Ryan Campbell

Chief Operating Officer/Owner at SFG Industrial, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Houston, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

James Stilwell

Worked with Ryan at the beginning of his career and he was always motivated to advance his knowledge and take on projects and complete them within a specified time.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ISA
    -

Experience

    • Chief Operating Officer/Owner
      • Jun 2016 - Present

      Safety First Group(SFG) is an industrial company specializing in Safety, PSM, Commissioning and Inspection. We also provide cost saving spare parts analysis for capital projects and commissioning teams to assist safe RFSU status. Our Safety Engineers provide Safety Studies, LOPA, PHA, QRA analysis for your plant and capital project needs. We provide customized on site training for you employees. Our software platform SafetyAnywhere provides owners and their contractors LMS, MOC and ACT modules to assist you with all your training, MOC and action tracking. Check out our website at www.safetyfirstgroup.com Show less

    • Project Manager
      • Oct 2015 - Jan 2017

      Project Manager for Total Cray Valley Plant in Beaumont, TX responsible for managing capital projects and undertaking plant wide reliability studies to improve plant runtime and identify potential projects to improve overall reliability. Team Leader for a Finishing Building Innovation Challenge to improve reliability and increase throughout. Project Manager for Total Cray Valley Plant in Beaumont, TX responsible for managing capital projects and undertaking plant wide reliability studies to improve plant runtime and identify potential projects to improve overall reliability. Team Leader for a Finishing Building Innovation Challenge to improve reliability and increase throughout.

    • France
    • Truck Transportation
    • Mechanical Completion Manager
      • Feb 2015 - Sep 2015

      Led a team of mechanical completion engineers to assist in the support of Engineering and Construction and Commissioning of a 300MMSCF/D Gas Plant in Punta Fijo, Venezuela. This plant features JT refrigeration, glycol dehydration and condensate stabilization. The plant also has the fourth largest inlet receiving vessel in the world at 28,000 bbl capacity.

    • Field Project Manager for Cardon IV Project Venezuela
      • Sep 2014 - Feb 2015

      Led a team of engineers and commissioning technicians to support and commission a 150MMSCF/D JT Gas Plant in Punta Fijo, VZ for Cardon IV. This includes Glycol Dehydration, Hot Oil HM System, Mercury Absorption and a massive 28,000 bbl Slug Catcher.

    • Venezuela
    • Oil and Gas
    • 100 - 200 Employee
    • Lead Project Engineer for Cardon IV Project Venezuela
      • Mar 2014 - Sep 2014

      Lead Phase 150 of a 1.2BCF/D Gas Processing Plant in Punta Fijo, VZ. Responsible for an owner engineering team to comply with industry and company standards. Coordinated Engineering and Mechanical Integrity Team for inspections of $300MM of equipment and oversaw FATs at vendor sites prior to shipping to Venezuela Lead Phase 150 of a 1.2BCF/D Gas Processing Plant in Punta Fijo, VZ. Responsible for an owner engineering team to comply with industry and company standards. Coordinated Engineering and Mechanical Integrity Team for inspections of $300MM of equipment and oversaw FATs at vendor sites prior to shipping to Venezuela

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Hess Commissioning Manager
      • Mar 2013 - Mar 2014

      Develop Pre-Commissioning and Commissioning Plan for the startup of a 250MMSCF/D Cryogenic Fractionator for Hess Corporation as a key member of the Integrated Commissioning Team. Lead procedures for Document Control, Commissioning Procedures, Operating Procedures as well as a team of field personnel from construction handover to care, custody and control. Assisted operations for plant startup, plant dry-out and full operations. Develop Pre-Commissioning and Commissioning Plan for the startup of a 250MMSCF/D Cryogenic Fractionator for Hess Corporation as a key member of the Integrated Commissioning Team. Lead procedures for Document Control, Commissioning Procedures, Operating Procedures as well as a team of field personnel from construction handover to care, custody and control. Assisted operations for plant startup, plant dry-out and full operations.

    • Project Manager - Crossroads TOx
      • Jul 2012 - Mar 2013

      Managed a project to install a JZ Thermal Oxidizer at a 85MMSCF/D Cryogenic Gas Plant and bring site into LDEQ Compliance.

    • Project Manager - Springhill ILH Project
      • Jul 2012 - Feb 2013

      Managed a project consisting of Site Debottlenecking Design, Inlet Header, Inlet Liquid Handling, ESD System Design on a 85MMSCF/D Compressor Station with 8 pipelines on a 2 acre site.

    • Project Manager - North LA BMS Upgrade
      • Nov 2011 - May 2012

      Managed a Project for DCP Midstream to install 13 BMS systems on TEG Dehydrators. Upgraded controls, improved instrumentation, commissioned panels and solar systems, managed schedule, cost control and construction Managed a Project for DCP Midstream to install 13 BMS systems on TEG Dehydrators. Upgraded controls, improved instrumentation, commissioned panels and solar systems, managed schedule, cost control and construction

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Plant Operations Manager
      • Jul 2010 - Nov 2011

      Managed all aspects of a 70 MMSCF/D Cryogenic Gas Plant, PHA Team Member, Raywood Integration Team Member, Due Diligence Team Member for Raywood Gas Plant and Blacklake Pipeline Aquisitions

    • Instrument and Electrical Technician
      • Oct 2005 - Jul 2010

      I & E Technician at a 230 MMSCF/D Cryogenic Gas Plant. HMI and PLC Programming and Commissioning. Project Management, AFE/ROI Development and Implementation, CAD , PEAT Team Member.

    • Turnaround Manager
      • Dec 2009 - May 2010

      Managed all aspects of a turnaround and startup for a 230MMSCF/D Cryo Plant which included the following: Demethanizer Tower Tray Redesign, Mechanical Integrity Internal Vessel Inspections, Inlet Liquid Handling Project, Liquid Metering Project, Molecular Sieve Replacement, Residue Compressor Overhauls, Lean/Rich Exchanger Upgrade, Burner Management Controls Upgrade

    • Natural Gas Engine/Compressor Mechanic
      • Jul 2002 - Oct 2005

      Gas Compressor Maintenance, Emission Testing and Compliance, Pump Repairs and Alignments, Project Management Gas Compressor Maintenance, Emission Testing and Compliance, Pump Repairs and Alignments, Project Management

    • United States
    • Food and Beverage Manufacturing
    • Owner
      • Oct 2000 - Jul 2002

      Owned and Operated a Successful Automotive Shop for European Imports. Owned and Operated a Successful Automotive Shop for European Imports.

    • United States
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Technician
      • May 1995 - Sep 2000

      Worked on all aspects/models of Mercedes Benz automobiles. This is where I found my love for electronics and desire to take this a step further with a degree in Instrumentation. Worked on all aspects/models of Mercedes Benz automobiles. This is where I found my love for electronics and desire to take this a step further with a degree in Instrumentation.

Education

  • Lamar Institute of Technology
    A.A.S Instrumentation Technology, Instrumentation Technology
    2000 - 2002
  • Lamar University
    A.A.S., Advanced Engine Technology
    1994 - 1996
  • Nederland High School
    1990 - 1994