Ryan Mcleod
Operations Supervisor at Envo Energy Solutions Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
iosh managing safely
IOSHDec, 2015- Oct, 2024 -
S/NVQ LVL3 Installing P&S-MECHANICAL
Engineering Construction Industry Training BoardMar, 2003- Oct, 2024 -
S/NVQ LVL 2 2 Supporting P&S-MECH
Engineering Construction Industry Training BoardJan, 2003- Oct, 2024 -
safety and awareness training & assessment for gas and other combustible fuels
SGAS LIMITEDNov, 2020- Oct, 2024
Experience
-
Envo Energy Solutions Limited
-
United Kingdom
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Operations Supervisor
-
Oct 2020 - Present
-
-
-
Doosan Babcock
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Adv Mechanical Fitter
-
Jan 2004 - Sep 2020
TRADE COMPETENCES• Maintenance of Site Plant/Tools/Systems• Boiler Wall Tube Panel Installation• Mechanical line up using dti• Tangent Wall Tube Installation• Able to Work on Arrangement Drawing• Able to Work on Isometric Drawings• Large Bore Pipework Installation• On-Site Machining• Pipe / Tube Manipulation / Bending• Hydro testing• Using hytorque equipment• Rotating plant Maintenance• Ducting Work• Flange Joints• Prep pipe to butt join for welding• S.Bore Line Work Fab/Install <12"nb• Valve Replacement-flanged/Butt Weld• Superheater Header Replacement• Drum Inspection / Refurbishment• In Service Inspection Work• Ability to Work with Trainees• Hot GrindDEMONSTRATIONOF COMPLEMENTARYTRADE COMPETENCESAND EXPERINCE’S• Welding• Burning• Grinding• Safety System Permit Acceptor• Experience/Knowledge of Works/Site• Organisational Abilities• Grind & Polish to NDT• Chase faults & Blend Weld• Polish to 1 micron finish for Etching to sample, then inspect under microscope to visual weld and parent area for defects• Grind Profiles• Able to Assist Fitters• Able to Assist Erectors• Able to Assist Welders• Fabrication Shop Ability (Pipework)• Fabrication Shop Ability (General)• Cable Pulling• Handyman / General Operative/ Labourer• Maintenance/Fault Finding• New installations.• Working under pressure.• Good Knowledge of word, excel and power point.• Health and safety practice.• Working with others or alone.• Being available when required and under heavy work load.• Fast learner and enjoys work challengesOTHER TRAINING AND SAFETY TRAINING• IOSH Managing safely course• Nuclear cleared (Disclosure Scotland)• Safety Passport- CCNSG• Abrasive Wheel - Mounting• Critical Task Confined Space• ECI - Validators• ECI - Validated Achievement• Fire Safety Awareness• Forklift - Counterbalance• Safety Harness Training & Insp• Human Performance Foundation• Confined Space – Awareness• Shift Planning(Vessel entry) nuclear division Show less
-
-
Adv Mechanical Fitter
-
Feb 2004 - Feb 2019
Cockenzie power station- maintenence/overhaul.coal firedLongannit power station, outage/overhaul.coal firedPeterhead power station, emergence boiler repair, overhall/outageNorth British distillery,valve, boiler, pipe work repairs.Norway (Kärtso) installation of gas burners.gas fired station.Shell stanlow, replicating ndt works Ballylumford, replicating ndt works Sizewell b nuclear, pipe installation, valve replacement.Grangemouth, presure testing, heat exchangers, new pipe work installation.oil Refinery.Haysham 2 nuclear, 40" 26" and small bore pipe work fabrication and installation, refit replace worn parts in restrainers, actuator and valve repairs.Torness, Condenser pipe work, installation of puddle valves ,new gear boxes actuators.Gateshead Nuclear services, planning safety dives and different areas of work,chairing pre entry meetings,progress captured next steps and safety issuesHeysham 1 planning work into reactor ,chairing pre entry meetings,progress captured next steps and safety issues.Hunterston 1.planning work into reactor ,chairing pre entry meetings,progress captured next steps and safety issuesHinkley B planning work into reactor ,chairing pre entry meetings,progress captured next steps and safety issuesHeysham 2 2015 outage:supervisor of cw/rsw pipework,valves and repairs in and around the pumphouse;Heysham 2 2015 mech supervisor part of the project team.lynemouth 2016, coal fire station conversions to bio mass, burner installs pf pipe work,core air fans,tac actuators, fire eyes, commissioning of burner components. Show less
-
-
Mechanical Supervisor
-
Feb 2015 - Apr 2016
• Client meetings, site inspections and commissioning of installations• Preparing estimates and quotations • Procurement of materials • Scheduling of work • Preparation of Method Statements and Risk Assessments• Tool box talks, daily briefs, safety briefs, task sheets and monitoring of time sheets
-
-
Shift planner
-
Mar 2014 - Apr 2015
March 2014Currently in planning role with Doosan Power Systems using excel spreadsheets and working in accordance CWI’s, chairing morning dive meetings with management (Doosan and EDF) to discuss next steps and progression. Daily work entails Planning the next dive into the reactor when putting the men in must follow the radiation dose and lowest in first when practical then using CWI to line up the next part of work, Keeping in contact with Vessel Entry controllers to follow the movement of men keeping records of work progress for shift hand over and next steps of work. Future plans to move forward with this knowledge and gain my p6/p7 primavera and become a project planner with my mechanical back round and experience I think both together would allow more realistic plans and time scales of jobs overall being cost effective. Show less
-
-
Education
-
Dalkieth high school
-
Dalkieth high school