Sam Jarman
Project Manager at Alun Griffiths (Contractors) Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
SMSTS
CITBJul, 2017- Nov, 2024
Experience
-
Alun Griffiths (Contractors) Ltd
-
United Kingdom
-
Civil Engineering
-
300 - 400 Employee
-
Project Manager
-
Mar 2023 - Present
-
-
Site Agent
-
Apr 2021 - Mar 2023
-
-
-
Buckingham Group Contracting Ltd
-
Worcestershire Parkway
-
Sub Agent
-
Jan 2018 - Apr 2021
Construction of new build train station Managing delivery of construction of external works including; - Full construction of highway interface including new roundabout - Car park construction; permeable paving system, blacktop and services installation - Forecourt area construction; installation of various tanks, service installation and construction up to block paving including street furniture. - CFA & SFA piling for station building construction and pile cap, ground beam and slab construction. - Permanent sheet pile earth retention installation Managing delivery and construction of internal fit out and fitting: - Final room finishes - Installation of internal M&E & SISS - Final floor finishes including terrazzo tile, GRP overlay, vinyl and carpet - Internal and external doors - Ticket counters - Flashings Deputy TWC AWS Safety Coach AP (Red Card) Show less
-
-
-
Costain Group PLC
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Senior Engineer
-
May 2017 - Jan 2018
• Subcontractor management and oversight. • RAMS (Risk Assessment Method Statement) review. • ITP (Inspection & Test Plan)/checksheet review. • Control of interface management with other disciplines and work parties on site including involvement with creation of start of shift briefs. • Undertaking of SHE and Quality inspections including engineering QA on civils works. • Conduct design reviews. • Assist in management of lifting operations and temporary works. • Programming of civil works (typically short term detailed lookahead programmes ranging from 2 – 14 weeks). • Assist planning team as necessary with updates/monitoring information. Show less
-
-
-
ABC ELECTRIFICATION LTD
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Planner
-
Jan 2016 - May 2017
• Develop and maintain short term and long term plans using Primavera P6 and Excel. • Report on achieved delivery to plan. • Chair regular meetings to integrate engineering works with achievable delivery. • Work alongside network rail planners and project managers to develop temple meads station OLE construction master control sheet. • Development of long term ‘Grip 6’ Primavera P6 plan for the construction and pre-works for temple meads. • Estimation of long term production to assist with contract pricing. • Assist network rail in the development of scope to allow for long term delivery plan. Show less
-
-
-
EnerMech
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Project Engineer
-
Jul 2013 - Dec 2015
• Production of projects and the control of associated mechanical/structural drawings and documents. • Analysing historical and current maintenance data and revaluating old design to current specifications. • Preparation of detailed reports (FEED submissions, work packs) and mechanical maintenance procedures. • Participate in the design, specification and installation of new build equipment. • Take customer work scopes and propose practical working solutions, with estimates of costs and time scales. • Adhering to company and client document control standards, ensuring consistent checking/approval of documents, drawings and data. • Project reporting and liaison with the client. • Approval of installation and test procedures. Checking delivery of finished product and related equipment. • Assist other department in the completion of projects as required. • Undertake customer and vendor visits in support of specific projects or business development as and when required. Some International travel is expected along with offshore visits. Show less
-
-
-
ALE
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
300 - 400 Employee
-
Student Engineer
-
Jul 2011 - Aug 2012
• Responsibility for engineering solutions to clients’ heavy transport and installation requirements both on site and in the Middlesbrough engineering office • Production of Risk Assessments and Method Statements (RAMS), inc. calculations and CAD drawings. • Allocating of resources using the GMS (Citrix based) Management System • Liaising with the Operations Department staff in order to hand over equipment lists, plant requirements, labour requirements and RAMS in advance of project commencement • Attending site to measure and record specific information, including routing, and ensuring that all relevant information is incorporated into RAMS. • Attending site for the execution of the project often as the main point of contact with the client on site, including project programme, engineering issues and HSQE. Also providing technical support to the ALE site supervisor (if present), such as marking out the site for positioning of ALE equipment. • Projects included: Loadout and Weighing of Centrica York Development Project, Weighing of the Thistle Project, Loadout, Weighing and Install for the construction of the HMS Queen Elisabeth Show less
-
-
-
Clarkebond
-
United Kingdom
-
Engineering Services
-
1 - 100 Employee
-
Student Engineer
-
Jun 2010 - Sep 2010
Involved in the design and drafting of small civil and structural engineering projects. Involved in the design and drafting of small civil and structural engineering projects.
-
-
-
-
Sales Person
-
Jun 2009 - Sep 2009
-
-
Education
-
Swansea University
Bachelor of Engineering (BEng), Civil Engineering -
Downfield Sixth Form
A Levels -
Cirencester Deer Park