Rommel Sitohang

Head of Project Management Division at Pt. Grahabuana Cikarang
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Head of Project Management Division
      • Feb 2022 - Present

      Manage Design, Planning, Budgeting, Procurement and Construction Process Manage Design, Planning, Budgeting, Procurement and Construction Process

    • Head of Product Development Department
      • Feb 2016 - Jan 2022

      1. Assist sales and marketing team for setting strategic location of industrial or commercial plots for potential investors in accordance with the overall masterplan of Jababeka 2. Scheduling annual residential and commercial products (landed houses, shophouses, commercial buildings, apartments etc) 3. Coordinate with marketing team for preparing products to be launched, including marketing tools 4. Responsible from Concept Design to DED (Detail Engineering Design) process 5. Responsible on making Business Plan for every new product based on development cost and revenue projection 6. Design Coordinator for Monroe Tower (Middle-Class Apartment, 380 Units, 18 storeys, GFA = 13.500 m2) Status : Piling Works 7. Design Coordinator for Kawana Tower (Upper-Class Apartment, 234 Units, 21 storeys, GFA = 15.000 m2) Status : Schematic Design 8. Residential Products in 2016-2017 : New d'Cataluna, Beverly Hills Platinum, Palm Townhouse and Candi (Cluster of d'Java Residence) 9. Commercial Products in 2016-2017 : Shophouses of d'Java, Hollywood Boulevard, New Cortes and Sudirman Boulevard

    • Planning Manager of High Rise and Commercial Building
      • Jan 2014 - Jan 2016

      1. Project Coordinator for renovating President Executive Club (3 Stars Hotel, upgraded by adding 14 Units, 2 storeys) Construction Progress : Done 2. Design Coordinator of Superblock Hollywood Central@Jababeka (6 towers apartment, 1 office tower and an integrated 2 floors Lifestyle Mall, GFA = 126.147 m2) Status : Design Development 3. Project Coordinator for New-Elvis Tower (Middle-Class Apartment, 156 Units, 9 storeys) Construction Progress : Done 4. Project Coordinator for Hollywood Junction (Food and Beverage commercial area, GFA = 3.500 m2, Leasable Area = 2.600 m2) Construction Progress : Done 5. Representative’s Planning Manager for Mayfair - Plaza Indonesia Jababeka (Joint Venture with Plaza Indonesia Realty), GFA = 610.000 m2 consist of Hotel and Serviced Apartment integrated with Multifunction Hall, 1 Office tower, 12 towers of Condominium and Mall with theme park (planned for 4 phase development) Progress : Tender Drawing for Main Contractor, Scheduled for Tender : November 2016 Construction Progress : Piling Works 6. Design Coordinator for AEON Mall in Cikarang (Mixed-Use Building, Land Size = 50.000 m2, GFA = 55.000 m2, combined with 2 towers apartment, GFA = 32.000 m2) Status : Feasibility Study 7. Design Coordinator for Riverview Residences - Joint Venture with PT. PP Property Tbk in Cikarang (Mid-Low Apartments, Land Size = 25.000 m2, GFA = 92.000 m2, combined with 156 units shop houses, GFA = 11.200 m2) Status : Design Development

    • Senior Project Architect
      • Dec 2010 - Dec 2013

      1. Preparing Pre-Concept Design (such as Term of Reference and Floor Plans) and delivered to related consultants to be developed 2. Supervision and Coordinating Design with related consultants 3. Coordinating "Design - Tender - Construction" Process for Architecture and Interior Working 4. Supervision Project's progress with CM (Construction Management), contractors and tenants/users 5. Material Spesification 6. Final Account for Architectural and Interior works 7. Coordinating materials/equipments SBO (supplied by owner)

    • Indonesia
    • Real Estate
    • 1 - 100 Employee
    • Senior Architect
      • Jul 2008 - Nov 2010

      1. Re-Designing Facade 2. Re-Designing Floor Plans 3. Design Shopping Arcade 4. Re-Designing Modern Market 5. Design Eco-Green Townhouse 6. For Tender Drawing's Review 7. Project Supervision 8. Design Coordination with outsourcing architect consultant 9. Formatting Planning and Design Division’s Master Time Schedule 10. Formatting Project Development Division’s Project Status Report 11. Coordinating Project's Progress with QS, Civil Engineer and Construction Department 12. Material Approval’s control and review

    • Architect
      • Feb 2005 - Jun 2008

      1. Master Planning 2. Site Planning 3. Feasibility Study 4. Show Unit Design 5. Artist Impression for marketing tools 1. Master Planning 2. Site Planning 3. Feasibility Study 4. Show Unit Design 5. Artist Impression for marketing tools

    • Junior Architect
      • Oct 2004 - Jan 2005

      Design Development of Clubhouse Project on Riau, owner : Labersa Hutahaean Group. Design Development of Bukopin Learning Center Project on Jakarta. Design Development of Clubhouse Project on Riau, owner : Labersa Hutahaean Group. Design Development of Bukopin Learning Center Project on Jakarta.

    • Drafter
      • Jan 2004 - Apr 2004
    • Junior Architect
      • May 2003 - Jun 2003

Education

  • Universitas Indonesia (UI)
    Post Graduate, Project Management, Faculty of Engineering
    2012 - 2014
  • Institut Teknologi Bandung (ITB)
    Bachelor's degree, Architectural Engineering
    1998 - 2003
  • SMUN 8, Medan
    Senior High School
    1995 - 1998
  • SLTP St. Thomas 1, Medan
    Junior High School
    1992 - 1995
  • SD St.Antonius V, Medan
    Elementary School
    1986 - 1992

Community

You need to have a working account to view this content. Click here to join now