Roman Recometa III

Continuous Improvement at USABlueBook
  • Claim this Profile
Contact Information
Location
Chicago, Illinois, United States, US

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Joe Lo

Roman was influential on many critical issues for process improvements. He strived on root causing stop ship defects, finding solutions with supplier and engineering team.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Brand and Product Management
    IE Business School
    Jun, 2022
    - Sep, 2024

Experience

    • United States
    • Retail Office Equipment
    • 200 - 300 Employee
    • Continuous Improvement
      • May 2023 - Present
    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Product Manager
      • Jun 2019 - May 2023

      ● Manage new and existing product lines by assessing and creating product strategies ● Research and analyze new product development processes through project management ● Provide support to sales teams and customers on technical product inquiries ● Manage product development, specifications, packaging, pricing, and life cycle plans Achievements ● Streamlined custom part inquiry process to improve lead time to the customer by reducing redundant non-value-added steps ● In addition to job scope, launched process improvement project to increase On Time Delivery metric to goal of 97% via Kaizen workshop exercises with Supply Chain stakeholders Show less

    • United States
    • Real Estate
    • Sr. Project Manager, Industrial Engineering
      • Sep 2014 - Jun 2019

      ● Strategize relationships with departments and senior leadership to guide engineering teams in execution of improvement initiatives that align with strategic goals ● Present project summaries, key findings, and action plans to project sponsors and Allstate learning workshops ● Collaborate with enterprise participants at operational level to drive process improvement ● Identify compliance to standard process and strategies for executing repeatable results ● Lead project teams with appropriate problem-solving methods suited for efficient analyses Achievements ● Advised operations and business sectors on improvement opportunities ● Implemented Lean Manufacturing methods such as Value Stream Maps, Time Studies, and Root Cause Analysis across the organization ● Identified $25M in revenue to reach 2018 sales goal through work measurement sample studies and determining causes of missed sales ● Saved $377K in annual operating costs at the Customer Contact Center by restructuring call routing and reducing average handle time from 10 minutes to nearly 7 minutes ● Assessed current state of Data Governance to identify non-compliant security processes, recalibrate external data recipients, and improve PII sharing methods ● Led $2.6M in cost savings opportunities for Customer Contact Center Self-Service activities in 2017 ● Advised Procurement Vice President with value stream mapping to improve the vendor onboarding lead time by 3 weeks, a 20% reduction ● Optimized dispatch operations process steps resulting in $320K process improvement savings for Allstate Roadside Services division Show less

    • United States
    • 1 - 100 Employee
    • Sr. Industrial Engineer
      • Oct 2008 - Aug 2014

      ● Utilize Lean Manufacturing principles and Six Sigma to execute impactful projects to operations ● Proficient in manufacturing line balancing, changeover reduction, Just-in-Time system implementation, point-of-use material systems, kanban systems, and supermarket implementation to reduce waste in the value stream ● Apply Six Sigma tools such as FMEA, MSA, DMAIC methods, Process Capability, and Control plans to sustain positive enhancements to the business ● Conduct Kaizen workshops with cross functional members of manufacturing and supply chain ● Interface with manufacturing to drive reduction in cost/defects, improvement in quality and capacity, and provide operational support ● Increase efficiency by planning workflow, assessing space requirements, and value stream layout ● Analyzed forecast to restructure value stream processes/layouts, and optimize staffing/capacity ● Advise production operators in executing their own Kaizen ideas ● Maintain supplier quality relationships for root cause analyses and forecasting Achievements ● Led time study projects to evaluate current state value stream assembly and test processes resulting in an average of 15% output increase ● Fully implemented changes per ISO 9001 guidelines by involving proper departments (HR, Operations, Training, IT) ● Applied lean process improvement to Infrastructure rack cabling and improved cycle time by 75% from 66 minutes to 22 minutes ● Obtained Six Sigma Green Belt by reducing assembly process time with poke yoke fixture implementation, and ensuring supplier quality issues were corrected, resulting in over $50K annual savings ● Led engineering teams in completing MSA and Capability analysis of four Six Sigma projects simultaneously in Q3 2012 to win the Lean Award against other Motorola sites ● Led the value stream to meet December 2012 volume demand that was 90% greater than historical volumes due to an emergency Coast Guard order Show less

    • United States
    • 400 - 500 Employee
    • Industrial Engineer
      • Jul 2006 - Jun 2008

      ● Work with engineering departments to create and implement best practices to the operation ● Analyze operating plan and determine opportunities to improve production output ● Conduct volume forecasting in order to advise optimum staffing requirements ● Audit production floor after the end of the shift to ensure packages are not left unprocessed Achievements ● Optimized volume flow by through forecast analyses and trailer placement to reduce package travel distance through the facility ● Supported outbound logistics operations to reduce load time by 10%, improve trailer capacity by 5%, and ensure safety of the operators Show less

Education

  • University of Illinois at Chicago
    Bachelor of Science (B.S.), Industrial Engineering
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now