Robert Matosevic
Senior Design Engineer at Contrasol- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
Contrasol
-
United Kingdom
-
Design
-
1 - 100 Employee
-
Senior Design Engineer
-
Jul 2023 - Present
Project Design and Management Project Design and Management
-
-
-
Roofglaze Commercial
-
United Kingdom
-
Wholesale Building Materials
-
1 - 100 Employee
-
Senior Project Designer
-
Feb 2022 - Jul 2023
-
-
-
Telling Architectural Ltd
-
United Kingdom
-
Construction
-
Senior Project Coordinator
-
Apr 2021 - Dec 2021
-
-
-
MADELEY FACADE ENGINEERING LIMITED
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Project Designer
-
Oct 2018 - Apr 2021
-
-
-
-
Senior Designer
-
Oct 2016 - Oct 2018
Providing detail development for commercial CW, Roofing and Gutter system in coordination with Architect, subcontractors and main Contractor. Cooperating with GLF engineer to find an optimum solution regarding material/cost saving. Tracking and assisting production and site installation. Providing detail development for commercial CW, Roofing and Gutter system in coordination with Architect, subcontractors and main Contractor. Cooperating with GLF engineer to find an optimum solution regarding material/cost saving. Tracking and assisting production and site installation.
-
-
-
Architectural Aluminium Ltd
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Senior Designer - Team Leader
-
Mar 2015 - Sep 2016
Providing detail development for unitised and commercial CW system in coordination with Architect and main Contractor. Leading AA design team in developing fabrication, shop, installation, as built drawings, material orders. Cooperating with AA engineers to find an optimum solution regarding material/cost saving. Tracking and assisting production and site installation. Providing detail development for unitised and commercial CW system in coordination with Architect and main Contractor. Leading AA design team in developing fabrication, shop, installation, as built drawings, material orders. Cooperating with AA engineers to find an optimum solution regarding material/cost saving. Tracking and assisting production and site installation.
-
-
-
KFK Design
-
United Kingdom
-
Construction
-
Curtain Wall senior designer
-
Apr 2010 - Sep 2014
-
-
-
Caelum
-
Robotics Engineering
-
1 - 100 Employee
-
Owner - Design manager
-
Jan 2009 - Mar 2010
As a manager I was in charge with training new employees, developing system and coordinating parts of following projects: “MASDARCITY”, Abu Dhabi – (http://www.masdarcity.ae/en/index.aspx); “LES FALAISES”, Orano, Algeria, "ELITE RESIDENCE", Dubai, http://www.tameer.net/elite‐residence.aspx As a manager I was in charge with training new employees, developing system and coordinating parts of following projects: “MASDARCITY”, Abu Dhabi – (http://www.masdarcity.ae/en/index.aspx); “LES FALAISES”, Orano, Algeria, "ELITE RESIDENCE", Dubai, http://www.tameer.net/elite‐residence.aspx
-
-
-
-
Curtain Wall designer - database coordinator
-
Jan 2001 - Aug 2007
Projects that I was involved in (designer, database responsible, site material arrival and displacement planning): “Manulife”, Boston – www.permasteelisa.com/project gallery; “Times Square”, NY – www.permasteelisa.com/project gallery; “Hearst Headquarters”, NY – http://www.hearst.com/; “Westgate”, Dublin – www.permasteelisa.com project gallery. Projects that I was involved in (designer, database responsible, site material arrival and displacement planning): “Manulife”, Boston – www.permasteelisa.com/project gallery; “Times Square”, NY – www.permasteelisa.com/project gallery; “Hearst Headquarters”, NY – http://www.hearst.com/; “Westgate”, Dublin – www.permasteelisa.com project gallery.
-
-