Sajid Khan
Refrigeration Department at Ahmad Abed Factory for Food Powder & Yeast - BakeMate- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Ahmad Abed Factory for Food Powder & Yeast - BakeMate
-
Saudi Arabia
-
Food and Beverage Manufacturing
-
1 - 100 Employee
-
Refrigeration Department
-
Feb 2021 - Present
Refrigeration & Airconditioning MRO(Maintenance Repairs & Operation) Department(Ammonia Refrigeration Plant Sabroe, Mycom),Bitzer DX system, Copeland System, Dry and Cool chiller(MTA, Weisshhar) Refrigeration & Airconditioning MRO(Maintenance Repairs & Operation) Department(Ammonia Refrigeration Plant Sabroe, Mycom),Bitzer DX system, Copeland System, Dry and Cool chiller(MTA, Weisshhar)
-
-
-
Gulf Experts
-
Qatar
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
HVAC&R Supervisor (Qatar Rail Green line Stabling Yard, Ministry of Education, Hotel and Mall)
-
Nov 2018 - Jan 2020
Worked in Various site at Qatar Rail Green line Stabling Yard for Operation , PHCC for inspection, Ministry of Education- Inspection and O&M, Hotel for Troubleshooting, Hypermarket and Mall for trouble shooting with different brand chiller like YORK, Carrier, TRANE, McQuay, SKM, Petra Centrifugal Chiller at Airport ATCC and Naufar Hospital Ghadheer Dairy- Freezer and Cold room Worked in Various site at Qatar Rail Green line Stabling Yard for Operation , PHCC for inspection, Ministry of Education- Inspection and O&M, Hotel for Troubleshooting, Hypermarket and Mall for trouble shooting with different brand chiller like YORK, Carrier, TRANE, McQuay, SKM, Petra Centrifugal Chiller at Airport ATCC and Naufar Hospital Ghadheer Dairy- Freezer and Cold room
-
-
-
Facilities Management & Maintenance Company, LLC
-
Qatar
-
Facilities Services
-
400 - 500 Employee
-
HVAC & Refrigeration Supervisor(Hamad International Airport)
-
Mar 2013 - Jul 2018
Job profile: Centralize Refrigeration plant 3460kW capacity with secondary loop food graded brine and Primary loop R-404A, AHU Heat recovery system,CRAC (Computer room air-conditioning) system,Dishing and Tray setting conveyor with cooling,Automatic sliding door, Retrieving door PLC, Wet ice machine 24000 Kg/day expertise in control wiring with PLC. Job profile: Centralize Refrigeration plant 3460kW capacity with secondary loop food graded brine and Primary loop R-404A, AHU Heat recovery system,CRAC (Computer room air-conditioning) system,Dishing and Tray setting conveyor with cooling,Automatic sliding door, Retrieving door PLC, Wet ice machine 24000 Kg/day expertise in control wiring with PLC.
-
-
-
Bahwan Engineering Co LLC
-
Oman
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
HVAC Foreman
-
Apr 2008 - Dec 2012
Worked Palace, Oman Refineries and Petrochemical, Vale Steel Plant,Jetty, King Palace (RCA Royal Court Affairs) Sohar aluminium in Facalities Services. Chiller- Carrier, McQuay Worked Palace, Oman Refineries and Petrochemical, Vale Steel Plant,Jetty, King Palace (RCA Royal Court Affairs) Sohar aluminium in Facalities Services. Chiller- Carrier, McQuay
-
-
Education
-
HRD Govt. of India and DOEACC Chandiagarh Govt. of IT
Diploma in Computer Applications and Multilingual DTP, IT Applications, Business system, MS office, Visual Basic Programming, Photo Shop, DTP -
Imarat-e-Shariah Educational & Welfare Trust Patna
Mechanical Refrigeration and Air conditioning -
Standard Technical Training Centre,Mumbai
HVAC Drafting & Designing