Sam Chaud

Associate Principal at EIC Activities
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Melbourne Area, AU
Languages
  • French Native or bilingual proficiency
  • English Full professional proficiency
  • Spanish Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Daniel Tofful

I worked closely with Sam for approximately two years during the detailed design and construction phases of the Caulfield to Dandenong Level Crossing Removal Project. The project was technically challenging, built within an extremely constrained brownfields environment and involved many industry firsts including full span erection with a specialised straddle carrier and launching beam system. All aspects of the permanent works design were tailored to suit mass scale precast production and the unique construction methodology. As VSL's technical manager, Sam ensured all the complexities of construction and temporary works were coordinated and incorporated into the relevant design packages - a large undertaking. The project had a very aggressive programme and this placed tremendous pressure on project team. Along the way there were several challenges however these were resolved quickly due to the strong collaboration between the design and construction teams fostered by Sam. He was proactive, foresaw potential issues and focused on getting the best for project outcome. Working closely with Sam, I also learnt a lot about the intricacies of specialised temporary works systems and precast segmental construction. This was invaluable and I appreciate Sam's openness to share his knowledge and experience. It was a pleasure working with Sam. The Area 1 Team would not have achieved what we did without his persistence and dedication to the project. I hope to work with Sam in the future.

LinkedIn User

Both Sam and myself worked in the cut and cover team for Westgate Tunnel Project. We were responsible for the permanent work design packages for the two Cut and Cover structures located to the west of Westgate Bridge. I was the package lead for the structures and Sam was the lead designer of one of the tunnel initially and then took over the package lead role when i left the project. He led the team, that comprised of engineers and technicians, and delivered to the 100% design stage. He was very focused on delivery and ensured that the quality of the design packages met the project requirements. These two big design packages contained a combined structural detailed design drawings in excess of 700 drawings. To be able to deliver these big packages, while providing directions to the team was a massive achievement. Despite Sam had the pressure on delivering the package in a timely manner, he was very cautious and took necessary steps to ensure the design decision he made was the right one. He was proactive and didn't hesitate to ask the right questions. I was happy to have worked with Sam and looking forward to be in the same team again in the future.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • MIEAust CPEng NER Structural & Civil Engineering
    Engineers Australia
    Nov, 2019
    - Nov, 2024
  • National Engineering Register
    Engineers Australia
    Dec, 2019
    - Nov, 2024

Experience

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Associate Principal
      • Dec 2022 - Present

    • Construction Consultant
      • Feb 2018 - Present

    • Technical Support Engineer
      • Nov 2020 - Mar 2022

      Technical support for Vierendeel Truss precasting operations and design for CBGUJV on the Cross River Rail Project

    • Temporary Works Engineer
      • Sep 2019 - Sep 2020

      Secondment to Klabella Solutions to provide technical assistance to the West Gate Tunnel Project Temporary Works Coordination team (Z400) & Precast Yard facility in Benalla.

    • Technical Consultant
      • May 2018 - Oct 2018

      Part time secondment to Klabella Solutions to provide technical assistance to Wind Tower Technologies (WTT) for the setup of a precast yard facility producing vertically match-cast reinforced concrete segments.

    • Technical Manager
      • Feb 2018 - Apr 2018

      Part time technical assistance to the Level Crossing Removal Project - Caulfield to Dandenong (LCRP-CTD) up to the completion of the Area 1 Superstructure erection.

    • United States
    • Civil Engineering
    • 100 - 200 Employee
    • Lead Associate Structural Engineer
      • May 2022 - Nov 2022

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Experienced Structural Engineer
      • Feb 2018 - Jun 2019

      West Gate Tunnel Project - South Portal Inbound Cut and Cover Structure - Design of piles foundations, composite deck girders, walls and slabs for the cut and cover. - Coordination work to assist the package lead. West Gate Tunnel Project - South Portal Inbound Cut and Cover Structure - Design of piles foundations, composite deck girders, walls and slabs for the cut and cover. - Coordination work to assist the package lead.

    • Switzerland
    • Construction
    • 700 & Above Employee
    • Technical Manager
      • Jul 2016 - Feb 2018

      Level Crossing Removal Project - Caulfield to Dandenong - Area 1 Superstructure- 6.2km of box girder viaduct to elevate train tracks using a Straddle carrier to achieve a span by span installation.- Technical interface between the project and the designers of the Straddle Carrier & Launching Beam used to erect the 430t precast Spans onto the piers.- Review, Approval & sign off of the span erection sequence drawings (~8 technical drawings per span x 174 spans). These drawings also cover the interface with the live railway corridor at close proximity.- Creations of temporary work packages (70+ including ~30 major ones) from the concept definition, design award to external consultants, follow up of the design and its integration in the project’s environment until installation and commissioning.- Overseeing a team of 5 to 8 Method Engineers, draft persons & document controller + 2 part-time designers. - Interface with the permanent work design lead.- Interface with the clients’ Engineering review team.- Set up and follow up of the document control process for the Sub-Alliance.

    • Method Engineer
      • Aug 2015 - Jun 2016

      Methods assistance to tender special projects, mainly in the Middle East and America.- Modular Form Travelers system- Wind Farms Erection- Cranes and Overhead / Underslung precast box girder erection

    • Switzerland
    • Construction
    • 700 & Above Employee
    • Senior Design Engineer at VSL-TCAA
      • Jan 2015 - Jun 2015

      Temporary work designer for a Launching Gantry on the Hong Kong - Zhuhai - Macau bridge- Design checks for an existing self-launching Gantry made of two twin Trusses (165m long x 6m high) & its equipment. - Design of new components for the Gantry from concept to fabrication drawings.- The Gantry successfully erected the segments in the airport channel of the HZMB Project.

    • Design Engineer
      • Jan 2013 - Dec 2014

      - Temporary work designer for a Launching Gantry on the Hong Kong - Zhuhai - Macau bridge

    • Switzerland
    • Construction
    • 700 & Above Employee
    • Project Engineer
      • Sep 2010 - Nov 2012

      Hunter Expressway Eastern section (Newcastle - NSW) - Construction of 3 Viaducts: - Production of 177 precast column segments - Erection by crane and post-tensioning of these segments onto 16 viaduct piers (14 to 30 m high). Nov 2010 - Feb 2011: M80 Upgrade Project (Melbourne) – Tulla Sydney Alliance - VSL Subcontracted to precast piers and headstocks.- Setting up the precast production for the precast piers & headstocks fabrication for Bridges 221 & 301 on the M80 Upgrade project - Melbourne - VIC

    • Site Engineer
      • Apr 2007 - Sep 2010

      New Gateway Bridge (Brisbane - QLD)- 260m in situ Balanced Cantilever Main Span above the river (including form traveller launching checks, prefabrication of web reinforcement, pre-pour inspections, post-tensioning operations).- Approach span pierheads constructionTender for South Road Superway Tender (Adelaide - SA)Preparation works for Gorgon Project (from Perth - WA)

    • Site Engineer
      • Jan 2005 - Sep 2006

      - Highbrook Interchange Bridge - East Tamaki Connection Project on SH1N- Auckland - NZ - Water treatment plant & two roundabout bridges in Tauranga - NZ - Highbrook Interchange Bridge - East Tamaki Connection Project on SH1N- Auckland - NZ - Water treatment plant & two roundabout bridges in Tauranga - NZ

Education

  • Université Paul Sabatier (Toulouse III)
    Master's degree, Civil Engineering
    2004 - 2005
  • Université Joseph Fourier (Grenoble I)
    Bachelor's degree, Civil Engineering
    2002 - 2004

Community

You need to have a working account to view this content. Click here to join now