Robert Burns
Principal Designer at KELLOGG BROWN & ROOT GROUP LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
KELLOGG BROWN & ROOT GROUP LIMITED
-
United Kingdom
-
Business Consulting and Services
-
1 - 100 Employee
-
Principal Designer
-
Nov 2021 - Present
-
-
-
Kellogg Brown and Root Overseas Operations Limited / SOCAR KBR - LLC
-
Leatherhead, Surrey, UK / Baku, Azerbaijan
-
Piping Design Supervisor
-
Jun 2019 - Feb 2021
Oversight and mentoring of Piping Designers on all expects of layout and design. Understanding of KBR work processes, procedures, proven culture of safe working and the need of personnel safety and protection. Understanding and guidance for the Piping discipline for the application of Object Engineering work process on the ACE Project. Increasing the competency and broadening the knowledge of the designers in the use and implementation of the CAD 3D modelling software E3D. Increasing the competency and broadening the knowledge of the designers in piping design and layout and familiarity/awareness of other discipline activities and prime interfaces. Design and layout of all Utility Stations. Piping systems include Plant Air, Inert Gas, Portable Water, Seawater and Diesel. Design and layout of all 10 Firewater Deluge Systems including Firewater Hydrants. Design and layout of the Utilities Area and progressing the piping through the Object Engineering work process for issue to the fabrication facility. Modelling new and updating Existing Mechanical Equipment to the latest vendor drawings in the E3D model. Using E3D to layout the temporary equipment and pipework for the onshore commissioning at the AZFEN Construction Yard prior to sail away of the ACE Central East PDQ Platform.
-
-
-
Worley
-
Australia
-
Professional Services
-
700 & Above Employee
-
Senior Piping Designer
-
May 2017 - Jun 2019
Position: Senior Piping Designer Project: ST0202 Sangachal Fire Water Ring Main Upgrade (Brownfield) Phase 1 Client: BP/SOCAR Survey undertaken at the Sangachal Terminal for the Phase 1 Define scope which comprises of the replacement of the underground pipework with above ground pipework in four locations New lines routed in the PDMS model in the following areas using a Point Cloud Survey: - The Pipeline Corridor South Area, the Pipeline Corridor North Area, the Future Shah Deniz South Area and the Future Shah Deniz North Area Preliminary MTO produced and a Navisworks model generated for a design review with the client BP Isometrics issued after checking and a PDMS clash check. Project: ST1104 Sangachal Fire Water Ring Main Upgrade (Brownfield) Phase 2 Client: BP/SOCAR Survey undertaken at the Sangachal Terminal for the Phase 2 Define scope which comprises of the replacement of the underground pipework with above ground pipework Ring main and ancillary branches routed in the PDMS model for the define scope of work in the following areas: - Off-Spec Tank Area, Dew point Control Unit 1 and Dew Point Control Unit 2, Project: ST0191 Condensate Pipeline Repair, New Pumps and Pipework ST0245 Fire Water Ring Main Pump House, New Jockey Pumps and Pipework ST1028 DPCU1 Glycol System Overpressure Mitigation Client: BP/SOCAR Checking of isometrics to A01 and C01 revision Project: ST1043 DPCU1 Hot Oil Surge Drum Corroding Nozzles Replacement-Upgrade Client: BP/SOCAR Replacement of Hot Oil Surge Drum and a new Hot Oil Slip Stream Filter for the Hot Oil Pumping Skid. New lines routed in the PDMS model for the define scope of work Project: ST0265 SD Lean Meg Tank IP Systems & Vacuum PSV Client: BP/SOCAR Replacement of the Lean Meg Tank Seal Pot with a larger unit and replacment the pipework on top of the Lean Meg tank. New lines routed in the PDMS model for the define scope of work
-
-
-
Kellogg Brown and Root Overseas Operations Limited
-
Baku, Azerbaijan
-
Design Supervisor
-
May 2014 - Dec 2016
Leading a team of Senior Piping Designers on the design and layout of the Hazardous Open Drains System. Yellow line check and material takeoff check of the Design Isometrics for both platforms. Design review of the design and layout of piping on both platforms. Resolving issues with KBR Design Isometrics queries sent to KBR by the ATA Lead Piping Engineer. Assigned to the ATA Yard, Baku, Azerbaijan to give technical assistance to the BP/ATA site team for any problems with the design and construction of the Shah Deniz 2 SDB-PR Platform and SDB-QU Platform. Raising and resolving Site Technical Queries and liaising between the Leatherhead design office and site on any technical issues that arise during construction and fabrication. Issuing Construction Change Notices for modifications to pipework that are required due to a design issue or a BP operations requirement. Using PDMS Draft to create GA’s and System Isometrics for hydrotesting and isometric views to assist in the construction and fabrication of the two platforms for all disciplines. Using PDMS to layout the temporary equipment and pipework for the onshore commissioning prior to sail away of the Shah Deniz 2 SDB-PR Platform and SDB-QU Platform. Using PDMS Draft to produce a Plot Plan for the temporary commissioning equipment
-
-
Education
-
South East London Techical Education College (now Lewisham College)
HTEC Mechanical Engineering 1979 - 1981, TEC Mechanical and Production Engineering 1976 - 1979