Robert Hinostro
Safety Coordinator at Downhole Stabilization Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
API SPEC Q1 Editon 9 Lead Auditor/Internal Auditor
- -
MAZAK Maintenance 1 Training, Mazak Maintenance 2 Training
Mazak Corporation
Experience
-
Downhole Stabilization Inc
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Safety Coordinator
-
أكتوبر 2014 - - الحالي
Over see Safety program, hold monthly safety meetings and help out with maintenance when ever needed and set-up and up date PM schedule for all machinery and company vehicles. API Q1 Edition 9 Lead Auditor / Internal Auditor. I also helped write and maintain the Quality Management System currently in place, proficient with API Q1 Edition 9 and ISO 9001-2015 Over see Safety program, hold monthly safety meetings and help out with maintenance when ever needed and set-up and up date PM schedule for all machinery and company vehicles. API Q1 Edition 9 Lead Auditor / Internal Auditor. I also helped write and maintain the Quality Management System currently in place, proficient with API Q1 Edition 9 and ISO 9001-2015
-
-
-
Cameron, a Schlumberger company
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Maintenance Manager
-
أكتوبر 2010 - يوليو 2014
Set up, schedule and track PM'S, performed PM's and basic repairs to CNC, Manual Lathes, Mills and drill press's. Also took care of all the facility needs and repairs, scheduled and tracked PM's for forklifts and all company vehicles. Safety Captain and held tail gate safety meeting, performed BBSM / JSA Set up, schedule and track PM'S, performed PM's and basic repairs to CNC, Manual Lathes, Mills and drill press's. Also took care of all the facility needs and repairs, scheduled and tracked PM's for forklifts and all company vehicles. Safety Captain and held tail gate safety meeting, performed BBSM / JSA
-
-
-
-
Maintenance Manager/ Field Representitive
-
يناير 2000 - مارس 2013
Over see all aspects of maintenance to machinery and facility also traveled from job site to job site to ensure that all window and door installations were to ANSI code of regulations. over see 20 installers and 5 maintenance workers. Over see all aspects of maintenance to machinery and facility also traveled from job site to job site to ensure that all window and door installations were to ANSI code of regulations. over see 20 installers and 5 maintenance workers.
-
-
Education
-
El Monte Union High School