Rubei Ma
General Manager - Open Pit Mining at Norton Gold Fields Pty Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Advanced Diploma of Risk Management
TNL Consultants Pty LtdNov, 2022- Nov, 2024 -
Western Australia Unrestricted Quarry Manager Certificate of Competency
Department of Mines, Industry Regulation and Safety, Western AustraliaNov, 2014- Nov, 2024
Experience
-
Norton Gold Fields Pty Ltd
-
Australia
-
Mining
-
200 - 300 Employee
-
General Manager - Open Pit Mining
-
Jan 2023 - Present
-
-
Open Pit Mining Manager
-
Oct 2021 - Jan 2023
Manage both Contractor and Owner Operations onsite, total responsible team member over 350.
-
-
-
Atlas Iron Pty Ltd
-
Australia
-
Mining
-
100 - 200 Employee
-
Mine Superintendent
-
May 2020 - Oct 2021
Manage Mining Contractor (L&H and Processing) onsite safety and production performance. Acting Register Manager (Senior Site Executive) over four months. Contract claim reviews and dispute mitigations Manage Mining Contractor (L&H and Processing) onsite safety and production performance. Acting Register Manager (Senior Site Executive) over four months. Contract claim reviews and dispute mitigations
-
-
-
Mineral Resources Limited
-
Australia
-
Mining
-
700 & Above Employee
-
Technical Services Superintendent
-
Dec 2018 - Apr 2020
Recruit and rebuild the technical team on site. Establish the short mine planning system and process.Introduce the supply chain scheduling to ensure product quality to deliver to business needs.
-
-
Senior Mining Engineer / Alternate Quarry Manager
-
May 2018 - Dec 2018
- Rolling three monthly plan. Set up site specific engineering standards and procedures. Bridge the gap between operations and planning by promoting a strong problem solving culture at workplace.
-
-
-
Rio Tinto
-
United Kingdom
-
Mining
-
700 & Above Employee
-
Mine Production Engineer / Alternate Quarry Manager
-
Jan 2018 - May 2018
-Overseeing that mine operations and equipment run safely, cost effectively and with respect to environmental policies. Manage mine supporting infrastructure projects and supervising 9/6 mine operation teams.-Daily pit inspection and safety audit. Manage and monitoring high tasks carried out in the pit. Report to department of Mines and petroleum as requiredActing Senior Mine Production Engineer (1.5 months)
-
-
Mine Planning Engineer / Deputy Quarry Manager
-
Apr 2017 - Jan 2018
-Promoting team sprites while leading team of engineers. Engaging different stockholders and prioritize tasks between different departments as well as tutoring young graduates/engineers. Acting Senior Mining Engineer (3 months)Acting Technical Service Superintendent (1 month)
-
-
Operations Planning Engineer/ Deputy Quarry Manager
-
Aug 2014 - Apr 2017
Grade Control/Mine Schedule Engineer (1yrs 6 month)- Stakeholder engagement. Communicate between Mine, Plant and Rail to ensure the quality and quantity of product while maximise efficiencies/output from equipment and manage different material type (GOL, high moisture and Oversize). Mine Planning Engineer (1 yrs)-Schedule realistic and sustainable plans (weekly and monthly) which includes pit development, drill & blast activity and production operations to drive safety and operation efficienciesDrill & Blast Engineers (3 months)
-
-
Graduate Mining Engineer
-
Jan 2012 - Jul 2014
Drill & Blast Engineer (1 yr)- Drill and blast designs (Drill pattern, explosive loading and timing), optimization projects and blast design innovations. Open Pit Practical Time (1yr)- Gain valuable practical experience including heavy machine operating (830E Komatsu electric haul truck, SKSS/SKF production drill rigs). Trained and competent for surface mining electronic timing and charging. Step-up open pit supervisor.Mine Desgin Engineer (6 month)- Whittle Optimization, Pit design and Dump designs. Prepare memo and presentations for study projects and LOM (life of mine). Involved projects and studies including mine closure, rehabilitation and block model audit.
-
-
-
Norton Gold Fields Pty Ltd
-
Australia
-
Mining
-
200 - 300 Employee
-
Mining Engineer
-
Jan 2011 - Jan 2012
Production and Drilling blast two week plan. Drill and blast design. Contactor management and cost audit. (4 months) Geotechnical engineer (pit slope parameters measurement and structural mapping). Completed graduate thesis on drill blast optimisation in relation to geotechnical mapping (3 months) Appointed shot firer training and blast crew practical time (6 months) Production and Drilling blast two week plan. Drill and blast design. Contactor management and cost audit. (4 months) Geotechnical engineer (pit slope parameters measurement and structural mapping). Completed graduate thesis on drill blast optimisation in relation to geotechnical mapping (3 months) Appointed shot firer training and blast crew practical time (6 months)
-
-
Education
-
Curtin University
Bachelor of Mining Engineering, Engineering -
GEOVIA Whittle Course
Mine Planning