Sabtain Zafer Seyal

Planning Engineer at APEX EXPERTS CONTRACTING L.L.C
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE
Languages
  • English Full professional proficiency
  • Urdu Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

Sabtain was found to be hard working, always ready to take up challenging tasks that came along his way. He had a strong yearning to grow and made earnest efforts to learn new skills at any given opportunity. Will prove to be an asset to anyone who would hire him!!

AVINASH KURUBA (He/Him)

Sabtain is hardworking and a talented guy who can fit into any kind of project.His understanding skills according to the project type are outstanding.I would highly recommend sabtain for his future assignments.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Data Management and Planning Reporting Skills
    Planning Engineer Est.
    Jul, 2020
    - Oct, 2024
  • Professional Planning Engineer
    Planning Engineer Est.
    Jun, 2020
    - Oct, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Sep, 2018
    - Oct, 2024
  • Certified Engineer
    Pakistan Engineering Council (PEC)
    Dec, 2017
    - Oct, 2024
  • Oracle Primavera P6 Professional
    University of the Punjab
    Aug, 2016
    - Oct, 2024

Experience

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Planning Engineer
      • Sep 2020 - Present

      Dec-2022-till date Project Title: Ain Al Maha Bridges (4 Canal Bridges) Main Contractor: M/s. Gulf Contractor LLC Sub-Contractor: M/s. Apex Experts Contracting LLC Consultant : Parsons International Limited Mar-2022-till date Project Title: Jubail Island Interchange Works North Extension Main Contractor: M/s. Gulf Contractor LLC Sub-Contractor: M/s. Apex Experts Contracting LLC Consultant : Parsons International Limited The scope of work consist construction of bridge structure, culvert and ramp for jubail island bridge Extension. Aug-2021-Sept-2022 Project Title: Construction of Interchange to link East/West Baniyas _ Abu Dhabi Main Contractor: M/s. Agility Engineering & Contracting Co LLC Sub-Contractor: M/s. Apex Experts Contracting LLC Consultant : Parsons International Limited Client: Abu-Dhabi City Municipality The scope of the project includes the construction of the upper interchange linking East and West Bani Yas ,converting the current East Baniyas Roundabout into a traffic light intersection. Sept-2020-April-2022 Project Title: Jubail Island Interchange Works (Package 1B) Main Contractor: M/s. Gulf Contractor LLC Sub-Contractor: M/s. Apex Experts Contracting LLC Consultant : Parsons International Limited The scope of the project includes construction of a new highway interchange on Sheikh Khalifa Highway (E-12) Responsibilities: • Preparation of Baseline program including Resource/Cost Loading along with complete detail narratives and presentations. • Monitoring & updating the contract schedule using P6 and graphical format on daily & weekly basis to track the project milestones plan vs actual status • Based on project schedule, development of micro level planning for various construction activities, resource requirements and analysis of project constraints using project management technique and software. • Prepare and Submit Extension of Time Claims Analysis/ Report Writing.

    • United Arab Emirates
    • Construction
    • Planning Engineer
      • Dec 2018 - Aug 2020

      Project Title : ITS2020/1B- Intelligent Traffic Systems (ITS) for Dubai- iTraffic- Phase 1- Package 1B- Roadside Dynamic Information System. Main Contractor: China State Construction Engineering Corporation (Middle East LLC) Sub-Contractor : Scientechnic LLC Consultant : Parsons Overseas Limited Client: Road and Transport Authority – Dubai, UAE Responsibilities : • Assist to prepare baseline schedule for the project; monitoring the same program for the deliverable & milestones. • Updating the progress against performance measurement baseline, and disposing the reports to stakeholders as per defined communications management plan. • Preparation of contractual claims and impacted programmes for the purpose of Extension of Time • Preparation of critical path schedule, cash flow, resource histogram and s-curve. • Review of float and project progress vs baseline to identify area of concern and participant in the development of mitigation plan as needed. • Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member. •Developing project reporting system and integrating data from various wards to generate weekly/monthly status report and project status presentations to the consultant/ client and the corporate management • Based on project schedule, development of micro level planning for various construction activities, resource requirements and analysis of project constraints using project management technique and software. • Conducting various types of progress meetings, progress reviews, staff meetings, etc

    • Pakistan
    • Construction
    • 400 - 500 Employee
    • Planning Engineer
      • Jun 2017 - Sep 2018

      • Coordination of Planning Activities. Development of Level-1, Level-2, Level-3 and Level-4 Project Schedules. • Completion of Project Sequence through the selection of most appropriate techniques and Logical Sequence. • Select the most appropriate techniques and logical sequence of activities to complete project scope. • Development of Project Work Breakdown Structure in order for better management of Project Scope, Time and Cost. • Management of Resource through Development of Equipment and Manpower Mobilization Plans. • Preparation of Critical Path Schedule, cash Flows, Resources Histograms and S-Curves. • Identification of Critical Path Schedule and Interface between Design/ Engineering/ Procurement /Execution.

    • Pakistan
    • Retail Apparel and Fashion
    • 100 - 200 Employee
    • Assistant Engineer
      • Feb 2017 - May 2017

      Worked as a Assistant Engineer in Industrial Engineering department with the following Job Description - Design the operation bulletin and describing machine requirement. - Design line layout for every new style. - To do time study for every new style and calculate the standard minute value. - Monitoring line hourly sheet by hourly basis - To maximize the productivity - To minimize motion and transportation and to maximize the efficiency. - If not possible to balance with in the line then try to do line balance with in the section - Calculate the line efficiency - Continue to look for opportunity to implement IE tools and to reduce step, time and cost.

    • Human Resources Services
    • Intern
      • Jan 2017 - Feb 2017
    • Intern
      • Jun 2016 - Jul 2016

      “To Study the total hand value of worsted suiting fabric” - The Project was influence of different process stages on total hand value of worsted suiting fabric has been studied - The Investigation was made of worsted suiting fabric for surface properties at low load as well as formal lability and influence of different finishing treatment upon these properties “To Study the total hand value of worsted suiting fabric” - The Project was influence of different process stages on total hand value of worsted suiting fabric has been studied - The Investigation was made of worsted suiting fabric for surface properties at low load as well as formal lability and influence of different finishing treatment upon these properties

    • Pakistan
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Intern
      • Aug 2014 - Sep 2014

      Project title was “Productivity Enhancement through work-study, Bottleneck analysis and PDCA Cycle” - The research was focused on work-study in pre-assembly section of refrigerators; it will concentrate on reduction of production time and number of work activities. - To obtain the best use of human and material resources available in an organization of the work upon which it is engaged. - Systematic investigation of current work system in order to formulate the easiest and most effective system and method for achieving the goals. - To measure the work content of a job by measuring the time required to do a job for a qualified worker, which results in the establishment of standard time.

Education

  • University of the Punjab
    Bsc Industrial Engineering and Management, Engineering
    2013 - 2017

Community

You need to have a working account to view this content. Click here to join now