Rob Carr

Crossrail Routeway Delivery Director at CROSSRAIL LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
London, England, United Kingdom, UK
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Chartered Engineer
    Royal Institution of Naval Architects
    Nov, 1995
    - Oct, 2024

Experience

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Crossrail Routeway Delivery Director
      • Jun 2022 - Present

      Accountable for the delivery and closeout of the Crossrail routeway contracts following the start of passenger services through central London on the Elizabeth Line. Targeted to get to 24 trains per hour through-running Reading and Heathrow to Shenfield and Abbeywood by mid May 2023.

    • Crossrail Programme Services Director
      • Jul 2021 - Jun 2022

      Accountable to the Chief Programme Officer for Programme Controls, Central Asset Handover and coordinating Crossrail readiness for trial operations and passenger service, which was achieved on 24 May 2022.

    • Director Crossrail Transition & Readiness
      • Apr 2020 - Jul 2021

      Accountable to the Crossrail Chief Programme Officer for coordinating the Crossrail COVID 19 Recovery Strategy and then leading on Crossrail readiness to enter into the Trial Running period as an operational railway under ROGS. This was successfully achieved in line with the recovery plan on 26 March 2021.

    • United Kingdom
    • Rail Transportation
    • 700 & Above Employee
    • Programme Director Phase 1 - South
      • Jan 2015 - Apr 2020

      Accountable for delivery of the HS2 Area South programme, part of the Phase 1 link between London and Birmingham. Includes design & construction of the HS2 Euston Station, Old Oak Common Station, Euston tunnels and Northolt tunnels to West Ruislip. Leading a client team of circa 120 staff. Built the Area South programme team from 22 to 160+ personnel. Developed relationships with DfT, Treasury, Network Rail, TfL, local councils & communities. Seconded in January 2019 as Euston Area Programme Director developing a collaborative team with NR, TfL, London Borough of Camden & Lendlease to create a solution at Euston with full stakeholder buy-in for lowest cost. Regularly deputising for the MD – Phase 1. CDM Client rep for the Area. Sponsored Safety initiatives (Demolitions Best Practice) with Costain Skanska jv as part of the Phase 1 Safety Health & Wellbeing Executive Leadership Team (SHWELT). Led the implementation of the £600m+ Enabling works contract with CSjv, now substantially through the implementation phase, with 2/3 demolitions complete, nearly 20,000 bodies exhumed, and 34,000+ cubic metres spoil removed. Lead HS2 spokesperson at the Quarterly Euston Community Relations Group engagement meetings. Regularly interfacing with Camden councillors and local MP Kier Starmer. Presented on several occasions to the Secretary of State for Transport. Leading on integrating social improvements strategies across CSjv, Mace Dragados jv, Crick Living Centre, Lendlease and the Worshipful Company of Paviours. Show less

    • United Kingdom
    • Rail Transportation
    • 700 & Above Employee
    • Head of Project & Commercial Services(Thameslink)
      • Feb 2012 - Jan 2015

      Led the Programme Management Office for the £4.6bn Thameslink Programme, providing commercial, financial, schedule integration, business support, risk management and railway access services as integrated functions. Led the provision of bid management services to manage the successful £2bn bid for the Key Output 2 phase (24 trains per hour & London Bridge Station rebuild). Regularly deputised for the Thameslink Major Programme Director.

    • Senior Programme Manager
      • Sep 2010 - Feb 2012

      Responsible for delivering major signalling & electrification projects on time and within budget in Wessex, Sussex & Kent worth £80m p.a. under Construction Design Management (CDM) principles. Led a team of 143 project management, commercial, financial & operational staff across multiple sites from Southampton to East Kent

    • Project Director Cambrian ERTMS
      • Feb 2008 - May 2011

      Led a cross industry team of 60 to develop and deploy the first ERTMS Level 2 (no line side signals) system in the UK. Infrastructure & rolling stock systems were integrated with new and legacy equipment, including 24 Class 158 Diesel Multiple Units (DMUs). Successfully commissioned the pilot project (Cambrian) on 28 March 2011. Multiple stakeholders included DfT, ATOC, RSSB & Arriva Trains Wales.

    • Business Improvement Manager
      • Sep 2007 - Feb 2008

      Wrote the 2009-14 Signalling Power &Communications (SP&C) Strategic Business Plan. Went on to coordinate the submission of the Network Rail Infrastructure Investment Strategic Business Plan Refresh. Led an Initiative on 25% schedule reduction & 9% cost reduction creating a virtual team of contractors and Network Rail staff.

    • S2C2 Pathfinder - VT Representative
      • Apr 2006 - Sep 2007

      S2C2 Pathfinder VT Representative - seconded into the Ministry of Defence on the Sustained Surface Combatant Capability (S2C2) Pathfinder team to create a 35 year Capability Management Plan for UK RN Surface Combatants. Now MoD procurement strategy.

    • MARS Bid Director
      • Feb 2005 - Apr 2006

      VT Group Bid Director for the £10bn UK MoD Military Afloat Reach Sustainability (MARS) programme to replace strategic assets in the Royal Fleet Auxiliary 2011 to 2021. Developed the relationship between Client and VT Executive. Built strategic partnerships with UK/European shipyards.

    • Project Director Mirabella V
      • Jun 2003 - Feb 2005

      Directed and managed the build, trials, completion and delivery in May 2004 of Mirabella V, at the time the world’s largest single-masted Superyacht. Following her grounding in France in September 2004, bid for and won the £1.5m repair contract, rebuilding back to Superyacht standards in 3 months.

    • United Kingdom
    • Shipbuilding
    • 1 - 100 Employee
    • Director Of Production Operations
      • Sep 2001 - Jun 2003

      Responsible for the Production & Operations Department (600+ personnel) operating the shipyard continuously at maximum throughput. Prepared to move the yard from Southampton to Portsmouth, jointly leading in the Union negotiations over the relocation package.

    • Executive Project Manager T45
      • 2000 - Sep 2001

      Built the VT secondee team in Glasgow (Scotstoun) as part of the BAE T45 Integrated Project Team. Directed the development of the work share document that led to the contract award for the bow sections and masts.

    • PM Secondee
      • 1999 - 2000

      Seconded to Fleet Support Ltd, the BAE/VT Joint venture to refit and repair Royal Naval vessels in the Portsmouth Naval Base. Responsible for 2 Minor War Vessel bids & 35,000 tonne FPO conversion.

    • Executive Project Manager SRMH
      • 1998 - 1999

      Executive Project Manager - SRMH (£200m+) responsible for the timely construction of 3 of 6 batch 2 Single Role Mine Hunters: HMS Pembroke, Grimsby & Bangor for the UK Ministry of Defence.

    • Project Manager (Small Craft)
      • 1997 - 1998

      Responsible for the on time delivery within budget of 4 LCVP Mk 5 landing craft to the Royal Marines. All vessels delivered 1 month early and within budget. Successfully developed and implemented a turnaround plan to recover cost and schedule following the late and over budget delivery of the prototype LCVP Mk 5.Successfully submitted an unsolicited bid for a further 2 LCVP Mk 5, resulting in 6 craft delivered in total.

    • Steelwork Team Leader/Assistant Steelwork Manager
      • 1993 - 1997

      Steelwork team leader for the 56m Qatar fast strike craft contract, followed by Production Shop Manager for the VT Woolston Yard. Implemented Kaizen techniques to improve productivity e.g. 100% productivity improvement in shell rolls station.Promoted to Assistant Steelwork Manager, developing the welding and plateworking team to diversify into the construction of aluminium and stainless steel pressure vessels for the Britich Oxygen Corporation (BOC) following a downturn in shipbuilding orders. Show less

    • Teaching Company Associate and PM
      • 1989 - 1993

      Teaching Company Associate and Project Manager on the collaboration between Vosper Thornycroft UK Ltd and UCL to develop a computer aided ship concept design system (CASCADES) for use by VT and UCL students. System delivered in 1993, involving 66,000 lines of FORTRAN code.

Education

  • UCL
    MSc, Naval Architecture & Ocean Engineering
    1987 - 1988
  • UCL
    BEng, Naval Architecture & Ocean Engineering
    1984 - 1987

Community

You need to have a working account to view this content. Click here to join now