Rois Khusumantoro

Health Safety Environment Coordinator at Daeah Engineering and Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Central Java, Indonesia, ID
Languages
  • Indonesian -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • SKK AMTBG (Building Engineer Expert)
    Badan Nasional Sertifikasi Profesi (BNSP)
    Mar, 2023
    - Oct, 2024
  • Ahli Keselamatan Dan Kesehatan Kerja
    Kementerian Ketenagakerjaan
    May, 2021
    - Oct, 2024
  • Scaffolding Certificate (Supervisor)
    PPSDM Migas
    Mar, 2020
    - Oct, 2024
  • Inspektor Pesawat Angkat (Crane Inspektor)
    Badan Nasional Sertifikasi Profesi
    Feb, 2021
    - Oct, 2024
  • Sea Survival & Offshore Emergency Procedure
    British Safety Council & Global Saftindo
    Jan, 2020
    - Oct, 2024
  • AK3 UMUM
    Kementerian Ketenagakerjaan
  • ISO 14001 : 2005 Sistem Manajemen Lingkungan (SML)
    MAP Jogjakarta
  • ISO 9001:2008 (Quality Management System)
    -
  • International Health Safety Passport
    ECITB & BNSP
  • OHSAS 18001:2007 (Ocupational Health and Safety Management System)
    -
  • SKA_Sertifikat Keahlian
    LPJK_Lembaga Pengembangan Jasa Kontruksi
  • Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3)
    -
  • Tenaga Teknik Khusus Keselamatan dan Kesehatan Kerja (Opr K3 Migas)
    PPSDM Migas
  • Training Auditor Integrated Management System [ ISO 9001:2008 & OHSAS 18001:2007 ]
    SMS Indonesia

Experience

    • South Korea
    • Architecture and Planning
    • 200 - 300 Employee
    • Health Safety Environment Coordinator
      • Oct 2021 - Present

      Scoupe works at the Refinery Development Master Plan (RDMP) for Project RU-V Balikpapan. Become a member of PT. Daeah E&C Package Scaffolding #SC03 #commonscaffolding. Maintenance of the HSE system of the RU V Balikpapan and PT Daeah E&C Refinery Development Master Plan (RDMP) Projects is mandatory and is related to inspection, reporting, and supervision to actualize HSE aspects, environmental management, emergency respon, vertical rescue and focus on scaffolding work in Engineering, Procurement, and Construction (EPC) Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL) for the Refinery Development Master Plan (RDMP) Project RU V Balikpapan and other HSE aspects during preparation, mobilization, and also during the installation and dismantle. Show less

    • Indonesia
    • Construction
    • 700 & Above Employee
    • HSE Inspector
      • Jan 2020 - Oct 2021

      NPK Chemical Plant 500.000 MPTY Project (Aceh) Scoupe work by PT PIM and PT PP Maintenance of the K3 system from PT PP is mandatory, as are inspection and supervision related to the actualization of OSH aspects, inspection of hand tools and heavy equipment, and environmental management. We always provide HSE standard advice for project activities, including jetty and pile work, in collaboration with the team. NPK Chemical Plant 500.000 MPTY Project (Aceh) Scoupe work by PT PIM and PT PP Maintenance of the K3 system from PT PP is mandatory, as are inspection and supervision related to the actualization of OSH aspects, inspection of hand tools and heavy equipment, and environmental management. We always provide HSE standard advice for project activities, including jetty and pile work, in collaboration with the team.

    • HSE Inspector
      • Feb 2019 - Nov 2019

      PT Indonesia Power, PT Kwarsa Hexagon, PT PP, and Wartsila collaborate on the Mobile Power Plant (MPP) 02 Manokwari 20 MW Project. Maintenance of the K3 system from PT PP is mandatory, as are inspection and supervision related to the actualization of OSH aspects, inspection of hand tools and heavy equipment, and environmental management. Together with the team, I always provide HSE-standard advice for project activities. PT Indonesia Power, PT Kwarsa Hexagon, PT PP, and Wartsila collaborate on the Mobile Power Plant (MPP) 02 Manokwari 20 MW Project. Maintenance of the K3 system from PT PP is mandatory, as are inspection and supervision related to the actualization of OSH aspects, inspection of hand tools and heavy equipment, and environmental management. Together with the team, I always provide HSE-standard advice for project activities.

    • HSE Coordinator
      • Jun 2018 - Dec 2018

      Vena Energy, PT PP, NARI project PLTS or solar cell PV 21 MWp scoupe work The PLTS project's environmental management as well as the coordination, monitoring, and supervision of the K3 component are both necessary for the maintenance of the K3 system from PT PP. I always offer the team guidance for project activity that adheres to HSE standards. We constantly offer guidance on OSH standards for project activities along with the HSE team and put a strong emphasis on implementation that is both safe and environmentally friendly, which is beneficial to all. Show less

    • Brazil
    • Engineering Services
    • 1 - 100 Employee
    • Site Safety Officer
      • Feb 2018 - Jun 2018

      The 500 KV Scoupe-Work Substation, also known as the Special Facility and Transmission Line (SUTET), supports PLTU's two 1000 MW Batang Jawatengah Indonesia power plants.project by Bhimasena Power Indonesia and Sumitomo Corporation. Assigned to work with 500 workers per day for the type of work in special facilities and 500 KV transmission lines, EHS teams are divided into two teams based on their work area. Maintenance of the K3 system from PT. GE is mandatory; GE supervises the actualization of the K3 aspect for all subcontractors and always advises on K3 standards for high-risk jobs considering transmission line work (loading and unloading material, bore pile civil work, tower erection, tower checking, stringing conductor, and commissioning). Show less

    • HSE Officer
      • Jul 2017 - Jan 2018

      Fire Protection and Fire Fighting System Scoupe work PT. PP and WARTSILA Indonesia, as well as PLN Indonesia, built the PLTMG 20 MW Kalibobo Nabire Papua site. Assigned to work: Document preparation: HSE [plan-implementation-review]. Maintenance & Control HSE System Stats at Construction, Effective Date, Backfeeding,firing,sycron,COD,TOC Fire Protection and Fire Fighting System Scoupe work PT. PP and WARTSILA Indonesia, as well as PLN Indonesia, built the PLTMG 20 MW Kalibobo Nabire Papua site. Assigned to work: Document preparation: HSE [plan-implementation-review]. Maintenance & Control HSE System Stats at Construction, Effective Date, Backfeeding,firing,sycron,COD,TOC

    • Telecommunications
    • 1 - 100 Employee
    • HSE Officer
      • Feb 2017 - Jun 2017

      Join the team (Telco-PT.TELKOM) on the Tangguh Expansion Project (Train 3) by CSTS (Chiyoda Saipem Tripatra SAE) and BP Tangguh (Bintuni-Sorong-Indonesia). initiate the preparation of HSE documents and present them to clients, and remain involved in the construction process while maintaining safety priority and always coordinating with clients for the realization of zero accidents. Join the team (Telco-PT.TELKOM) on the Tangguh Expansion Project (Train 3) by CSTS (Chiyoda Saipem Tripatra SAE) and BP Tangguh (Bintuni-Sorong-Indonesia). initiate the preparation of HSE documents and present them to clients, and remain involved in the construction process while maintaining safety priority and always coordinating with clients for the realization of zero accidents.

    • HSE Officer
      • Feb 2016 - Mar 2017

      Scoupe works on the fire protection and suppression systems at the 500 MW gas-fired power plant. 1. Tarahan-Lampung MPP (500 MW) 4x25 MW Site by PP & GE Jenbacher, PLN Bright Batam Indonesia 2. Suge-Belitung MPP (500 MW) by PP & GE Jenbacher, PLN Bright Batam, Indonesia Assigned to work: Document preparation: HSE [plan-implementation-review]. Maintenance & Control HSE System Stats at Pre-Construction, Effective Date, Backfeeding, Firing,firing,sycron,COD,TOC And get the Best HSE Implementation Award from PT.PP. Show less

    • Safety Officer
      • May 2015 - Oct 2015

      The Scoupe Commissioning Project (piping systems and mechanical works, for example) actually required the GS E&C Communications Team to support the RFCC Pre-Comm-Comm Cilacap Project. work tasks and maintenance; Permit system, Safety Talk (TBM),IBPR/HHIRA,Safety Report, maintenance safety awareness campaign,Advice-Monitor-Responsibility goal of zero accidents,Observation and Intervention Optimization, Excellent Close Finding, andWaste Management The Scoupe Commissioning Project (piping systems and mechanical works, for example) actually required the GS E&C Communications Team to support the RFCC Pre-Comm-Comm Cilacap Project. work tasks and maintenance; Permit system, Safety Talk (TBM),IBPR/HHIRA,Safety Report, maintenance safety awareness campaign,Advice-Monitor-Responsibility goal of zero accidents,Observation and Intervention Optimization, Excellent Close Finding, andWaste Management

    • Safety Man
      • Jan 2015 - Apr 2015

      EstuMaju Group Cilacap has hired a safety man for work cleaning sewers and striping gravel at Pertamina RU IV Cilacap's units FOC II and LOC II. Make certain that the CSMS score is not reduced. EstuMaju Group Cilacap has hired a safety man for work cleaning sewers and striping gravel at Pertamina RU IV Cilacap's units FOC II and LOC II. Make certain that the CSMS score is not reduced.

    • Safety Officer
      • Nov 2014 - Dec 2014

      Scoupe Project Mechanical and Electrical at PT. HM. Sampoerna Sukorejo-Pandaan-Pasuruan Detail: Upgrade the HLP machine. Always coordinate with the EHS team, PT HMS, and team supervision pilot plan with the goal of zero accidents before work, during work, and for workers returning home. Ensure the permit system is running well and is always measurable. In the work area, ensure "Salam Lima Jari" [Mission Zero] is understood by all workers. Dedicated to making different Scoupe Project Mechanical and Electrical at PT. HM. Sampoerna Sukorejo-Pandaan-Pasuruan Detail: Upgrade the HLP machine. Always coordinate with the EHS team, PT HMS, and team supervision pilot plan with the goal of zero accidents before work, during work, and for workers returning home. Ensure the permit system is running well and is always measurable. In the work area, ensure "Salam Lima Jari" [Mission Zero] is understood by all workers. Dedicated to making different

    • Oil and Gas
    • 1 - 100 Employee
    • Safety Man
      • Sep 2014 - Nov 2014

      Safety Man di PT. Pertamina RU IV Cilacap pada Turn Around (TA) Kilang II Tahun 2014 [15 Sept'14 s/d 01 Nov'14] ; lokasi kerja di Area Utilities 05 / 50. Dan tergabung dg PT. Cahaya Turangga Sakti (CTS) - KOPAMA Pertamina RU IV Cilacap.Dengan tugas dan tanggung jawab sbb : - Melakukan identifikasi bahaya pekerjaan yang akan diawasi (ikut melakukan review HSE Plan Kontraktor (JSA & KPI) - Memastikan APD sudah tersedia dan standar sebelum bekerja serta memastikan semua pekerja telah memakai APD sesuai pekerjaannya (Melaksanakan Intervensi APD) - Memastikan peralatan Kerja yang digunakan sudah standar (melakukan inspeksi) / Memeriksa kelaikan Peralatan / Tangging Peralatan. - Memastikan permit system telah tersedia ditempat kerja dan persyaratan yang tertuang didalamnya telah dipenuhi (safety precaution). - Memberikan pelatihan kepada pekerja (melalui safety talk) - Membuat laporan kejadian, aktifitas HSE dan pelanggaran yang dilakukan pekerja serta melaporkan kepada pimpinan dan HSE RU IV. - Memeriksa Mitigasi/Pengendalian yang tertuang dalam JSA sudah dilaksanakan. - Memastikan Tool Box Meeting dilakukan setiap hari. Show less

    • Safety Man
      • Jun 2014 - Sep 2014

      Merupakan Sub-con dari PT. Adhi Karya, dengan scope pekerjaan Fabrikasi & Instalasi Pipa GRP (Bondstrand Pipe) untk area 154 [Polysher] di RFCC Project-Cilacap ; - Bersama tim mengikuti general safety talk dgn kordinator safety PT. AK - Mengadakan Tool Box Meeting di area kerja - Sosialisasi JSA bagi semua pekerja - Menyiapkan serta melaporkan (safety report) - Melakukan inspeksi alat-lokasi-activity - Memberikan Safety Advice dan Up Skill - Melakukan pengamatan & kontrol thd SIKA,PEKA - HIRA meeting - Development and implementation of PEKA - Safety coordination meeting Show less

    • Indonesia
    • Construction
    • 700 & Above Employee
    • Safety Man
      • Feb 2014 - May 2014

      Scope Pekerjaan Sipil( Pembuatan Gedung Laboratorium RU IV Cilacap, di Area 30 GD3 ) ; - Selalu berkoordinasi dg koordinator safety ADHI KARYA. - Mengadakan Tool Box Meeting di area kerja - Sosialisasi JSA bagi semua pekerja - Menyiapkan serta melaporkan (safety report) - Melakukan inspeksi alat-lokasi-activity - Memberikan Safety Advice dan Up Skill - Melakukan pengamatan & kontrol thd SIKA,PEKA - HIRA meeting - Development and implementation of PEKA - Safety coordination meeting Show less

    • Safety Man
      • Dec 2012 - Nov 2013
    • Indonesia
    • Construction
    • 1 - 100 Employee
    • Safety Officer
      • Nov 2011 - Oct 2012
    • Assisten Supervisor
      • Aug 2009 - Feb 2010
    • Pengawas Bangunan
      • Oct 2008 - Feb 2009
    • Pelaksana Bangunan
      • Mar 2005 - Aug 2008
    • Freelance IT Support
      • 2003 - 2006

Education

  • Muhammadiyah University of Yogyakarta
    Sarjana Teknik, Teknik Sipil

Community

You need to have a working account to view this content. Click here to join now