Safina So
Architect at Wong Tung & Partners Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Cantonese Native or bilingual proficiency
-
English Full professional proficiency
-
Mandarin Full professional proficiency
Topline Score
Bio
Credentials
-
BEAM Professional
Hong Kong Green Building Council (HKGBC)Nov, 2020- Nov, 2024 -
Registered Architect
Architects Registration Board HKSARJul, 2019- Nov, 2024 -
Member
The Hong Kong Institute of ArchitectsJun, 2019- Nov, 2024
Experience
-
-
Architect
-
May 2020 - Present
PROJECTS:Subsidized Sale Flats Development at Anderson Road Quarry Site R2-3Commercial and Residential Development at Rua da Fabrica, Macau
-
-
-
-
Project Researcher & Writer
-
Apr 2019 - May 2020
Research on Kowloon East Inclusive Innovation & Growth• Involved in researching, data analysis, writing, booklet layout and editing, compilation of findings, coordination with project leader, editor, fieldwork team and graphics team to produce a research booklet
-
-
-
-
Architect
-
Apr 2019 - Dec 2019
-
-
Architectural Assistant
-
May 2018 - Mar 2019
-
-
-
-
Architectural Designer
-
Jun 2017 - May 2018
PROJECTS:Commercial and Residential Development at Nos. 13 and 15 Sze Shan Street, Hong Kong (3800sqm//built)• Involved in statutory submissions, productions of tender drawings and documents, tender interviews, tender analyses and tender award for Main Contract and other sub-contracts, regular design & site coordination with consultants and contractors, preparation of deed poll plans and DMC plans for pre-sale, contract administration of Foundation & Main Contract
-
-
-
-
Part-Time Freelance Designer
-
Sep 2015 - Aug 2017
PROJECTS:Shop Design for a new AESOP store in Lane Crawford Times Square, Hong Kong (28sqm//built)• Involved in concept design; produced digital models, renderings, presentation drawings and construction drawingsInterior Design for a new school chapel in Ho Man Tin, Hong Kong (90sqm//built)• Involved in concept design; produced digital models and renderingsEditorial Committee for a publication booklet for HKIA YMC at UIA 2017 Seoul World Architects… PROJECTS:Shop Design for a new AESOP store in Lane Crawford Times Square, Hong Kong (28sqm//built)• Involved in concept design; produced digital models, renderings, presentation drawings and construction drawingsInterior Design for a new school chapel in Ho Man Tin, Hong Kong (90sqm//built)• Involved in concept design; produced digital models and renderingsEditorial Committee for a publication booklet for HKIA YMC at UIA 2017 Seoul World Architects Congress• Involved in page & graphics layout, compilation of booklet, graphic design, write-ups, proof-reading Show more Show less
-
-
-
-
Architectural Assistant (Year-Out)
-
Jul 2014 - Jun 2015
PROJECTS:Redevelopment of Chinese Rhenish Church, Kowloon Tong, Hong Kong (1400sqm//built)• Involved in contract administration and design coordination in construction stage; attended regular site meetings of Main Contract Works• Engaged in Interior Fitting-Out Consultancy Services through the stages of inception, feasibility studies, schematic and detailed design development; produced digital models, renderings, presentation drawings and tender drawings; attended regular… PROJECTS:Redevelopment of Chinese Rhenish Church, Kowloon Tong, Hong Kong (1400sqm//built)• Involved in contract administration and design coordination in construction stage; attended regular site meetings of Main Contract Works• Engaged in Interior Fitting-Out Consultancy Services through the stages of inception, feasibility studies, schematic and detailed design development; produced digital models, renderings, presentation drawings and tender drawings; attended regular design coordination meetings with consultants and clientChoi Hing Court - HOS Development at Choi Hing Road, Ngau Tau Kok, Hong Kong (12000sqm//built)• Involved in DDRP preparation, detail design, production of presentation drawings and construction drawings, ICU submissionsThe Central Market Revitalization Project, Hong Kong (4200sqm//ongoing)• Involved in detail design, design coordination, statutory submissions Show more Show less
-
-
-
-
Architectural Intern (Summer Trainee)
-
May 2013 - Aug 2013
PROJECTS:Development of a Recreational Space under Ferry Street Flyover, Hong Kong (500sqm//unbuilt)• Involved in feasibility study; produced digital models and presentation drawings; attended design coordination meetings
-
-
Education
-
The University of Hong Kong
-
The University of Hong Kong
-
Po Leung Kuk Vicwood K.T. Chong Sixth Form College
-
The True Light Middle School of Hong Kong