Sam Nil

Pre-commissioing at JGC Construction International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rayong, Thailand, TH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Singapore
    • Construction
    • 300 - 400 Employee
    • Pre-commissioing
      • Oct 2021 - Present

    • Mechanical Commissioing Eng.
      • Jun 2018 - Present

    • United States
    • Engineering Services
    • 700 & Above Employee
    • Mechanical Engineer
      • Nov 2020 - Present

    • Mechanical & Piping Completion
      • Feb 2013 - Jun 2014

      Qatar Gas, JBOG Jetty Boil of Gas Recovery Project. LNG- Ras Laffan Industrial City. Qatar Gas Operation Company 09/02/13- PresentMechanical & Piping Completion Active and supportive member of the Qatar gas Operating Company. Project Management Team, Basic duties being involved in the PMT team activities. Basic duties involve coordination with expansion Startup,MPT continually monitoring the day to day progress list. compilation status, advising of field activities via the MCPLUS• Coordinate with the construction contractors and their team of Piping Engineers -Supervisors to create and capturing check sheet, and make sure we have all check sheets cover and record in MC-Plus, Activity is to ensure that the inspection and test Record (ITR) (also known as “check sheet”) covering all construction activity are in place for piping and mechanical equipment work Etc. Equipment installation, piping test pack, Hydro testing, System Mechanical Completion (SMCC) activities for the Project.• Coordinating a Team of Construction-Commissioning personal.• Completion of Mechanical & Piping Completion work and Commissioning piping systems• Ensuring all Construction to sign off all Piping & Mechanical check sheets over before N2-Helium leak testing of the process piping for commissioning • Complete to assist with technical queries as per Qatar gas requirements from Operation Department Division (ODD)

    • Mechanical commissioning start-up
      • Nov 2012 - Jan 2013

      Roles & Responsibilities: Mechanical commissioning start up and operation for combined cycle generate electric, Energy by 2x47 MW SIEMENS Gas Turbine SGT-800 and misuit Steam Turbine SST-800 / 60 MW, Control, and coordination with supervisor commissioning and operation team. Operation running a 110 MW, gas fired cogeneration, The power plant project located in Wangtakian Sub-district, Muang District, Chachoengsao Province. GNNK supply 90 MW of electricity to EGAT and chilled water to industrial customers in the area,

    • Aramis Consultant Company/Owner Engineer Mechanical Commissioning Engineer Punch list for Hand Over
      • Jan 2012 - May 2012

      Mechanical construction punch list item for owner site / Hanas LNG ProjectClearance for Mechanical status to achieve safe compatibility and enabling 'non impact to function ability' (Category 'B') punch item completion verification for Operational Acceptance Certificate Advice and review for piping modify work for gas start up recovery. Mechanical construction punch list item for owner site / Hanas LNG ProjectClearance for Mechanical status to achieve safe compatibility and enabling 'non impact to function ability' (Category 'B') punch item completion verification for Operational Acceptance Certificate Advice and review for piping modify work for gas start up recovery.

    • Mechanical Inspector Owner Eng
      • Oct 2011 - Jan 2012

      Job Description, Engineer Mechanical in charge of mechanical erection, such as Gas Turbine, Steam Turbine, Heat Recovery Steam Generators Cooling Tower and all Balance of Plant materials equipment. Responsible to plan, interpret, verify witness and coordinate all phases of mechanical contract. To maintain coordination with mechanical, and other sub-contractors throughout all phases of the project to ensure that mechanical works Specific responsibilities can include:Ensuring Mechanical construction activities are in accordance with all applicable customer requirements. Checking location and placement of all piping systems; steam, condensate, lube oil, distillate fuel, natural gas, potable water, demineralization systems etc. Reviewing sub-contractor mechanical claims for approval or rejection, Reviewing contractor weekly mechanical plans vs. contract schedule, Ensuring sub-contractors are complying with MC EHS procedures and Preparing daily and weekly reports as required, Attend site meetings as required

    • Mechanical Pre-Commissioning Engineer
      • Dec 2010 - Jun 2011

      Roles & Responsibilities:To carry out pre-commissioning verification and commissioning activities for the project teams on designated major projects onshore, ensuring a safe timely start-up of the new facilities in line check sheet and punch list tracking database.Support the project teams in preparation for construction and commissioning. Monitor construction activities Witness pre-commissioning tests, carried out for vendors and contractors to ensure compliance with standards. Carry out discipline commissioning activities in timely compilation of handover documentationDemonstrate knowledge of requirements for equipment in hazardous areas. The system completion with LNG loading to tanks and sent out to truck loading.

    • TSC Project-Site Manager
      • Jul 2009 - Feb 2010

      Roles & Responsibilities:Review Contractor’s method, QC procedures, ITP and Quality Plan and assist with establishingAcceptable working practices for construction activities.Establish a smooth and efficient working relationship with Contractor personnel. SuperviseContractor’s site activities in accordance with the Projects and Contractor’s specifications, procedures and risks assessments. Maintain day-to-day liaison with Contractor’s site supervisors. Review and comment upon Contractors daily inspection records for activities covered and investigate any anomalies/queries. Ensure that Company’s reputation is maintained and enhanced though all construction-related activities. Responsible for carrying out work for module structure erection. Piping fabrication &installation for Mainly system, main piping header, Nitrogen Fuel Gas, Cooling water supply and return

    • FGD Commissioning Eng
      • Jan 2008 - Dec 2008

      09/01/08-31/12/08  IWSP project 9 boiler 5 Turbines 3 FGD unit, Oil fire power plant and FGD system, Construction and Commissioning,  Technical advisor for lime stone preparation system, Dewatering system, Absorber slurry, Recycle spray Blank, Mist eliminator, Bleeding gypsum, Plant Operation, Technical advisor for lime stone Advisor for Operation and maintenances (O&M) Review of EPC Contractors site documentation includes commissioning procedures, Supervision of commissioning activities, site inspections and meetings with the EPC Contractor. Disciplines in the complete installation of mechanical equipment and assist with checkout, Commissioning and startup for FGD system.

    • Technical Advisor Service (TA –FGD)
      • Jan 2006 - Dec 2007

       Coal fire power plant, FGD engineering system Construction and Commissioning, Technical advisor for lime stone preparation system, Dewatering system, Absorber slurry recycle spray blank, Mist eliminator, bleeding, Gypsum, Plant operation, Qinzhou Nanning / China. 2x600 Mw Wisco Wuhun / China. 1x200 Mw Heze Jinan / China. 2x300Mw XiangFan Wuhan / China. 2x600Mw Shimen Changsha / China. 2x300Mw Gaojing Beijing / China. 2X300Mw  Coal fire power plant, FGD engineering system Construction and Commissioning, Technical advisor for lime stone preparation system, Dewatering system, Absorber slurry recycle spray blank, Mist eliminator, bleeding, Gypsum, Plant operation, Qinzhou Nanning / China. 2x600 Mw Wisco Wuhun / China. 1x200 Mw Heze Jinan / China. 2x300Mw XiangFan Wuhan / China. 2x600Mw Shimen Changsha / China. 2x300Mw Gaojing Beijing / China. 2X300Mw

    • Mechanical Startup/Commissioning
      • May 2005 - Nov 2005

      Coal file power plant 2 X 660 MW Completed with precipitations and Flue Gas Desulphurization Unit Indonesia PT Central Java Power Tanjun Jati “B” Coal Handling system, including ship un-loaders, stackers, re-claimers, crushers, vibrating screens, Silo filling trippers, static & rotating equipment and several kilometers of coal conveyors. Mechanical and construction work for competition mechanical commissioning and operation test run belt conveyer. Responsible for Coal Handling unit backup for remaining construction or construction modify, punch work. Control contractor Verification of construction completion as well as coordination, scheduling and execution of the commissioning program. Supervisor for contractor, Supervision follow up target commissioning schedule and mechanical commissioning for coal handling. Prepare daily reports of all site assigned activities. Skills Direct hands-on experience with all field craft labor and jurisdictional assignments

    • Commissioning start up Mechanical Engineer
      • Jan 2001 - Mar 2003

      Roles & Responsibilities:Vietnam Electric Vietnam Coal fire Thermal Power Plant. Pha-Lai No.2 2x 300MW. TurbineBuilding and Fuel Gas Desulphurization system Turbine (300 MW) Mechanical works /Commissioning start up Responsible in mechanical commissioning for utility system (Auxiliary cooling, Auxiliary steam,Instrument Air, Chilled water, Service Air, Condensate, Vacuum system, Main Steam, Low pressure steam, Extraction steam systems). Work activity including testing, Flushing. Cleaning, Steam blowing, and rotating equipment turning, Oil systems circulated flushing, Grease filling and Initial test run for operation service in turbineFGD area Mechanical commissioning completed work system. in Lime stone system, Preparation system, Grinding system, Mist eliminator, Absorber, Dewatering system Belt Filter, Filtrated water and Gypsum system, Mechanical working in rotating equipment, Oil Lubrication, Grease filling, Rotation equipment checking, Vibration check. Initial test run and operation plant service in, Operation test running. * Assist in the development of systems commissioning guidelines, operating instructions,* Assist in reviewing engineering drawings, specifications and procurement requirements to ensure adequate provisions have been made for testing, flushing, cleaning and other pre-commissioning* Maintain commissioning and start-up records.* Utilize the safety tagging and lockout procedure/process.* Assist in the planning, scheduling and performance of equipment maintenance during the commissioning and start-up* Supervises assigned construction craft labor.* Work closely with Client on-site personnel and supplier service representatives engaged in pre- commissioning and troubleshooting activities.* Conduct systems walk downs and generate punch lists.

Education

  • University of Thailand
    Welding, Welding
    -
  • College
    Engineer's degree, Welding Engineering Technology/Technician
    1995 - 1997

Community

You need to have a working account to view this content. Click here to join now