Ryan Vann
Sales Engineer at Bulk Handling Systems- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Bulk Handling Systems
-
United States
-
Machinery Manufacturing
-
1 - 100 Employee
-
Sales Engineer
-
Jul 2014 - Present
Responsibilities include analysing customer recycling equipment/system design logic, industry observations and continued improvements with travel to systems in all phases of operational life. In house R&D of design and equipment usage. Responsibilities include analysing customer recycling equipment/system design logic, industry observations and continued improvements with travel to systems in all phases of operational life. In house R&D of design and equipment usage.
-
-
-
Gheen Irrigation Works, Inc.
-
Gheen Irrigation Works, Inc.
-
Assistant to Production Supervisor
-
May 2013 - Jul 2014
Responsibilities include analysis of purchasing orders with conversion to labor specific jobs. Work cell and production based forecasting of inventory in a production environment. When not performing the above duties, responsible for the creation of company production and engineering documentation. This includes the prototyping of factory generic components as well small scale custom design and fabrication. Responsibilities include analysis of purchasing orders with conversion to labor specific jobs. Work cell and production based forecasting of inventory in a production environment. When not performing the above duties, responsible for the creation of company production and engineering documentation. This includes the prototyping of factory generic components as well small scale custom design and fabrication.
-
-
-
Peterson, an Astec Brand
-
United States
-
Machinery Manufacturing
-
1 - 100 Employee
-
Design Drafter
-
Oct 2007 - May 2012
Assistant to the Chief Hydraulic Engineer in the design & rapid prototyping of World-Class Whole-Tree Chippers and Grinders. Quickly addressed any needs or problems pertaining to the operation of multiple machine lines, both in field & in testing environments. Was required to deliver detailed engineering documents to various parties and assembly staff, with adherence to strict safety and project standards, all within tight delivery deadlines. Assistant to the Chief Hydraulic Engineer in the design & rapid prototyping of World-Class Whole-Tree Chippers and Grinders. Quickly addressed any needs or problems pertaining to the operation of multiple machine lines, both in field & in testing environments. Was required to deliver detailed engineering documents to various parties and assembly staff, with adherence to strict safety and project standards, all within tight delivery deadlines.
-
-
-
Venture Data
-
Market Research
-
100 - 200 Employee
-
Interviewing Technology Assistant
-
Aug 2004 - Oct 2007
Assisted Major Political Party with collecting unbiased data, pertaining to the consumer desires & voting habits of Americans nationwide. Made daily contact with respondents from all walks of life & political affiliations while adhering to strict, standardized methods of quality control & ensuring respondent satisfaction. Assisted Major Political Party with collecting unbiased data, pertaining to the consumer desires & voting habits of Americans nationwide. Made daily contact with respondents from all walks of life & political affiliations while adhering to strict, standardized methods of quality control & ensuring respondent satisfaction.
-
-
-
Hynix Semiconductor
-
Eugene, Oregon Area
-
Test Dept. Team Member
-
Sep 2005 - Aug 2007
Member of a specialized team assembled to verify, diagnose, and administer production yield in an assembly line environment. Worked in a Class 1 clean room environment for shifts lasting up to 12 hours. Communicated with Shift Managers in regards to quality control & equipment, and provided a full & accurate accounting of all steps of team's responsibilities. Member of a specialized team assembled to verify, diagnose, and administer production yield in an assembly line environment. Worked in a Class 1 clean room environment for shifts lasting up to 12 hours. Communicated with Shift Managers in regards to quality control & equipment, and provided a full & accurate accounting of all steps of team's responsibilities.
-
-
-
-
Site Maintenance
-
Jan 2003 - Aug 2004
Responsibilities were maintenance of work site, including accessing/securing company facilities both during and after scheduled shifts. Interacted with managers, coworkers and clients while performing tasks. Maintained scheduled treatment and documentation of client facing equipment (aquatic recreation, analysis of water quality/pH, proper use of hazardous materials). Responsibilities were maintenance of work site, including accessing/securing company facilities both during and after scheduled shifts. Interacted with managers, coworkers and clients while performing tasks. Maintained scheduled treatment and documentation of client facing equipment (aquatic recreation, analysis of water quality/pH, proper use of hazardous materials).
-
-
Education
-
Churchill High School
High School Diploma, General/Liberal Arts