Bachelor of Science (BS), Aeronautical Engineering
    2001 - 2005
  • Open University
    MSc, Engineering
    2007 - 2013

Community

You need to have a working account to view this content. Click here to join now