Rodrigo Galina

Technical Manager at AMBIO
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rio de Janeiro, Rio de Janeiro, Brazil, BR
Languages
  • Português Native or bilingual proficiency
  • Inglês Native or bilingual proficiency
  • Espanhol Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

José Fernandes

Tive o privilégio de trabalhar com o Engº Rodrigo ,na execução da Obra de Ampliação da Subestação SE Quinta / CEEE pela empresa Toshiba . Como colega de trabalho, ele é uma pessoa muito agradável , com uma postura sempre íntegra , leal e sincera. De uma pró-atividade tamanha, que é um exemplo de competência, tendo como trunfo sua vasta experiência em Gestão de Obras.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CMVP - Certified Measurement & Verification Professional (CMVP) Program
    The Association of Energy Engineers® (AEE®) DELHI
    Aug, 2020
    - Nov, 2024
  • Black Belt - Certificado implementado na VOLKSWAGEN
    Pontifícia Universidade Católica do Paraná
  • Certificado de Eficiência Energética Global - Certificado de Especialista
    GCE Group (Energy efficiency)

Experience

    • Brazil
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Technical Manager
      • Feb 2018 - Present

      Responsibility by Engineering Department, it comprise in five sectors as Contract Management, Diagnostics, Projects, Infrastructure, and IT. Managing house´s portfolio, focused in green brazilian federal government programs through ANEEL (National Electric Energy Agency) public notices. Adapted the enterprise, previously purely environmental, for energy area, specifically in energy efficiency. After board investments, trained new teams, improving procedures and technical knowledge, redistributing power through ownership sense. Billing improvement from USD 150k/year to USD 3M/year in five years. Show less

    • COO
      • Feb 2017 - Jan 2018

      Microelectronics factory construction and star-up direction, reporting directly to the shareholder’s table. Transformed the business plan into a Value Stream to compose the necessary equipment. At China, made machinery acquisition, in a parallel Executive Projects issued. After 8 months, as factory already built and got in operation, defined the Key Process Indicators (KPIs) to productivity and quality control, focused on the Lean Six Sigma philosophy. Exported goods manufactured with cost of product sold (COGS) determinate. The factory management was consisting in two lines plus a quality laboratory: The first line uses cutting-edge machinery and labor, containing Surface Mount Technology (SMT), Oven, Pin Through Hole (PTH), Wave Machine, these all responsible for issuing the electronic driver and the led board circuit. The second line made up of the Manual Pre-Assembly sector, which feed the Automatic Assembly and the Aging machine. All designed in a Lean layout for reduced stock, with about 1600m² and 50 workers per shift. Show less

    • Business Consulting and Services
    • 1 - 100 Employee
    • Project Manager
      • May 2014 - Aug 2016

      As engineering manager of a department made up by a mixed team, with Russian and Brazilians engineers, I provided technical decision for heavy industries in Brazil, never before a month of immersion in each factory floor. Using ISO 50.001 and energy efficiency knowledge for actions in Chillers, Steam Boilers, Air Compressors, Extruders, Engines and Pumps, Hydraulic Presses, Ovens, Drying Tunnels, Conveyors, among others. In each project was mandatory a fully understand of productive logic in the branches consulted: Automotive, laminated wood production (MDF/MDP), weaving of plastic raffia, grains & oils, slaughterhouses, beverages, steel... Energy calculations in accordance with CMVP (International protocol) with energy indicator to each improvement. Operational corrections, adjustments in logic, saves from waste, machinery adaptation technological or a simple upgrade. In Volkswagen got a Black Belt from an action. Show less

    • United States
    • Electric Power Generation
    • 100 - 200 Employee
    • Engineer - Coordinator
      • Nov 2012 - May 2014

      Engineer with coordinator function, responsible for integrating sectors to guarantee the economic result in 230kV power substations expansion. As routine, through PMBOK practical use, issued physical progress and the respective economic projects statement reports, managing internal and external suppliers, maintaining the scope adhering to the contract. The works involved from electrical, civil, and mechanical executive projects presentation to client, market quotations, team’s field allocation, equipment acquisition conference with testing in factory (TAF) and on site (TAC), national logistics, negotiation responsibility limits, interaction with all back-office and field, ensuring operating margin. Were five works, all with bays expansion, insertion of circuit breakers, disconnectors, pedestal isolators, current and power transformers, protection and control panels, battery rooms, drainage systems, and regular civil bases, as well like cuttings and transmission towers. Show less

    • Brazil
    • Construction
    • 1 - 100 Employee
    • Technical Assistent III
      • Jan 2011 - Nov 2012

      Design Technician in projects, as part of São Francisco river transposition team, also revitalization works for all HSBC agencies in Brazil, and executive design for Latin American University (UNILA) in Foz do Iguaçu - PR, among others. I shared responsibility for dimensioning cabling, electrical protections, coordination and selectivity of loads, protection against atmospheric surges, grounding networks, emergency power systems with synchronous start. The São Francisco work consisted of preparing electrical power for remote and naturally aggressive areas for large drilling equipment (TBM), while works such as UNILA provided the range of electrical engineering knowledge, from grounding to automation and systems control. Show less

Education

  • Universidade Federal do Paraná
    Electrical Engineering, (Electrical, Electronics & Telecommunications)
    2006 - 2012
  • Pontifícia Universidade Católica do Paraná
    Post Graduate, LEAN SIX SIGMA c/ (BLACK BELT)
    2015 - 2016

Community

You need to have a working account to view this content. Click here to join now