Saeed Ullah

DGM | Head of Mechanical Maintenance & Reliability at Chiniot Power Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Utilities
    • 1 - 100 Employee
    • DGM | Head of Mechanical Maintenance & Reliability
      • Sep 2014 - Present

      Working as Manager Mechanical at 62.4MW Chiniot Power Limited Co-generation power plant. The plant has 2x31.2MW HTC Steam turbines and 2x155 TPH,110 bar Wuxi Boilers.I have been involved with the project since start of erection activities and currently heading the mechanical maintenance activities Working as Manager Mechanical at 62.4MW Chiniot Power Limited Co-generation power plant. The plant has 2x31.2MW HTC Steam turbines and 2x155 TPH,110 bar Wuxi Boilers.I have been involved with the project since start of erection activities and currently heading the mechanical maintenance activities

    • Chemical Manufacturing
    • 100 - 200 Employee
    • Incharge Mechanical Equipments
      • Aug 2009 - Aug 2014

      400 MW CCPP UCH-II Expansion Project .  Installation, commissioning and start up of 2x 9E GE Gas Turbines.  Installation and commissioning of HRSG DKME made.  Installation, commissioning and start up of Fuji Steam Turbine.  Installation and commissioning of BOP.  Installation of APU of Gas Turbines.  Installation and commissioning of Fuel Gas system of Gas Turbines.  Installation and commissioning of Fuel oil system of Gas Turbines.  Errection of Piping of Gas Turbines.  Installation & commissioning of Surface condenser of Steam Turbine.  Commissioning of steam by pass system.  Installation and commissioning of Control oil system of Steam Turbine.  Pre-commissioning and commissioning of Cooling water system including cooling  water pumps, auxillary cooling water pumps and closed cooling water system.  Pre-commissioning and commissioning of fire water system.  Pre-commissioning and commissioning of Gas conditioning system.  Pre-commissioning and commissioning of HSDO system.  Pre-commissioning and commissioning of raw water pre-treatment system.  Pre-commissioning and commissioning of chemical dosing system.  Pre-commissioning and commissioning of Plant and Instrument air system.  Commissioning of Heat exchangers.  Pre-commissioning and commissioning of waste water system.  Operations and maintenance of combined cycle power plants.  DCS operations.  Maintenance of Butterfly valves, NRVs, pumps.  Maintenance of spark plugs and flow divider of gas turbines. 225 MW Combined Cycle Power Plant Installation & commission of GE Gas Turbines 75 MW. Installation and commissioning of GE Steam Turbines 75 MW. Installation and commissioning of Heat Recovery Steam Generator. Fabrication & Errection of underground & Above ground Piping according to GE standard. Pre-commissioning & commissioning activities of Lube oil flushing, steam blowing. Installation and erection of Steel Structure . Installation & commissioning of power plant auxiliaries. Show less

    • Project Engineer
      • May 2008 - Aug 2009

      234 MW Combined Cycle Power Plant Saphire Power Muridke  Installation & commissioning of GE Gas Turbines 75 MW .  Installation & commissioning of SKODA Steam Turbine 84 MW  Installation of HRSG  Fabrication & errection of Piping.  Alignments of Gas Turbines , Steam Turbines & Pumps.  Installation & commissioning of lube oil system of Steam Turbine.  Installation & commissioning of Surface condenser of Steam turbine.  Installation & commissioning of jacking oil system of Steam Turbines.  Installation & commissioning of power plant auxiliaries  Installation & Commissioning of APU of Gas Turbines.  Installation & commissioning of Fuel oil system of Gas Turbines.  Fabrication & Errection of underground & above ground piping according to GE standard. 225 MW Combined cycle Power plant - Orient power Balloki Leading IPP in Pakistan .  Worked as a Mechanical Engineer.  Installation & commissioning of 2x 6FA+e GE Gas Turbines 75 MW.  Installation & commissioning of SKODA Steam Turbine 75 MW.  Errection of Piping.  Alignments of Turbines.  Lube oil Flushing.  Installation & Commissioning of APU of Gas Turbines.  Installation & commissioning of power plant auxiliaries  Installation & commissioning of jacking oil system of Steam Turbines.  Installation & commissioning of Surface condenser of Steam turbine.  Alignments of Gas Turbines , Steam Turbines & Pumps.  Installation & commissioning of Fuel oil system of Gas Turbines.  Fabrication & Errection of underground & above ground piping according to GE standard. Show less

  • NIPO
    • Karachi Pakistan
    • Trainee Engineer
      • May 2007 - Apr 2008

      Major over hauling of Automobiles . Repairing of Gearing system of Automobiles . Replacement of Crank shaft , connecting rod & valves Skills: Major over hauling of Automobiles . Repairing of Gearing system of Automobiles . Replacement of Crank shaft , connecting rod & valves Skills:

    • Pakistan
    • Machinery Manufacturing
    • 300 - 400 Employee
    • Trainee Engineer
      • May 2007 - Dec 2007

      Operation & Maintenence of CAT Gas Engines 1 MW each . Maintenece of Spark Plugs. Operation & Maintenence of CAT Gas Engines 1 MW each . Maintenece of Spark Plugs.

Education

  • Quaid-E-Awam university of Engineering science & Technology
    B.E, Mechanical
    2002 - 2006
  • InstituteQuaid-e-Awam University of Engineering
    Engineer's Degree, Mechanical Engineering
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now