Safat Chowdhury

Project Manager, Switchgear Division at Monarch Electric Co.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
New York, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

Its rare that you come across a stand out talent like Safat. Safat and I worked together on several projects at Entech Engineering and I was lucky to call him my coworker. He consistently gave 100 percent effort to the team and played a significant role in ensuring that we completed assignments on time. What is particularly impressive about Safat is his project management skills and ensuring that the client is always happy with the deliverables assigned to him. He is a subject matter expert and a creative problem solver who is always ready to accept challenges and excels at the assigned projects. Any team would be lucky to have Safat and I couldn’t recommend him more for any business looking for new talent

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Wholesale
    • 1 - 100 Employee
    • Project Manager, Switchgear Division
      • Mar 2022 - Present
    • China
    • Environmental Services
    • Assistant Project Manager
      • Aug 2021 - Mar 2022

      • As Assistant Project Manager, I managed EnTech’s portion of several municipal contracts on a day-to-day basis, tracked the projects budget, was in continuous communication with the client and internal EnTech disciplines, participated in a monthly meeting with NYCDEP stakeholders, tracked and monitored the project budget, delegated tasks, performed QA/QC to ensure high quality of deliverables, approved staff • In addition to management, I also worked on technical deliverables such as the Environmental Health and Safety Plan, Permit Identification Checklists, Sustainability Management Plan, Security Recommendations Memo, EH&S Checklist and Risk Assessment to name a few • As an Assistant Project Manager, I scoped future proposals, tracked current NYCDEP projects company wide, prepared project sheets for marketing and bids, staff rate increases for employees, prepared and submitted monthly invoices • Established a SharePoint document control system for all water/wastewater treatment projects that EnTech is partaking to track and maintain all deliverables/transmittals/documents Show less

    • Project Engineer
      • Sep 2018 - Jul 2021

      • Prior to becoming an Assistant Project Manager, Safat worked as a Project Engineer for various municipal projects.• CI-IAA-1 (NYCDEP): Conducted manhole inspections and prepared daily reports as a part of an infiltration analysis for manholes in the Southeastern portion of Queens County. • PS-DES-5 (NYCDEP): Performed 3D laser scanning at 3 pump stations in Brooklyn, registered and uploaded scans and assisted with the development of the 3D model of existing conditions during the Facility Planning Phase. • NR-STRUCT-DES (NYCDEP): Performed structural inspections of the facility, 3D laser scanning, registered and uploaded scans, wrote confined space entry technical plan/rescue plan, and did safety inspections during the facility planning phase at North River Water Resource Recovery Facility. • GI-OH15 (NYCDDC/NYCDEP): Performed geotechnical oversight for green infrastructure exploration in the Gravesend Portion of Brooklyn, NY. Coordinated with geotechnical subcontractors performing soil sampling as well as permeability tests (PT). Wrote daily reports, composed PT logs and soil boring logs to be incorporated into a Geotechnical investigations report. • WI-292-DES & TI-169-DES (NYCDEP): Performed electrical inspections throughout the 30%, 60% and 90% design phase at Wards Island Water Resource Recovery Facility. • 1429-ENGSVC-E (NYCDEP): Worked on the conceptual design plan for the Rockaway Water Resource Recovery Facility, compiled list of permits needed, performed property evaluations, reviewed as-builts, calculated quantities of materials currently present and to be demoed/removed, solicited quotations for vendors for potential services. Show less

    • United States
    • Environmental Services
    • 1 - 100 Employee
    • Project Engineer
      • Jun 2017 - Aug 2017

      • Served as Project Engineer for the Hunts Point WRRF Replacement of 16 Centrifuges project • Spectraserv was the Contractor, ARCADIS was the CM, NYPA/NYCDEP served as the owner • Scope involved the replacement of 16 centrifuges along with the replacement of pipes, motors, pumps • Oversaw day to day functions of the construction site, gave daily job briefing, performed field visits • Reviewed design drawings, issued Purchase Orders, received/tracked deliveries, provided submittals • Coordinated with superintendent, foreman and subcontractors, safety engineer, CM and owners • Composed RFI’s, solicited proposals from subcontractors, wrote daily reports Show less

    • United States
    • Utilities
    • 700 & Above Employee
    • Engineering Aide
      • Jan 2016 - May 2017

      • Worked as an Engineering Assistant in System & Transmission Operations (S&TO) of Con Edison • Developed the formal reporting format for remediation of underground leaks on transmission feeders • Wrote technical reports describing Con Edison’s remediation efforts for each leak detected • Utilized inhouse GIS to efficiently plan remediation of leaks based on location of leaks instead of remediation as they occurred, effectively reducing unnecessary use of resources • Tracked, updated, and decreased backlog of spills that needed remediation efforts Show less

    • United States
    • Environmental Services
    • 700 & Above Employee
    • Permit Resources Intern
      • Jun 2015 - Dec 2015

      • Assisted with the migration of files from internal SharePoint to eBuilder • Reviewed and provided comments on permit compliance plans from consultants • Composed portions of the Environmental Assessment Statement (EAS) for PS-RI-N & PS-RI-S • Began/delegated permit processes on eBuilder and assigned stakeholders for various inhouse projects • Assisted with the migration of files from internal SharePoint to eBuilder • Reviewed and provided comments on permit compliance plans from consultants • Composed portions of the Environmental Assessment Statement (EAS) for PS-RI-N & PS-RI-S • Began/delegated permit processes on eBuilder and assigned stakeholders for various inhouse projects

    • In House Design Intern
      • Jun 2014 - Aug 2014

      • Reviewed, provided feedback, and made changes to specifications • Assisted with the development of various pipes on AutoCAD for Terminal 4 at JFK Airport • Wrote technical reports based off calculations and findings for Lead Design Engineer • Reviewed, provided feedback, and made changes to specifications • Assisted with the development of various pipes on AutoCAD for Terminal 4 at JFK Airport • Wrote technical reports based off calculations and findings for Lead Design Engineer

Education

  • LSU Shreveport
    Master of Business Administration - MBA
    2019 - 2021
  • The City College of New York
    Bachelor of Engineering - BE, Environmental Engineering
    2012 - 2017
  • Brooklyn Technical High School
    High School Diploma, Civil Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now