Sam Hood
Supervisor at Coleman Rail- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Coleman Rail
-
Australia
-
Construction
-
200 - 300 Employee
-
Supervisor
-
Dec 2016 - Present
Coleman Rail is a Rail Infrastructure Construction Company, originating from Melbourne, Victoria & owned by Accoina Geotech Holdings. The Parkes Inter-modal Hub is a preliminary, but vital component to the completion of the first stages of the In-Land Rail Project. The Randwick Stabling Yard Depot and the Lilyfield Maintenance Depot are milestone features on the Sydney Light Rail Project ($2.1Billion) and a flagship endeavour for Coleman Rail.Supervisor responsible for top down construction (Pandrol CDM) a Light Rail network within the constraints of a compact & busy site. Coordinating Track construction in conjunction with Building works & in ground Utility installation.Role Responsibilities - Safe Construction Sequencing / Planning / Execution. - Program / Schedule.- Assessing Design Drawings / Specifications.- Quality Assurance / Control (RMS).- Non-Conformance Report Management / Close-out (NCR).- Subcontractor Management.- Procurement. Exposure- In-ground Utilities.- Concrete (Insitu) – Lean Mix & Structural Concrete works.- End to end Light Rail Installation.Installation Works.2019 - Supervisor - Pacific National Inter-modal Hub, Parkes, NSW 2018 - Supervisor - Lilyfield Light Rail Maintenance Depot, Sydney, NSW2017 - Supervisor - Randwick Light Rail Stabling Yard, Sydney, NSW
-
-
Supervisor / Leading Hand
-
Mar 2010 - Nov 2016
Coleman Rail is a Rail Infrastructure Construction Company, originating from Melbourne, Victoria & owned by Accoina Geotech Holdings. Coleman Rail are a preferred Rail Installation Contractor for Yarra Trams, preforming various possession / shut-down & Major Infrastructure Up-Grades.My primary roles included fabrication of special works through Yarra Trams & the installation of this infrastructure through Coleman Rail on the Yarra Tram Network. This gave me exposure to all aspects of Track Construction from concept to completion. Installation Works2016 – Supervisor – Central Station Light Rail Platform Upgrade, Sydney, NSW.2016 – Leading Hand – Southland Station Construction, Melbourne, Vic. 2015 – Fabricator – Preston Work Shops Large Maintenance Depot (59 Trams), Melbourne, Vic.2015 – Leading Hand / Labourer – Regional Rail Link Heavy Rail Freight Line, Melbourne, Vic.2014 – Leading Hand – Victoria Parade / Nicholson Street Intersection, Melbourne, Vic.2013 – Leading Hand – Domain Interchange Saint Kilda, Melbourne, Vic.2012 – Labourer – Route 109 Up-Grade, Port Melbourne, Vic
-
-
-
Yarra Trams
-
Australia
-
Rail Transportation
-
700 & Above Employee
-
Lead Fabricator / Installation Supervisor
-
Sep 2010 - Jun 2016
Yarra Trams is the largest Light Rail Network in the world, consisting of over 250km of double track, 700 tram stops, 450 Trams & 9 Depots. 75% of the network operates on shared roads with other vehicles & ferries over 200 million passenger per year. As such, they have a very demanding maintenance schedule, conducted in a fashion to limit disturbance.Seconded from Coleman Rail to Yarra Trams, my primary role was to carry out final design checks on special works & then lead fabrication. Special works included turn-outs, cross-overs, scissor cross-overs, intersections including H-crossings & double switches. From 2010 to 2015, I was involved with all special works associated with the Yarra Trams Network.Installation Works2016 – Supervisor – Curve Intersection – Burwood Road / Power Street, Melbourne, Vic.Fabrication Works2016 – Lead Fabricator – Camberwell Junction Track Maintenance, Melbourne, Vic.2015 – Lead Fabricator – Preston Work Shops Large Maintenance Depot (59 Trams), Melbourne, Vic.2014 – Leading Hand – Victoria Parade / Nicholson Street Intersection, Melbourne, Vic.2013 – Fabricator – Domain Interchange Saint Kilda, Melbourne, Vic.2012 – Labour Support – Route 109 Up-Grade, Port Melbourne, Vic.
-
-