Rodney Geoffrey

System Controller- POM GRID at PNG Power Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
NZ
Languages
  • English -
  • Pidgin -
  • Duna -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 300 - 400 Employee
    • System Controller- POM GRID
      • Apr 2018 - Present

      The four core functions of my day to day work includes but not limited to;1) Safety - At all times ensure safety of PNG Power personnel, General Public and PNG Power Equipment & Property are safeguarded by;1a) Disconnect and make safe section of the system so that work may be carried out.1b) The reconnection after completion of work.1c) The restoration of supply after an operational fault.2) Quality - Ensure adequacy of supply to satisfy demand by controlling and monitoring the quality of supply ( voltage & frequency). In doing so, Generations and Load demand at different times of the day are kept balanced to maintain the quality of supply.3) Economy - Minimize cost at all times. Depending on the rain falls, hydro stations are to be maximized and Thermal station to be utilized to meet the demands. 4) Security - Likelihood of interruption are to be minimized. Quick restoration and or loads transfer to other feeders within the system to minimize customers power outage. Show less

    • Acting Team Lead - System Controller POM Grid
      • Aug 2022 - Sep 2022

    • Oil and Gas
    • 700 & Above Employee
    • Fuel & waste Tech Coordinator
      • Apr 2017 - Apr 2018

      My role as a Fuel & Waste Tech Coordinator includes; 1) Oversee Fuel and Waste management, providing safe, efficient and controls compliant support to upstream entities including Hides, Komo Airfield, Angore and Wellpads. 2)Validate and sustain correct operating procedures and on the ground practices for Fuel Farm Operations, Fuel distribution, waste management collection and processing 3) Ensure full and complete reporting of activities including Fuel Reconciliation, routine KPI as well as other reports as required by Production Logistics 4) Support ExxonMobil PNG with forecasting waste management and fuel requirements. Order fuel and provide right sizing support as required 5) Tracking of non conformance of Sewage treatment plant , Person on board verses Effluent to ensure ExxonMobil comply with environment regulations 6) Ability to use and understand SAP software as a computerized maintenance tool; request maintenance work order/notification , do requisition of goods and services etc. 7) Knowledgeable in Field Fuel Systems and Waste Management Processing and handling system 8) Ensure ExxonMobil PNG Waste Management 3rd Party Contractor namely Total Waste Management Limited adhere and comply with ExxonMobil Standard and Procedures 9) Interface with 3rd party contractors namely Total Waste Management Limited and Hides Gas Development Company on behalf of ExxonMobil PNG 10) Do administrative duties including timesheet verifications for 3rd party contractor, invoice verification, verify and endorse Materials Consumables Request, etc. 11) Knowledgeable in applications ability ( SAP, PowerPoint, Excel) Show less

    • Oil and Gas
    • 700 & Above Employee
    • Electrical Engineering Intern
      • Dec 2015 - Feb 2016

      My assignment during the 3 months internship was to investigate the Load Shedding System of the PNG LNG Plant. Inside Electrical Control and Management System (ECMS) is the Load shedding system. I investigated how and why load shedding is activated. I also did some inventory controls for the Laptop used during construction phase of the project. Apart from work, I did some voluntary activities including delivering Christmas gifts to the Port Moresby General Hospital Children Ward. My assignment during the 3 months internship was to investigate the Load Shedding System of the PNG LNG Plant. Inside Electrical Control and Management System (ECMS) is the Load shedding system. I investigated how and why load shedding is activated. I also did some inventory controls for the Laptop used during construction phase of the project. Apart from work, I did some voluntary activities including delivering Christmas gifts to the Port Moresby General Hospital Children Ward.

    • Telecommunications
    • 700 & Above Employee
    • Trainee Engineer
      • Nov 2014 - Feb 2015

      Trainee Engineer working under the Power Department. Some of the jobs participated includes, site inspections, battery bank installations, gen sets installation and general conduct of work. Trainee Engineer working under the Power Department. Some of the jobs participated includes, site inspections, battery bank installations, gen sets installation and general conduct of work.

    • Oil and Gas
    • 700 & Above Employee
    • O & M Technician Trainee
      • Jun 2010 - Feb 2013

      Studied Foundation in Oil and Gas (O&M Technicians) at POTC operated by Exxon Mobil in June 2010 to December 2011. In all of 2012 I worked as a Logistics Coordinator for the PNG LNG Project. Studied Foundation in Oil and Gas (O&M Technicians) at POTC operated by Exxon Mobil in June 2010 to December 2011. In all of 2012 I worked as a Logistics Coordinator for the PNG LNG Project.

Education

  • PNG Power Training College
    HV Operating Authority - Class Two, Electrical
    2020 - 2020
  • Auckland University of Technology
    Bachelor of Technology - BTech, Electrical Engineering
    2013 - 2016
  • Production Operation Training Centre (POTC)
    Certificate, O & M Technician Trainee
    2010 - 2012

Community

You need to have a working account to view this content. Click here to join now