Roman Shulkin

Senior Project Engineer at "Silleno"​ LLP
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Nur-Sultan, Kazakhstan, KZ
Languages
  • Russian Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • International Energy Summer School SKOLKOVO
    Moscow School of Management SKOLKOVO
    Jul, 2019
    - Nov, 2024
  • IPMA Level D
    IPMA: International Project Management Association
    Aug, 2023
    - Nov, 2024

Experience

    • Kazakhstan
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Senior Project Engineer
      • Apr 2023 - Present

      SIBUR (40%) and KazMunayGas (60%) joint venture. SIBUR (40%) and KazMunayGas (60%) joint venture.

    • Russian Federation
    • Chemical Manufacturing
    • 700 & Above Employee
    • Senior Expert (Engineering management)
      • Sep 2021 - Apr 2023

      Capital projects and investments. Capital projects and investments.

    • Russian Federation
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Engineer
      • Sep 2020 - Aug 2021

      Irkutsk Polymer Plant project. International project and Irkutsk Oil Company LLC subsidiary (INK LLC). Gas chemical complex with a capacity of over 650 thousand tons of polyethylene per year. Amount of investment is more than $2.5 billion. Responsibilities: • Coordination of technical interactions between Owner’s departments, EP-Contractor (TOYO Engineering (Japanese and Korean offices)), RDIs and C-Contractor (Gemont, Turkey) at all stages of the project • Project management procedures development (Site TQ procedure Field instructions procedure, DCC procedures, Shop revision instruction procedure, business processes formalization (flow-charts development), etc.) • EP-contract change management. Control of compliance with the requirements of engineering contracts within approved Scope of work • Engineering meetings host • Project schedule development and its realization control • Technical requirements and SoW, Company’s official letters preparation • Purchase orders review, technical bid evaluation (TBE) of procured equipment and materials • Collection and transfer of technical and other data to the E/P/C Contractors • Preparation of documentation package together with the Project Organization to get a positive conclusion of the state expert appraisal of design documentation and engineering survey results (GGE), interaction with other Russian Authorities (RosTechNadzor, RosPrirodNadzor, etc.), participation in public consultations • Provision of project execution reports to Project Manager Achievements: • Development and implementation of integrated reporting and project control system • DCC reporting system development Show less

    • Oil and Gas
    • 400 - 500 Employee
    • Project Engineer
      • Jul 2017 - Aug 2020

      Joint venture of NOVATEK (50.1%), TOTAL (20%), China National Petroleum Corporation (20%) and the Silk Road Fund (9.9%). The largest production and liquefaction of natural gas (LNG) project in Russia with a capacity of over 16.5 million tons of LNG per year. Amount of investment is more than $27 billion. Responsibilities: • Coordination of Yamal LNG departments for review of technical reports on engineering surveys, PSTS, FEED and detail design documentation, scope of work preparation for above works, its approval for construction • Arrangement of market surveys, processing and review of submitted technical and commercial offers for selection of a preferred Engineering Contractor, approval of Subcontractors • Collection and provision of technical and other data to the Engineering Contractor • Preparation of technical requirements and connection specifications • Purchase orders review, technical bid evaluation (TBE) • Coordination of Yamal LNG departments, Construction Contractors and Design Institutes interactions at the stages of construction and commissioning regarding approval of deviations from detail design documentation and implementation of engineering solutions • Interaction with Russian Authorities (GGE, RosTechNadzor, RosPrirodNadzor, etc.), participation in public consultations • Provision of project execution reports to Project Manager Large completed projects: • Reconstruction of the 17,5 MW Power park (FEED+detail design, positive GGE conclusion) • Brash ice management system for the Sabetta seaport facilities (FEED+detail design, positive GGE conclusion) • SMW landfill reconstruction (detail design) • Water intake facility for drinking and industrial needs (FEED+detail design) Implemented projects outside of capital construction: •Formalization (development of procedures) and automation of business processes (overseeing software development on the side of a business customer) for management of changes (MoC) projects at the LNG Plant Show less

Education

  • Universitetet i Stavanger (UiS)
    Master's degree, Offshore Field Development Technology
    2015 - 2017
  • University Centre in Svalbard
    Arctic offshore engineering, B
    2016 - 2016
  • Gubkin Russian State University of Oil and Gas (National Research University)
    Master's degree, Offshore Field Development Technology
    2015 - 2017
  • Gubkin Russian State University of Oil and Gas (National Research University)
    Bachelor's degree, Petroleum Engineering
    2011 - 2015

Community

You need to have a working account to view this content. Click here to join now