S M Tanzeel Tahir

Project Engineer (Civil ) at Shanghai Electric Group Co., Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Karachi Division, Sindh, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Anwar Ul Qamar

I rarely come across real talents who stand out like Tanzeel. I had the pleasure of working with Tanzeel for a years at the LBSQ Site, Tanzeel’s ability to handle multiple work tasks was unlike any I’ve seen before and made a dramatic increase in the productivity level of his company. No matter how tense a meeting, Tanzeel made sure everyone left with a smile. As a team member, Tanzeel earns my highest recommendation.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mechanical Or Industrial Engineering
    • 700 & Above Employee
    • Project Engineer (Civil )
      • Sep 2018 - Present

      Project Description: K. Electric TP-1000 (Transmission Line) – Construction of 132 kV & 220 kV Cable Trenches, Joint Bays, Road Crossings, Over Head Tower’s Foundations, Gantry’s Foundation, PLDP’s Foundations & their protection walls. (Main Contractor-Shanghai Electric) Responsibilities: 1) Preparation of daily progress report. 2) Preparation of quality inspections protocols & managing. 3) Liaising with clients & their representatives & acknowledge them about the site work. 4) Ensuring activities meet agreed approved specifications, quality and timescales. 5) Managing construction part of project. 6) Checking out of work that should be going as per drawing. 7) Resolving on-site technical issues with employer’s representatives, subcontractors and statutory authorities. 8) Attending meetings regarding site progress with sub-contractors & client. Show less

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Civil Engineer
      • Sep 2017 - Aug 2018

      Project Description: K. Electric TP-1000 – Construction of 11 kV Building including Control Rooms, Cable Trenches, GIS Building, Power Transformer Foundations, Fire Walls, Capacitor Rooms, SA Foundations, NGR Foundations, Fire Pump Rooms, Under Ground & On Ground Water Tanks, Guard Rooms & Boundary Wall. (Main Contractor-Siemens Pakistan) Responsibilities: 1) Preparation of daily progress report, weekly progress report, three weeks look ahead plan, monthly progress report & sharing with senior management. 2) Preparation of quality inspections protocols & managing. 3) Liaising with clients & their representatives & acknowledge them about the site work. 4) Ensuring activities meet agreed specifications, quality and timescales. 5) Managing construction part of project. 6) Checking out of work that should be going as per drawing. 7) Resolving on-site technical issues with employer’s representatives, subcontractors and statutory authorities. 8) Attending meetings regarding site progress with sub-contractors & client. Show less

    • Project Engineer -Civil
      • Apr 2016 - Aug 2017

      Project Description: K. Electric 9.8 MW SGTPS & KGTPS-II Expansion Project – Construction of Steam Turbines & Boiler and Air Cooled Condenser Foundations, Fire Walls, Cable Trenches, Transformers Foundations, Grid Station Building & Admin Building Units. (JV – Descon Engineering Limited & ALSTOM Grid Pakistan) Responsibilities: 1) Managing construction part of project. 2) Preparation of schedules, quantity take-offs; quality inspections protocols and look ahead plans & managing. 3) Checking plans, drawings and quantities for accuracy of calculations ensuring that all materials used and work performed are as per specifications. 4) Resolving on-site technical issues with employer’s representatives, subcontractors and statutory authorities. 5) Managing, monitoring and interpreting the contract design documents supplied by the client or architect. Show less

  • General Electro-Mechanique Pvt. Ltd.
    • General Electro-Mechanique Pvt. Ltd.
    • Project Engineer -Civil
      • Sep 2015 - Mar 2016

      Project Description: PNEC-(Pakistan Navy Engineering College)-Renovation & finishing work. Responsibilities: 1) Managing construction part of project. 2) Preparation of BOQ’s, Tender filling practise, schedules, quantity take-offs; quality inspections protocols and look ahead plans & managing. 3) Ensuring that all materials used and work performed are as per specifications 4) Resolving on-site technical issues with employer’s representatives, subcontractors and statutory authorities. 5) Attending meetings with clients and their representatives for upcoming works Show less

  • M/s Project Managers
    • M/S Project Managers
    • Site Civil Engineer
      • May 2014 - Aug 2015

      Project Description: K. Electric 9.8 MW SGTPS & KGTPS-II Expansion Project – Construction of Steam Turbines & Boiler and Air Cooled Condenser Foundations, Fire Walls, Cable Trenches, Transformers Foundations, Grid Station Building & Admin Building Units. (JV – Descon Engineering Limited & ALSTOM Grid Pakistan) Responsibilities: 1) Managing construction part of project. 2) Preparation of schedules, quantity take-offs; quality inspections protocols and look ahead plans & managing. 3) Checking plans, drawings and quantities for accuracy of calculations ensuring that all materials used and work performed are as per specifications. 4) Resolving on-site technical issues with employer’s representatives, subcontractors and statutory authorities. 5) Managing, monitoring and interpreting the contract design documents supplied by the client or architect. 6) Liaising with clients and their representatives (architects, engineers and surveyors) attending regular meetings to keep them informed of progress ensuring activities meet agreed specifications, quality and timescales. Show less

Education

  • Sir Syed University of Engineering and Technology
    Bachelor’s Degree, Civil Engineering
    2010 - 2013
  • Adam Jee Government Science College, Karachi, Pakistan.
    Intermediate, Pre-Engineering
    2007 - 2009
  • Civic School, Karachi, Pakistan.
    Matriculation, Computer Science
    2006 - 2007

Community

You need to have a working account to view this content. Click here to join now