Rob Kane

Electical Engineer at CENTRE STAGE ENGINEERING LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Great Hockham, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Electical Engineer
      • Aug 2019 - Present

    • Electrical Improver
      • Aug 2017 - Aug 2019

      Electrical Improver Subcontractor working under CIS and as a Limited Company. Electrical Improver Subcontractor working under CIS and as a Limited Company.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Electrical Improver
      • Jun 2019 - Jul 2019

      Domestic Flats• Standard 1st and 2nd Fix of electrical cables and accessories Domestic Flats• Standard 1st and 2nd Fix of electrical cables and accessories

    • United Kingdom
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Improver
      • Mar 2019 - Jun 2019

      Installation of Farm Machinery• Complying with site Health & Safety and Section 705 of BS 7671• Erecting of containment (trunking, tray and conduit)• Working on panel boards• Terminating isolators, motors, limiters and proxies.• Installing low voltage LED lighting and drivers Installation of Farm Machinery• Complying with site Health & Safety and Section 705 of BS 7671• Erecting of containment (trunking, tray and conduit)• Working on panel boards• Terminating isolators, motors, limiters and proxies.• Installing low voltage LED lighting and drivers

    • United Kingdom
    • 1 - 100 Employee
    • Electrical Improver
      • Mar 2019 - Apr 2019

      Shop Refit• Removing and stripping out old cables and accessories• Understanding drawings and meeting installation objectives• Working under the pressure of deadlines Shop Refit• Removing and stripping out old cables and accessories• Understanding drawings and meeting installation objectives• Working under the pressure of deadlines

    • Spain
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Electrical Improver
      • Feb 2019 - Mar 2019

      Petrochemical Site• Acquiring permits, Risk Assessments and Method Statements for Petrochemical site• Understanding drawings and installation objectives• Installing tray and pulling in SWA to BS 7671 standards• Terminating to 2 & 3 phase accessories and switch gear Petrochemical Site• Acquiring permits, Risk Assessments and Method Statements for Petrochemical site• Understanding drawings and installation objectives• Installing tray and pulling in SWA to BS 7671 standards• Terminating to 2 & 3 phase accessories and switch gear

    • United Kingdom
    • Real Estate
    • 1 - 100 Employee
    • Electrical Improver
      • Aug 2018 - Feb 2019

      Retrofitting Train Depot & 1st and 2nd Fix RAF Garrison Aug ‘18 – Feb ‘19• Complying with depot safety procedures and PPE when working around moving trains• Acquiring permits, Risk Assessments and Method Statements• Clear communication with subcontractors other trades on site• Understanding drawings and installation objectives• Installing conduit, trunking, tray to BS 7671 standards• Cable pulling of singles, PF and SWA when terminating to 2 & 3 phase accessories• Working on booms and scissor lifts in narrow spaces• Abiding by MOD protocols of secrecy

    • United Kingdom
    • Renewables & Environment
    • 1 - 100 Employee
    • Electrical Improver
      • Feb 2018 - Aug 2018

      • New build 1st and 2nd fix, rewiring to BS 7671 standards• Installing conduit, trunking, tray and basket, ensuring aesthetics standards• Power and data supply of heating system• Connecting Dali lighting control system• Preparing and termination of street furniture • Clear communication with subcontractors other trades on site• Following health and safety procedures and proper use of PPE• Performing annual 3 hour emergency lighting tests to BS 5266 • New build 1st and 2nd fix, rewiring to BS 7671 standards• Installing conduit, trunking, tray and basket, ensuring aesthetics standards• Power and data supply of heating system• Connecting Dali lighting control system• Preparing and termination of street furniture • Clear communication with subcontractors other trades on site• Following health and safety procedures and proper use of PPE• Performing annual 3 hour emergency lighting tests to BS 5266

    • Electrician
      • Jul 2017 - Jan 2018

      • Replacing destitution boards in domestic and commercial properties• Initial verification and inspection and testing• Wiring up sockets, light fittings, switches, fused spurs, electrical showers, cookers• Chasing walls for cables and back boxes• Earth bonding all exposed and extraneous conductive parts• Fault diagnostics and repair• Planning working week, working independently, maintaining feet vehicle • Replacing destitution boards in domestic and commercial properties• Initial verification and inspection and testing• Wiring up sockets, light fittings, switches, fused spurs, electrical showers, cookers• Chasing walls for cables and back boxes• Earth bonding all exposed and extraneous conductive parts• Fault diagnostics and repair• Planning working week, working independently, maintaining feet vehicle

    • Animation and Post-production
    • 700 & Above Employee
    • Collection and delivery driver
      • Jul 2014 - Aug 2017

      • Collection and delivery of goods to both domestic & commercial destinations• Exemplary appearance & attitude towards customers• Efficient organisation and route planning• Working under the pressure of time keeping • Collection and delivery of goods to both domestic & commercial destinations• Exemplary appearance & attitude towards customers• Efficient organisation and route planning• Working under the pressure of time keeping

    • Spectator Sports
    • 1 - 100 Employee
    • Head Performance Analyst
      • Jun 2009 - Jul 2014

      Gathering and resenting videos and statics, to improve team performance. Gathering and resenting videos and statics, to improve team performance.

    • United Kingdom
    • Higher Education
    • 200 - 300 Employee
    • Halls Warden
      • Sep 2006 - Oct 2010

      Looking after the Students

    • Football Coach
      • Oct 2005 - Oct 2010

    • BAR Supervisor
      • Sep 2005 - Oct 2010

      Provide refreshment to many students

    • Performance Analyst
      • Jul 2008 - May 2009

Education

  • Writtle University College
    BSc, Sports & Exercise Performance
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now