Rogelio Omila

Site Engineer at Mohammad Al-Mojil Group MMG
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE
Languages
  • English Native or bilingual proficiency
  • Tagalog Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Cert of att.f.fire safety prev.suppr.&cont.sem.,Cert.of attd. f.hazd.com.a healthy resp.sem.,Cert.f attend. f. job safety analysis,Cert.f. recog. of 10m.man-hrs.w/out LTI, Cert.of saf. contri.f. 8m.man hrs.w/out LTI&Cert.of exc.fluke pred.maint.sem.
    -

Experience

    • Saudi Arabia
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Apr 2008 - Present

    • Electrical Engineer
      • Apr 2008 - May 2015

      Supervision of Electrical&Instrumetation Installation,Cost estimates for change order,Materials quantity takeoff, To prepared electrical method statements,to prepared test package and to coordinate to the client for field problems. Supervision of Electrical&Instrumetation Installation,Cost estimates for change order,Materials quantity takeoff, To prepared electrical method statements,to prepared test package and to coordinate to the client for field problems.

    • Construction
    • 400 - 500 Employee
    • Field Engineer
      • 2008 - 2013

      Directly responsible for the supervision of electrical & instrumentation installations, cost estimates, quantity surveyors, material quantity take off, cost for change order, coordinate to the client for field problems, as built drawing, documentation for test package & loop checking, preparation of materials for the project, method statements and field support in the project for implementation. Directly responsible for the supervision of electrical & instrumentation installations, cost estimates, quantity surveyors, material quantity take off, cost for change order, coordinate to the client for field problems, as built drawing, documentation for test package & loop checking, preparation of materials for the project, method statements and field support in the project for implementation.

    • Electrical and Instrumentation Engineer
      • 2006 - Apr 2008

      - Cost and quantity estimation (pricing and tendering of electrical and instrumentation system). - Supervising for Installation of Earthling for motors, Substation and all types of Electrical panels - Supervising of Installation of Cable Tray, Cable Ducts, Cable Trenches, Cable conducting and Direct Cable Laying. - Inspection all Electrical works such as Cable gland, Cable installation for trenching, Cable conducting, switching, Installation for MCC, MCCB, Breaker, lighting poles with photo cells, cable tray, grounding system and junction boxes. - To inspect materials submittal from the subcontractor. - Supervising of Electrical Installation for high Rise building. - Installation of Street Lighting oles and all plants lighting System with all type of photo cells. - Responsible for the installation of medium voltage and high voltage electrical equipment and devices. - Responsible for all electrical aspects of construction coordinate with quality engineering works adherence to the technical specification. - Responsible for construction shop drawing preparation for the high and low voltage system. - promote safety on site by complying working men to wear safety gears. - Prepared detailed shop drawing, details plan, materials takeoff, and manpower scheduling. Show less

    • Electrical Engineer
      • 2005 - 2006

      - To monitor ongoing work to ensure the equipment and materials are approved by proponent. - Responsible for modification of electrical installation and coordination of the materials needed in the site. - Prepare request for client inspection on completed works after having an internal inspection. - Supervised for Installation of New grounding system and extend to existing ground of MCC at end of line up to the substation ground. - To inspect various equipment used in the plant to ensure smooth and efficient operation and various out trouble shooting with guidelines provided for. - Supervised Control panel wiring terminating, Installation and terminations of instrument cables and junction box, devices @ MCC interposing relays panel, MOV shutdown and terminating jobs, electrical panel works conducting routing. - Conducts testing in electrical testing power cables switchgears motors and voltage tester, switching of electrical feeders and UPS system by following laid down procedures. - Assist contractor to conduct electrical testing and commissioning activities, prepares daily routine schedule for manpower utilization as well as materials, tools and equipment. - Supervised job site personnel in the implementation of work. Show less

    • Electrical Inspector/Site Engineer
      • 2003 - 2004

      - Prepare cost estimates and materials take off for the proposed project.- Preparation of quotation for bidding.- Submit daily and weekly accomplishment reports to maintain volume of work.- Supervision during the execution of the project.- Supervised men in cable termination at the panel boards.- Installation of electrical motors control panel board fitting instrument.- Assist contractor to conduct electrical testing and commissioning activities.- Supervised in the installation of lighting arrester, watt hour meter and to distribution transformer. Show less

    • Electrical Site Engineer
      • 2002 - 2003

      - Perform shop drawings and submit to the consultants for comments an approval.- Preparation of scheduling for manpower.- Supervised in the installation of grounding rods for meters.- Supervised in installation of lighting fixtures and water pump motor controllers and safety protection devices.- Installation of conduit pipes, lighting fixtures and outlets.- Responsibilities of Reading Schematic Diagram.- Installation of Electrical Pipes, Switch Gears, Control Board, Control panel & other Electrical devices.- Installation of Power Lighting.- Preventative Maintenance of Substation, Battery and Generators.- Preventative Maintenance of Motor.- Trouble Shooting of Motor Control Center (MCC'S)- Preventative Maintenance of Lighting.- Energize & De-Energize of MCC.- Cable Pulling, Termination of Wires and Cable to Motor.- Installation of Electrical Conduit Piping such as PVC & RCS. Show less

    • Electrical Supervisor
      • 2001 - 2001

      - Maintain a record of field mark up drawing so as to avoid the mismatch during final as built preparation. - Prepare daily report / weekly reports for the progress of works. - Inspect earthling bar, earthling rod, earthling pit, equipment grounding, enclose grounding, air terminal and lighting arrester. - To monitor the materials submitted to the subcontractor if that is as per specication. - and maintenance of all types of instrument and electrical works. - Supervised in maintenance of motor controllers low, medium, and high voltage, switchgears, lighting fire alarms system and substation panel board. - Assist contractor to conduct electrical testing and commissioning. - Prepared daily routine schedules for manpower utilization as well as materials and equipment. - Supervised for the erection of structural substation and electrical equipment. Show less

    • Electrical Supervisor / Quantity Surveyors
      • 2000 - 2001

      - Supervised in installation of lighting fixture, water pump motor control safety maintenance records for inspection, measuring and test equipment protection device. - Monitor progress of work and other electrical installation and facilities. - Estimating on materials cost and materials quantity and estimating labor cost. - Develop the project implementation strategy for machine and electrical equipment set up. - Address project issues from installation punch list and completion of the project. - Perform daily maintenance repair and check up on all electrical and mechanical equipments. Show less

    • Electrical Supervisor / Estimator
      • 1999 - 1999

      - Electrical works from high tension to low current such as cable gland and termination motor panel board fitting switchgear maintenance installation, commissioning and maintenance of power lighting. - Control panel wiring terminating, instrument pipe fitting and terminating jobs, electrical panel works conducting cable routing. - Installing electrical motors, control panel board fitting, instrument cable pulling and cable junction box termination. - Conduct testing in electrical testing power. Show less

    • Electrical Supervisor / Estimator
      • 1998 - 1999

      - Follow the prior to the schedule of quality assurance and quality inspection.- Installing electrical motors, control panel board fitting and cable junction box termination.- Supervising installation of cathodic protection and grounding system of the plant.- Control panel wiring termination, instrument pipe fitting and terminating jobs, electrical panel works conducting cable routing.- Installing electrical motors, control panel board fitting, instrument cable pulling and cable junction box termination.- Conduct testing in electrical testing power. Show less

    • Electrical Supervisor / Estimator
      • 1997 - 1998

      - Prepare cost estimates and material takes off for the propose project.- Preparation of quotation for bidding.- Performed shop drawings and submit it to the consultants for comments and approval.- Supervised men in cable termination at panel boards, distribution centers and motors controllers panel boards.- Installing electrical motors, control panel board fitting, instrument junction, box fitting conducting to motor cable\ pulling through ground instrument cable pulling and cable junction box. Show less

  • P.I.S Plastic Plant
    • Region XI - Davao, Philippines
    • Maintenance Plant Supervisor
      • 1995 - 1996

      - Supervised of all Machines, such as Blown Film Extruder Machines, Recycling Machines ,Printing Plastic Machines, Roping Machines Scheduling of Manpower and Production reports. - Perform all Electrical Work to high voltage to low voltage such as Cable Glanding and Termination Motor Panel Board. - Install and repair Power Supply Panel Board, Lighting Fixtures, Utility Boxes, Power Cable Layout and Termination to Circuit Breaker & Contactor. - Regularly checks conditions of power distribution facilities, motor drives control and accessory for area covered, efficiency of cooling system, drive loads and temperature that required operating condition. - Ensure that all electrical works must be carried out as per plant specification Show less

  • Municipality of Panabo, Davao
    • Panabo City, Davao, Philippines
    • Electrical Inspector
      • 1993 - 1994

      - Monitoring and Inspection of all Building , Housing and Industrial for Electrical Installation and to Coordinated the private Power Plants and to Supervised Municipal Electrician. - Monitoring and Inspection of all Building , Housing and Industrial for Electrical Installation and to Coordinated the private Power Plants and to Supervised Municipal Electrician.

  • ARC-MEN Plastic lant Industry INC.
    • Panabo City, Davao, Philippines
    • Quality Control / Maintenance Plant Supervisor
      • 1992 - 1993

      - As a Quality Control to Monitored all Plastic Plant Operator and Production Defected and to Check Quality and Quantity for Packaging Department and to Segregated all Sealing Defected and also to Check Daily Reports. - As a Plant Maintenance Supervisor , Supervised to Trouble Shoot Electrical Inline Machines Controls and all Distribution Controls, all Power Outlets and Lighting. Supervised also to Dismantled and Cleaning of all Machines Such as Extruder, Bagging, Footsealing , Recycling and Printing Machines. - Promote safety on site by complying working men to wear safety gears. - Prepared detailed shop drawing, details plan, materials takeoff, and manpower scheduling. - Perform Inspection and Cable Splicing. - Conduit Insulation, Bending and Threading. - Repairing of all Electrical Equipment, Substation Control Room and all Electrical Work. - Perform all Electrical Work to high voltage to low voltage such as Cable Glanding and Termination Motor Panel Board. - Install and repair Power Supply Panel Board, Lighting Fixtures, Utility Boxes, Power Cable Layout and Termination to Circuit Breaker & Contactor. Show less

Education

  • University of Mindanao
    Bachelor of Science (B.S.), Electrical Enegineering

Community

You need to have a working account to view this content. Click here to join now