Rosa G.

Production planner at Denel SAAB, Johannesbourg
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
City of Johannesburg, Gauteng, South Africa, ZA
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • South Africa
    • Aviation and Aerospace Component Manufacturing
    • 1 - 100 Employee
    • Production planner
      • Jan 2007 - Present

      MRP planning, launching of PPS’S on the system, checking to see if PPS is delivered to the shop floor on time, sorting out problems while parts is being manufactured.Liasing with assembly line, attending meetings. Give feedback to Poduction leaders. Creating shortage reports. MRP planning, launching of PPS’S on the system, checking to see if PPS is delivered to the shop floor on time, sorting out problems while parts is being manufactured.Liasing with assembly line, attending meetings. Give feedback to Poduction leaders. Creating shortage reports.

    • Admin asssistant
      • Sep 2003 - Dec 2006

      Debtors & Creditors, Filing, BSP (Billing and settlement planning), Ordering of paper and cartridges for printer. Admin duties. Debtors & Creditors, Filing, BSP (Billing and settlement planning), Ordering of paper and cartridges for printer. Admin duties.

    • Girl Friday
      • Jan 2003 - Sep 2003

      Switchboard, Typing of letters and Quotations, Doing invoicing & wages on Pastel, filing of documents, Debtors And Creditors. Switchboard, Typing of letters and Quotations, Doing invoicing & wages on Pastel, filing of documents, Debtors And Creditors.

    • Aviation and Aerospace Component Manufacturing
    • 200 - 300 Employee
    • Data controller
      • Feb 1989 - Apr 2000

      To create bill of material, Routings on the Mass system. Controlling the flow of the PPS’s from planning to library. Filing of documentation.Spreadsheets on Excel for Rooivalk dept. Various work on PC. Working on SAP (System Application Products). MRP planning, launching of PPS’S on the system, checking to see if PPS is delivered to the shop floor in time, sorting out problems while parts is being manufactured. To create bill of material, Routings on the Mass system. Controlling the flow of the PPS’s from planning to library. Filing of documentation.Spreadsheets on Excel for Rooivalk dept. Various work on PC. Working on SAP (System Application Products). MRP planning, launching of PPS’S on the system, checking to see if PPS is delivered to the shop floor in time, sorting out problems while parts is being manufactured.

Education

  • Hoër meisieskool Hugenote
    1977 - 1982

Community

You need to have a working account to view this content. Click here to join now