Rodrigue Abou Dib

Corporate Head of Planning and Controls Department at BUTEC
  • Claim this Profile
Contact Information
Location
Qatar, QA
Languages
  • Arabic Native or bilingual proficiency
  • English Full professional proficiency
  • French Limited working proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Lean Six Sigma Green Belt
    6sigmastudy - The global certification body for six sigma certifications
    Jan, 2021
    - Sep, 2024
  • PRINCE2® Foundation Certification
    PeopleCert
    Jan, 2021
    - Sep, 2024
  • PMI Risk Management Professional (PMI-RMP)
    Project Management Institute
    Aug, 2021
    - Sep, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Apr, 2021
    - Sep, 2024
  • PRINCE2® Practitioner
    PeopleCert
    Mar, 2021
    - Sep, 2024

Experience

    • Construction
    • 400 - 500 Employee
    • Corporate Head of Planning and Controls Department
      • Jan 2022 - Present

      Setting the strategy for Planning & Controls and delivering services that exceed client expectations. In charge of ensuring that the people, systems, and processes are in place to provide effective planning & controls function that delivers on target, is efficient, focused, customer-oriented, and accountable.RESPONSIBILITIES•Managing a team of professionals across five countries and defining the roles and responsibilities of each individual based on a strategic approach.•Develop and implement a planning and control management execution plan that incorporates all necessary processes and procedures.•Promoting, developing, and improving the Integrated Management System (IMS)•Develop a culture that instills and enhances the company's core values.•Manage and develop our in-house talent, ensuring that individual competencies are measured and developed as necessary. Show less

    • Commercial Manager
      • Dec 2020 - Mar 2022

      PROJECT: Procurement, installation, and testing, and commissioning as necessary for the execution of the works for eleven facilities which include aircraft hangars, administration & operation building, and several industrial facilities of which build-up area of 91,808 m2.Main Tasks:•Managing a team of fifteen members (3 Procurement Officers, 1 Senior Contract Administrator, 2 Cost Control Engineers, 3 Planning Engineer, 3 Quantity Surveyors, and 3 Accountants).•Finalization of Project’s baseline.•Supervision, control, and coordination of all activities related to Facilities Overall Planning and Progress measurement & reporting, aiming at completion of the Work within the assigned duration.•Managing all changes, costs, and schedules related to project works ensuring proper documentation and processing of claims and change requests.•Administration and control of the project’s budget.•Administration of contract and subcontract correspondences Show less

    • Commercial Manager
      • Sep 2019 - Nov 2020

      PROJECT: Development of 40,000m2 of land in the desert of Hassi-Barrouda, Timimoun in Algeria. Scope includes EPC, coordination, construction, testing, and commissioning of 25 buildings of the EPCC2 facility. The scope also involves infrastructure development works within the plot limit, such as roads, parking, paved areas, landscape works, signage, etc. Construction of 25 various buildings for Accommodation camp, Military Camp and Headquarters. The project includes 20,000 m3 of concrete, 4,000 Tons of LGS structuresin this role I was:• Managing a team of ten members (2 Procurement Officers, 1 Contract Administrator, 1 Controls Engineer, 1 Planning Engineer, 2 Quantity Surveyors, 1 Cost Controller, and 2 Accountants).• Supervising, controlling, and coordinating all activities related to the Surface Facilities Project, Overall Planning, and Progress measurement, aiming at completion of the Work within the assigned duration.• Preparing and maintaining the planning of all Surface Facilities activities in close collaboration with GTIM’s Planning Leader for other Groupement’s activities• Managing all changes, costs, and schedules related to project works ensuring proper documentation and processing of claims and change requests.• Successfully preparing and finalizing extension of time claims using Time Impact Analysis and securing its Time-Related Costs. Show less

    • Project Controls Manager
      • Jun 2014 - Sep 2019

      PROJECT: Design & Build LEED GOLD Contract for Tech 4 Building at Qatar Science and Technology Park (QSTP) USD60 Million EPC, coordination, development, installation, testing and commissioning of the TECH4 facility with internal mezzanine floors, workshops and offices. The scope also involve infrastructure development works within the plot limit, such as roads, parking, paved areas, landscape works, signage, etc In this role, I efficiently managed a team of 4, coordinated more than 15 Contractors and Subcontractors; established cost and resource loaded project baseline and continuously monitored progress against it. I monitored project progress and status to update plans and issued status reports as well as managed all changes, costs and schedules related to project works ensuring proper documentation and processing of claims and change requests. I also scheduled and chaired routine Planning and Commercial meetings and communicated on project issues as well as monitored allocation and utilization of resources to ensure completion of project packages within time frame and budget. Notable achievements include: • Successfully negotiated and finalized an Eighteen Months extension of time on a Twenty month Project through strategic thinking, effective communication and proper networking. • Contributed in improving the project margin by 8% by freeing the Contractor from any liability for certain major events. • Successfully established, implemented and utilized various Project Control systems Show less

    • Planning Consultant
      • Aug 2018 - May 2019

      PROJECT: Design, Supply, Installation, Testing and Commissioning, Operation, and Comprehensive Maintenance of a Treated Sewage Effluent (TSE) polishing plant using the Reverse Osmosis (RO) technology of a maximum capacity of 15,000 m3/day at ASPIRE Zone In this role, I was responsible for conducting a forensic delay analysis by: 1) Developing and submitting a fully comprehensive delay report using APAB – As-Built critical path analysis. 2) Developing and submitting a fully detailed quantum based on the periods of critical delay securing fair compensation for the JV. Show less

    • Project Controls Manager / Commercial Manager
      • Apr 2017 - Mar 2018

      PROJECT: CP07B - Lusail Plaza - Infrastructure Works, LRT Station, Public Car Park & Landscape US$74 Million Construction of an underground highway 60m wide and 27 m deep in the new city of Lusail. The project includes 150,000 m3 of concrete and expected completion in a 10-month period. As Project Controls Manager / Commercial Manager I am assigned to a new project in tandem with below project: managing a team of 8 members (1 Procurement Coordinator, 1 Contract Administrator, 1 Controls Engineer, 1 Senior Planning Engineer, 2 Quantity Surveyors and 2 Reporting Engineer); I prepare and submit project procurement activities including material submittals, and monitoring, material orders and delivery. I also monitor project progress and status to update plans and issuing reports and updates to stakeholders including correspondences with the client and the supply chain providers. Show less

    • Task Coordinator and Factual Witness
      • Jan 2014 - Nov 2016

      Arbitration (Confidential)

    • Senior Planning and Cost Control Engineer
      • Feb 2012 - Mar 2014

      PROJECTDesign & Build Contract for CP69 Perimeter Security Systems Enhancement at Hamad International Airport (HIA) US$ 55 MillionEPC, Start-up and commissioning of all elements of the perimeter security systems enhancement (PSSE) for Hamad International Airport (HIA). The works included but were not limited to engineering, procurement, installation, testing and commissioning of 30 Km of security fences, 45 Km of Electrical and telecommunication duct banks, eight substations, four access control points, 1400 light poles, 8 Km of roadworks, 3000 bollards, 16 Radars, etc.In this role, I collected and prepared a Measured Mile Analysis; developed and concluded the as built critical path of the project, evaluated Disruption using several models, such as, measured mile and Picavance; and evaluated project delays using forensic methods i.e. Time impact analysis, As planned Vs As Built. I also meticulously collected and updated the resources logs, prepared and updated the Claim Quantum and evaluated project’s workforce productivities.Notable accomplishments included:• Negotiated and concluded the Final Account for 11 Subcontractors and successfully Negotiated Budget savings of an amount equivalent to 2.3 Million QAR.• Successfully planned the assigned scope of work interfacing with up to 15 other construction packages.• Successfully prepared and communicated an effective mitigation plan accelerating works and recovering delay of 2 months achieved a mandatory finish date at the end of November 2012 facilitating the opening of Phase 1 of NDIA on 12 December 2012 Show less

    • Planning and Cost Control Engineer
      • Mar 2011 - Jan 2012

      PROJECTDesign & Build Contract for CP69 Perimeter Security Systems Enhancement at Hamad International Airport (HIA) In this role I developed and maintained detailed product schedules; ensured adherence to quality standards such a Total Quality Management or Six Sigma by ensuring employees follow quality standards and by using quality control checklists; and coordination and regulating various meetings such as project progress review meetings, quality circles.Remarkable accomplishments included:• Secured an approval from the Engineer for the Contract Master Schedule.• Secured an approval from the engineer for a mitigation plan showing carefully studied fast-tracked activities Show less

    • Project Controls Engineer
      • Mar 2009 - Feb 2011

      Project: Build remeasured Contract for Qatar power transmission system, Expansion Phase VIII substations USD 20 MillionEPC, site delivery, testing and commissioning for the new 66/11 KV transformer feeders and GIS substations for Kahramaa. I developed and maintained detailed product schedules; ensured adherence to quality standards such a Total Quality Management or Six Sigma by ensuring employees follow quality standards and by using quality control checklists. I coordinated and regulated various meetings such as project review meetings, quality circles. Show less

    • Procurement and Construction Coordinator
      • Sep 2008 - Feb 2009

      Project: Build remeasured Contract for Qatar power transmission system, Expansion Phase VIII substations. USD 20 MillionI prepared and submitted project material submittals, and monitored, tracked material orders and delivery; assessed subcontractors’ invoices and prepared interim monthly statements. I also prepared daily, weekly and monthly reports

    • Lebanon
    • Paper and Forest Product Manufacturing
    • 1 - 100 Employee
    • Mechanical Process Engineer (Trainee)
      • Jul 2007 - Aug 2008

      In this role, I designed / drew with Autocad (2D & 3 D) different mechanical parts related to tissue and cardboard machines; supervised workshop jobs (metal fabrication, milling machine, lathe and welding), monitored and reported the installation process of pulpers and piping supply systems for tissue putty (Contractor ASTUCE Singapore, 4-month duration). I designed and implemented the upgrade for the printing system of the cardboard machine (final year project). In this role, I designed / drew with Autocad (2D & 3 D) different mechanical parts related to tissue and cardboard machines; supervised workshop jobs (metal fabrication, milling machine, lathe and welding), monitored and reported the installation process of pulpers and piping supply systems for tissue putty (Contractor ASTUCE Singapore, 4-month duration). I designed and implemented the upgrade for the printing system of the cardboard machine (final year project).

Education

  • Lebanese University - faculty of Engineering II
    Master’s Degree, Mechanical Engineering
    2003 - 2008

Community

You need to have a working account to view this content. Click here to join now