Rogelio Pacayra
Senior Building Services coordinator at GAMMON CONSTRUCTION LTD- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
GAMMON CONSTRUCTION LTD
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Senior Building Services coordinator
-
Apr 2013 - Present
-
-
-
Leighton Asia
-
Hong Kong
-
Construction
-
700 & Above Employee
-
Sr. Building Services Coordinator
-
Mar 2013 - Jun 2016
.INVOLVE IN DESIGN MODIFICATION AND COORDINATE WITH DISCIPLINE ENGINEER, IN ORDER TO MAKE SURE THAT THE CAD GENERATED DRAWING WILL SUITE THE ACTUAL CONSTRUCTION SITE REQUIREMENTS AND IN CASE OF CRITICAL CLEARANCES, AN ACTUAL SITE MEASUREMENT HAD TO BE CONDUCTED.INCHARGE OF CAD GENERATED CSD/CISD AND DETAIL DRAWINGS INTENDED FOR MATERIAL PROCUREMENT AND INSTALLATION.TO MAKE SURE THAT THE DRAWING CONFORM THE CAD MANUAL AND GENERAL DESIGN SPECIFICATION. COORDINATE WITH THE SUBCONTRUCTOR PRIOR TO COMBINED SERVICES DRAWING DEVELOPMENT.RESOLVE PROBLEMS THAT ARISE DURING CONSTRUCTION AND INSTALLATION ACTIVITIES ALIGNED WITH MEP CONSTRUCTION SCHEDULE & REQUIREMENT.
-
-
-
Gammon Construction Limited
-
Hong Kong
-
Construction
-
700 & Above Employee
-
Sr. Building services Coordinator
-
Apr 2010 - Mar 2013
INVOLVE IN DESIGN MODIFICATION AND COORDINATE WITH DISCIPLINE ENGINEER, IN ORDER TO MAKE SURE THAT THE CAD GENERATED DRAWING WILL SUITE THE ACTUAL CONSTRUCTION SITE REQUIREMENTS AND IN CASE OF CRITICAL CLEARANCES, AN ACTUAL SITE MEASUREMENT HAD TO BE CONDUCTED.INCHARGE OF CAD GENERATED CSD/CISD AND DETAIL DRAWINGS INTENDED FOR MATERIAL PROCUREMENT AND INSTALLATION.TO MAKE SURE THAT THE DRAWING CONFORM THE CAD MANUAL AND GENERAL DESIGN SPECIFICATION. COORDINATE WITH THE SUBCONTRUCTOR CLARIFY DETAILS WITH THE DESIGN CONSULTANTS PRIOR TO MEP CONSTRUCTION MANAGEMENT.COORDINATE AND ENSURE THAT ALL CONSTRUCTION AND INSTALLATION ACTIVITIES COMPLY WITH THE APPROVED DRAWINGS.RESOLVE PROBLEMS THAT ARISE DURING CONSTRUCTION AND INSTALLATION ACTIVITIES IN ALIGNED WITH MEP CONSTRUCTION MANAGEMENT.ASSIST IN THE COORDINATION AND PREPARATION OF THE COMBINED SERVICES AND COMBINED BUILDER’S WORK DRAWING WITH SUB-CONTRACTOR UNDERSTAND THE TECHNICAL ELEMENTS OF EACH SERVICE. IDENTIFY KEY DESIGN AND DELIVERY ISSUES OR RISKS, AND REVIEWS WITH MEP CONSTRUCTION MANAGER.DESIGN EVALUATION & MODIFICATION PRIOR TO MODULAR DESIGN AND PRODUCTION
-
-
-
Shinryo Corporation
-
Japan
-
Specialty Trade Contractors
-
200 - 300 Employee
-
Sr. Project Coordinator
-
Jul 2009 - Mar 2010
INVOLVE IN DESIGN MODIFICATION AND COORDINATE WITH DISCIPLINE ENGINEER, IN ORDER TO MAKE SURE THAT THE CAD GENERATED DRAWING WILL SUITE THE ACTUAL CONSTRUCTION SITE REQUIREMENTS AND IN CASE OF CRITICAL CLEARANCES, AN ACTUAL SITE MEASUREMENT HAD TO BE CONDUCTED.INVOLVE IN DESIGN MODIFICATION AND COORDINATE WITH DISCIPLINE ENGINEER, IN ORDER TO MAKE SURE THAT THE CAD GENERATED DRAWING WILL SUITE THE ACTUAL CONSTRUCTION SITE REQUIREMENTS AND IN CASE OF CRITICAL CLEARANCES, AN ACTUAL SITE MEASUREMENT HAD TO BE CONDUCTED.INCHARGE OF CAD GENERATED CSD/CISD AND DETAIL DRAWINGS INTENDED FOR MATERIAL PROCUREMENT AND INSTALLATION.TO MAKE SURE THAT THE DRAWING CONFORM THE CAD MANUAL AND GENERAL DESIGN SPECIFICATION. COORDINATE AND ENSURE THAT ALL CONSTRUCTION AND INSTALLATION ACTIVITIES COMPLY WITH THE APPROVED DRAWINGS.
-
-
-
-
MEP CSD COORDINATOR
-
Feb 2008 - Jun 2009
INVOLVE IN DESIGN MODIFICATION AND COORDINATE WITH DISCIPLINE ENGINEER, IN ORDER TO MAKE SURE THAT THE CAD GENERATED DRAWING WILL SUITE THE ACTUAL CONSTRUCTION SITE REQUIREMENTS AND IN CASE OF CRITICAL CLEARANCES, AN ACTUAL SITE MEASUREMENT HAD TO BE CONDUCTED.INCHARGE OF CAD GENERATED CSD/CISD AND DETAIL DRAWINGS.TO CONFORM THE CAD MANUAL AND GENERAL DESIGN SPECIFICATION.
-
-
-
-
DRAFTSMAN/ENGINEERING ASSISTANT/COODINATOR
-
Mar 1995 - Feb 2008
IT IS IN BELOW MENTIONED PROJECTS THAT INSTALLATION DRAWINGS OF DUCTILE IRON PIPE, BLACK STEEL PIPES, VALVES & ACCESSORIES OF SIZES RANGING FROM 150d UP TO 2000d ARE PRODUCED WITH HIGH ACCURACY AND WITH CLOSE COORDINATION WITH RESPECTIVE ENGINEERS PRIOR TO INSTALLATION IN A SPACE OF LIMITED AREA AND HEAD ROOM.PROJECTS AS FOLLOWS:HONGKONG CONVENTION AND EXHIBITION CENTER, MVAC CENTRAL A/C PLANT ROOM SEA WATER COOLING SYSTEM PROJECT. CONTRACT 501 MTRC LANTAU RAILWAY PROJECT CENTRAL A/C PLANT ROOMSEA WATER COOLING SYTEM PROJECTCONTRACT 680 MTRC NORTH POINT STATION PROJECTCONTRACT 653 656 MTRC TSEUNG KWAN O RAIL WAY PROJECT, TRACK TUNNELCOMBINED MEP SERVICES DRAWING. NORTHERN SIDE BASEMENT CENTRAL CHILLER PLANT 11 CHATTER ROAD EXCHANGE SQUARE CHILLER PLANT REHABILITATION NOVOTEL FOUR SEASONS HOTEL, MVAC-AIR AND WATER SIDE SYSTEM INSTALLATION PROJECT ROUTE 8 TUNNEL VENTILATION
-
-
-
-
DESIGN DRAFTSMAN
-
Dec 1994 - Sep 1995
-
-
-
-
MECHANICAL PIPING DRAFTSMAN
-
Oct 1991 - May 1993
-
-
-
-
DRAFTSMAN ESTIMATOR
-
Dec 1988 - Sep 1991
-
-
-
-
DRAFTSMAN ESTIMATOR
-
Apr 1988 - Dec 1988
-
-
Draftsman
-
Sep 1986 - Mar 1988
-
-
-
-
Draftsman
-
Aug 1984 - May 1986
-
-
-
-
Draftsman
-
Sep 1983 - Aug 1984
-
-
Draftsman
-
Sep 1981 - Sep 1983
-
-
DRAFTSMAN
-
Sep 1981 - Sep 1983
-
-
Draftsman
-
Dec 1980 - Sep 1981
-
-
Education
-
Technological Institute of the Philippines
Bachelor's degree, Mechanical Engineering -
Technological University of the Philippines
Certificate of proficiency, Drafting technology