Rob Flynn (CRE) MCIOB

HS2 Senior Projects Manager at Cleshar
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Kingdom, UK
Languages
  • English Native or bilingual proficiency
  • Irish Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Peter Hastings

Having worked with Rob over a 4 year period, he has delivered some complex projects on NWR and LUL infrastructures. Rob demonstrated great leadership skills throughout his time at Portwest Construction Ltd, enhancing his teams through the project life cycle. On a management front Rob thrived on delivering all of our projects through a structured management system, while leading up all commercial aspects of the works with the client.

Rosanna Butters

Rob successfully delivered 20km of CRMS in some of the most complex areas of the underground. He and his team reprioritised the programme to meet the client's needs and produced timely and quality reports throughout the project, allowing the required dates and standards to be achieved.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • MCIOB
    The Chartered Institute of Building (CIOB)
    Aug, 2016
    - Oct, 2024
  • CDM 2015 Regulations
    Astutis Ltd
    Jun, 2016
    - Oct, 2024
  • Project Management Pgc.
    University of Hertfordshire
    Feb, 2015
    - Oct, 2024
  • Personal Track Safety
    Network Rail
    Aug, 2015
    - Oct, 2024
  • Member of The Association of Project Management
    Association for Project Management

Experience

    • United Kingdom
    • Construction
    • 100 - 200 Employee
    • HS2 Senior Projects Manager
      • Apr 2023 - Present

      Leading a framework delivery on HS2 for our client SCS / JV. The programme currently consists of the following schemes: HV / LV Installation / Diverting Schemes Deep Drainage Scheme Asset Conditional Surveys - Pre/Post Tunnel Boring Machines delivery. Environmental / Vegetation Schemes Track Rectification Schemes across the network Advance Access and Ventilation Scheme Leading a framework delivery on HS2 for our client SCS / JV. The programme currently consists of the following schemes: HV / LV Installation / Diverting Schemes Deep Drainage Scheme Asset Conditional Surveys - Pre/Post Tunnel Boring Machines delivery. Environmental / Vegetation Schemes Track Rectification Schemes across the network Advance Access and Ventilation Scheme

    • Ilford Depot - Senior Project Manager CRE
      • Feb 2019 - Mar 2023

      The planned changes to Ilford Depot and Sidings Yard formed part of the Improvement Plan to fulfil Greater Anglia’s new franchise commitments. GA replaced its entire fleet of trains by 2020 with the new Bombardier Aventra fleet. This new fleet will be serviced and maintained at Ilford Depot. The purpose of the upgrades was to ensure GA had suitable and sufficient facilities to be able to operate and maintain this new fleet of trains. As Senior Project Manger as was tasked with delivering the project through from GRIP4 to GRIP8.Ilford NEAT Infrastructure Works consisted of various work packages:WP 1 – Yard “Wash” and “Apron” Roads – increase in stabling capabilities and the installation of CET facility and fatality pit.WP 2 – Installation of CET facilities in the depot facility.WP 3 – Alteration to existing lifting facilities and installation of additional lifting facility for train roof-mounted equipment. E.g., HVAC moduleWP 4 – Bogie Drop facility on road 16 to service Class 720 trains.WP 5 – Installation of fixed access staging on four train examination roads in the depot, to provide safe access to train roofs and saloon doors. Depot Protection System integration on all new access gantries.WP 7 – Installation of a new track system in the facility to achieve a calibrated level track, road 14.WP 8 – Alterations to cab access platforms on several of the depots examination roads. WP 9 – Provision / alteration of CET mobile plant and equipment in the depot facility.https://lnkd.in/e3wK7sty Show less

    • TFL CRMS 13 - Project Manager
      • Oct 2018 - Feb 2019

      Transport for London Metropolitan Line CRMS SMA 13 Project. These works form part of the TFL’s Driverless Train’s Project which is set to become operational by 2020.The scope includes the installation of various cable route management systems which include OTX’s,UTX’s along with various containment systems along the route. The project requires meticulous planning and management while working with a live rail environment.

    • TFL CRMS 5 - Project Manager
      • Jan 2017 - Oct 2018

      Transport for London District Line CRMS SMA 5 Project. These works form part of the TFL’s Driverless Train’s Project which is set to become operational by 2020.The scope includes the installation of various cable route management systems which include OTX’s,UTX’s along with various containment systems along the route. The project requires meticulous planning and management while working with a live rail environment.

    • Strawberry Hill Depot - Project Manager CRE
      • Nov 2016 - Jan 2017

      Strawberry Hill Train Depot.Contract value £750,000.00.The scope consisted of extending 2 no existing roads within the depot including all associated ground works and P-way. Another aspect within the P-way package was the plain lining onto the main line including IBJ installation and removing the points.The M&E scope entailed lighting to the new roads along with upgrading areas within the existing depot as to comply with NWR Standards.

    • Manningtree AFA Scheme -Project Manager CRE
      • Jul 2015 - Oct 2016

      Manningtree AFA Scheme. Contract value £2,500,000.00.Responsible for all aspects of managing multi-discipline civil engineering project within the railway environment including overseeing site management staff and engineers, subcontractors including M&E, suppliers and forming strong relationships with Network Rail, Abellio Greater Anglia (Client) along with all major stakeholders involved in the project lifecycle. The scope included RC Lifts shafts, corridor links, and platform extensions along with all aspects of the M&E including installation of electrical lifts cars. Show less

    • Contracts Manager
      • Jan 2011 - Jul 2015

      Civil Engineering Company working within the Rail Sector.Previous Projects include Access For All Work's,Piling,Bridge Reconstruction,Platform Extensions,Drainage,Earthwork, Embankment Stabilisation including Soil Nailing and both Tunnel and Shaft installations. • Applying project management systems relating to tracking costs, critical success factors, program, earned value monitoring etc. • Project Leadership, leading teams to delivering their objectives and instilling our company's vision. • Monitoring Risk and Uncertainty through the project. • Stakeholder Analysis and Management. Show less

    • United Kingdom
    • Construction
    • Project Manager
      • Jul 2007 - Aug 2010

      Responsible for the successful delivery of various developments, ranging from commercial office blocks, multiplex cinema and residential housing including one off private dwelling’s and apartment blocks. • Project Management Inc. cost,program,risk,delivery and review. • Team management including mentoring and coaching. • Stakeholder management from tender to closure. • Supply Chain & Sub-contractor Procurement. • CDM coordinator. Responsible for the successful delivery of various developments, ranging from commercial office blocks, multiplex cinema and residential housing including one off private dwelling’s and apartment blocks. • Project Management Inc. cost,program,risk,delivery and review. • Team management including mentoring and coaching. • Stakeholder management from tender to closure. • Supply Chain & Sub-contractor Procurement. • CDM coordinator.

    • Managing Director
      • Jan 1995 - May 2007

      Flynn Furniture designed, manufactured and fitted high end furniture, both internal and external hard wood joinery including fit outs.As a company we had successfully maintained our position in the market place with several reoccurring clients based around the country. • Average annual turnover 2 million Euros • Implementing management structures to sustain and build the companies vision. • Supplied and fitted high end joinery including Danskin flooring to several large scale residential projects and exclusive hotels. • Continuous R&D with a strong will to succeed and keep ahead of the position. • Team leader,leading a 20 strong permanent team along with various sub-contractors to successfully deliver to our clients. Show less

Education

  • Institute of Chartered Builders
    MCIOB, Construction Management
    2015 - 2016
  • University of Hertfordshire
    Postgraduate Degree, Project Management
    2013 - 2015
  • Rice College,Co.Mayo,Ireland
    High School
    1983 - 1989

Community

You need to have a working account to view this content. Click here to join now