Sadaqat Ali

Control Room Operator at RAWEC - Rabigh Arabian Water & Electricity Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • High voltage /Medium Voltage
    APEX UAE

Experience

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Control Room Operator
      • Apr 2014 - Present

      Rabigh Arabian Water & Electricity Company (RAWEC) is the special purpose company created to develop, own and operate the Rabigh IWSPP. The project is the utilities provider (power, water and steam) within the Rabigh Complex " PETRORABIGH", Rawec power plant is consist of 7*120mw Mitsubishi steam turbines ,13*470t/h capacity steam Boilers,Desalination plant Demineralization plant etc. My job responsibility start up and shut down complex,continuous plant monitoring and tackle emergency condition with safe manners. To check the log sheets readings of all critical parameters and take action as per requirement problem. To get Completed and maintain station records, chronological logs, General Logs, Technical Data and Equipments performance reports. To perform Switching of different voltage levels systems (High/medium/low voltage) 220 KV/13.58KV/4.6 KV/0.4 KV and DC/UPS/Battery Charging back up power supply system etc, through GIS(Gaseous insulated system). To get performed start-up/shut down, Trouble Shootings and all related operation including isolation/de-isolation/Equipment testings as per requirements. Reviews, implements and monitors the adherence to operations methods and Procedures. Show less

    • Pakistan
    • Oil and Gas
    • 300 - 400 Employee
    • Control Room Operator
      • Jun 2013 - Mar 2014

      The company provides services to Develop, Construct, Rehabilitate and perform Operations & Maintenance for projects in Energy Sector. The team is blend of highly experienced engineers and young, enthusiastic professionals in Electrical, Mechanical.I worked with this company on Hilla power project 250MW simple cycle plant Iraq.My responsibilities in this compny are as under To ensure safe start up, shut down and trouble shooting of plant. • To supervise, monitor and adjust parameters. • To maintain accurate logs, reports and invoices for appropriate decision making. - Safe & normal operation of Plant. - Continuous monitoring and logging of plant parameters. - Checking & up keep of safety equipment's - Safely start up and shutdown of plant in normal & emergency operation. - Emergency handling in very safe manners. - Reporting & Rectification of abnormal condition immediately. - Participation in safety meetings, emergency discussion and incident reporting system. Show less

    • Printing Services
    • 100 - 200 Employee
    • Plant Supervisor
      • Oct 2012 - May 2013

      worked in century power generation compny as Plant Supervisor and my key resposibilities are as under. Fully involves in the plant startup, plant normal power operation, power reduction and handling all types of transients in all phases of plant Start-up and shut-down of gas turbines and HRSG's from control room DCS. Maintaining shift Log, reading sheets of field operations. Operate complex under technical limits Heat recovery steam generator Air compressor,Fuel Gas Compressors, HSD,HFO&L.Oil Separators,BFW pumps,cooling towers,Deep well turbine pumps network, De-mineralized Water Treatment Plant (RO type) Regeneration of mix bed Chemical dosings; Cooling towers , CW, CCW , HRSG , WTP Show less

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • plant operator
      • Feb 2011 - Sep 2012

      Responsible for Operation and Maintenance of Following Equipments • 24*HFO&DO 18KU30A Mitsubishi engine each have capacity of 5.65MW. • Fuel treatment system. • Engines Auxiliary system. • Water Cooling & treatment system. • 2*Cummins Emergency diesel engine. CORE RESPONSIBILITIES: Startup and shut down of plant. , Startup of Balance of plant, Synchronization of Generator with the grid. , Maintaining Log sheet of Parameters. Observation of main equipments. Isolation and of an individual equipment and whole system. Coordination with other departments in maintenance jobs and process. Perform routine maintenance procedures and test., Perform PTW system. experience in industrial environment Show less

    • plant operator
      • May 2008 - Jan 2011

      Monitoring and supervision of system running according to standard parameters.system consists at Caterpillar 3616 Heavy Fuel Oil & Diesel engines (3.47*6) HFO Purifiers MFPX (307) Separation System With etc 400 Control Unit by Alfa laval. lube Oil Purifirs MMPX (304) Separation system by Alfa laval. One waste heat recovery ( Water Tube ) Boiler 2 Ton/Hr Capacity Monitoring and supervision of system running according to standard parameters.system consists at Caterpillar 3616 Heavy Fuel Oil & Diesel engines (3.47*6) HFO Purifiers MFPX (307) Separation System With etc 400 Control Unit by Alfa laval. lube Oil Purifirs MMPX (304) Separation system by Alfa laval. One waste heat recovery ( Water Tube ) Boiler 2 Ton/Hr Capacity

Education

  • Islamia University, Bahawalpur
    Bachelor's in Technology, Mechanical
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now