Ron Amos

Electrical and Instrumentation Supervisor at Complex Electrical (CE Group)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Currimundi, Queensland, Australia, AU
Languages
  • English -
  • Thai -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Mal Diery

Ron, has high level Project Management skills and a very good understanding of what it takes to deliver a successful project. Ron managed a major Power Station Project that was fraught with difficulties and drove the Project to produce a good outcomes despite significant obstacles including the Principle going into Administration.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Engineering Services
    • 1 - 100 Employee
    • Electrical and Instrumentation Supervisor
      • Sep 2023 - Present

      Tallawarra B Power Station a 316MW expansion of the existing 435MW Tallawarra Power Station located in Illawarra, New South Wales (NSW), Australia. Tallawarra B Power Station a 316MW expansion of the existing 435MW Tallawarra Power Station located in Illawarra, New South Wales (NSW), Australia.

    • Australia
    • Mining
    • 700 & Above Employee
    • Construction Supervisor Fortescue
      • Feb 2023 - Sep 2023

      E&I Construction Supervision, QA/QC, Completions, Clear Punch List Items. E&I Construction Supervision, QA/QC, Completions, Clear Punch List Items.

    • Germany
    • Oil and Gas
    • 700 & Above Employee
    • Electrical and Instrumentation Technical Consultant
      • Oct 2019 - Jul 2022

      E&I Consultation works for Linde (Thailand, Oman & Saudi Arabia) - Loop Check Supervision including: › Reviewing and commenting on Instrumentation construction issues that may have a detrimental impact on pre-commissioning and/or commissioning activities. › Reviewing and commenting on project specifications and requirements. › Assisting updates of Instrumentation systems if required. › Assisting in constructability issues if required. › Reviewing Instrumentation work (installation, testing and commissioning) for compliance with all applicable codes, specifications, and requirements. › Reviewing of the quantity of the work performed by the E&I subcontractor / construction partner. › Reviewing resolving issues presented by an E&I subcontractor/ construction partner. › Assisting in maintaining mark-up drawings. › Involvement in system completion as required for loop check, function test and plant pre-commissioning and commissioning. › Reviewing and assisting in E&I Mechanical Completion inspection and testing. › Supporting coordination of the E&I vendors as required. › Following Client's safety policies and procedures as outlined in the Safety Manual. › Reviewing and commenting of discipline progress with subcontractor/construction partner/vendors and request adequate corrective measures/ program (as required). › Monitoring contractual obligations Client and Subcontractor, construction partner vendors for each corresponding discipline. › Detail planning, reviewing, and implementing of required procedures for Loop check activities. Show less

    • Japan
    • Oil and Gas
    • 700 & Above Employee
    • E&I Superintendent
      • Oct 2016 - Jun 2019

      → Managing a large, multi-disciplinary team consisting of over 100 personnel throughout the pre-commissioning, commissioning and construction of E&I works, maintaining high productivity standards and meeting deadlines. → Conducting extensive reviews of E&I work instructions, developing strategies and initiatives aimed at executing instructions efficiently and following specific procedures on a day-to-day basis to standardise outcomes. → Providing high-quality advice relating to electrical engineering activities in support of work packages across the Combined Cycle Power Plant (CCGT-CCPP) and Trains 1 and 2, applying technical expertise and experience. → Overseeing complex site installations in strict accordance with company plans and policies, liaising with teams to assess requirements and consider central safety concerns prior to completing works in line with expectations. → Developing and implementing quality assurance and control (QA/QC) management system across worksite to optimise each process and prevent operational delays, as well as distributing relevant QA/QC documentation. → Performing a range of safety-related duties, including signing off on permits for work and isolation procedures, participating actively in internal and external audits and closely following safe working practices at all times. Show less

    • Oil and Gas
    • 200 - 300 Employee
    • E&I Superintendent and QA/QC Manager
      • Aug 2014 - Sep 2016

      → Supervised varied, comprehensive E&I works, including highly technical electrical engineering, throughout the completion of work packages on the Inlet, Meg Area, Agru, Train 3 and Combined Cycle Power Plant. → Developed Work Method Statements (WMSs), concisely outlining the correct procedures for individual tasks in sequential order and monitoring the execution of tasks to ensure that WMSs were accurately applied. → Contributed actively to extensive planning processes, reviewing drawings, specifications and other scope documents, as well as considering manpower requirements, to improve the accuracy and relevancy of plans. → Evaluated plans, instructions and procedures to identify continuous improvement opportunities and introduce models and strategies to achieve incremental improvements and positively influence company performance. → Maintained consistent adherence to QA/QC management system throughout liaisons with CKJV personnel, subcontractors and vendors, as well as designing creative and effective solutions to critical non-conformances. → Built a strong understanding of relevant national and industrial statutes and regulations to guide safety and quality performance, creating a safe, responsible workplace environment and protecting site workforce. Show less

    • Australia
    • Industrial Machinery Manufacturing
    • 300 - 400 Employee
    • Senior E&I Project Manager
      • Mar 2013 - Jul 2014

      → Performed project management services for a $54m E&I package covering the construction, pre-commissioning and commissioning of a Combined Cycle Power Plant, driving optimal performance to reach key milestones. → Managed financial considerations throughout project lifecycle, controlling all expenditure associated with key activities, implementing cost-saving initiatives when required and operating within budgetary constraints. → Collaborated with client representatives to identify quality requirements within project scope, ensure that ongoing quality-related activities met relevant codes and standards and address any developing issues. → Coordinated the day-to-day responsibilities of over 120 trades personnel, providing support and guidance to enhance individual and team performance across electrical engineering and instrumentation duties. → Developed 2- and 6-week look-ahead schedules during liaisons with multi-disciplinary managerial teams and tracked progress against schedules, modifying targets based on unexpected issues and other constraints. → Oversaw the production and distribution of non-conformance reports (NCRs) outlining specific defects and relevant accompanying information, facilitating close reviews of the issues/s and preventing re-occurrence. Show less

    • United Arab Emirates
    • Engineering Services
    • 700 & Above Employee
    • Senior E&I Project Manager
      • Aug 2012 - Mar 2013

      → Managed the construction, installation and use of E&I equipment, ball mills, conveyors and crushers while handling organisational and financial demands relating to project pre-commissioning and commissioning. → Led crews throughout day-to-day responsibilities, training and mentoring individuals to support professional development and expand team capabilities as well as appropriately allocating duties across workforce. → Acted as a critical interface between the production and construction crews, facilitating open communication between crew representatives and enabling the targets of both teams to be achieved while ensuring safety. → Performed all responsibilities in adherence to weekly plans and project schedules, reviewing daily and weekly obligations prior to commencement and maintaining high standards to avoid re-works and associated delays. → Monitored performance consistently to ensure short- and long-term deadlines were met, ensured complete understanding of relevant KPIs and prepared reports summarising progress for project management. → Conducted extensive site inspections in collaboration with the QC department, coordinating the identification and analysis of non-conformances prior to overseeing the creation and application of practical solutions. Show less

    • Australia
    • Construction
    • 300 - 400 Employee
    • Senior E&I Project Manager
      • Nov 2011 - Aug 2012

  • PIDC Co LTD
    • Thailand
    • Construction Manager
      • Jan 1995 - 2011

Education

  • Inspire Education Pty Ltd (online)
    Diploma, Project Management and Business Administration
    2016 - 2018
  • Competency Training Pty Ltd
    Cert IV, Electrical - Instrumentation
    2016 - 2017
  • Inspire Education Pty Ltd (online)
    Cert IV, Work Health & Safety
    2015 - 2016
  • Project Management Institute (PMI®), PMP® PMBOK Compliant PMI # 2893178
    PMI, Project Management
    2011 - 2015
  • Harris University (online)
    Degree Construction Management
    2009 - 2012
  • Frankston Technical College
    "A" Grade Electrical & Instrumentation (Dual Trade)
    1970 - 1975

Community

You need to have a working account to view this content. Click here to join now