Rustem Omarov
at Asia Gas Pipeline- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Asia Gas Pipeline
-
Kazakhstan
-
Oil and Gas
-
1 - 100 Employee
-
-
Feb 2018 - Present
provision of the required mode of gas transportation in compliance with the uninterrupted, accident-free and safe operation of the main, auxiliary process equipment, as well as hazardous technical devices, by timely and quality implementation of the Plan-schedules of technical maintenance and repair of process equipment and technical inspection during operation.
-
-
-
Feb 2013 - Feb 2018
continuous monitoring and analysis of the mode of gas transportation, management and monitoring, ensuring the smooth and trouble-free operation of technological and auxiliary equipment, timely accounting, recording and sending the operating parameters, modes of operation of the compressor station at the head dispatcher service and timely transmission of operational information affecting the operation of the CS higher officials act in accordance with the rules of operation of main gas pipelines in emergency situations at the CS. Show less
-
-
-
KTR
-
Kazakhstan
-
Oil and Gas
-
100 - 200 Employee
-
-
Aug 2012 - Feb 2013
CIT (> 4000 hours), operation of all equipment of the Chilik compressor station (HPA Rolls-Royce RB-211), Kazakhstan-China gas pipeline
-
-
-
Mar 2012 - Aug 2012
Compressor Repair (Dresser Rand, Mycom)PCC Design, supply, construction and installation work and commissioning of upgraded GPU (GE Frame 3) at the compressor station "Chizha"
-
-
-
May 2011 - Mar 2012
Construction and installation work and commissioning of the Kereit compressor station (HPU Rolls-Royce RB-211), Kazakhstan-China gas pipeline
-
-
Education
-
Kazakh University of Technology
Bachelor's degree, Chemical technology of organic substances