Rizki A. Damanik
Wellsite Reps at PHR WK Rokan at Pertamina Patra Drilling Contractor- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
bahasa inggris Limited working proficiency
-
bahasa indonesia -
Topline Score
Bio
Credentials
-
APPS "LSP PPSDM CEPU"
Badan Nasional Sertifikasi ProfesiAug, 2021- Nov, 2024 -
Operator Unit Perawatan Sumur
Badan Nasional Sertifikasi ProfesiFeb, 2014- Nov, 2024
Experience
-
Pertamina Patra Drilling Contractor
-
Indonesia
-
Construction
-
300 - 400 Employee
-
Wellsite Reps at PHR WK Rokan
-
Mar 2023 - Present
-
-
-
PT Patra Badak Arun Solusi
-
Indonesia
-
Oil and Gas
-
300 - 400 Employee
-
WOWS Supervisor at PHR Field Ramba
-
Jan 2021 - Jan 2023
-
-
-
PT Kopkar Petra
-
Sumatera Selatan, Indonesia
-
Hoist Supervisor at PHR Field Ramba
-
Aug 2020 - Dec 2020
-
-
-
-
Rig Operation Engineer
-
Nov 2015 - Aug 2020
Assessment well candidate prior to move-in rig to workover/drilling jobs.Preparing all document requirements (Journey Management Plan Moving, Permit to Work)Preparing all special equipment tools needed for execution rig operation.Cooperating with Wellsite Managers, Completion Engineers, Production Team, Rig Manager/Superintendent
-
-
Reliability Engineer (Workover & Service Rig Operation)
-
Mar 2013 - Nov 2015
• Make sure and monitoring maintenance schedule of aplicable for daily, weekly and monthly.• Create and manage annual service for tool and equipments mobile rig workover and service.• Monitoring and review performance rig every day.• Preparing and availability tool and equipments rig for minimization down time operation.• Facilitator for upgrade ability crew for especially mechanic.• Managing the logistic and reporting well service operation.• Coordinating and supervising the work of well service team.• Evaluation, analizing, documenting and reporting rig operation.• Preparing documents contract rig delivery and yearly maintenance. Show less
-
-
Rig Operation Engineer
-
Oct 2010 - Dec 2013
- Assist Rig Superintendent and HSE to check location which will be entered and made Journal Management Moving- Assist Rig Superintendent in manage Permit To Work- Conduct Review Program and Pre-Spud meeting with Well Work Engineer of Chevron- Creating Resource Loading and follow up the needs of the field- Creating a work plan based on the step program and discuss with tool pusher- Ensure tools and equipment are shipped in ready to use localized- Ensure all equipment is returned on time to Chevron- Conduct coordination with the Service Company- Assist Tool Pusher/Rig Superintendent/Company Man follow up of Migas Safety Check List to the Team Leader of Chevron- Ensure the implementation of the CWSI, making the record and closing and sent to the RE- Assist HSE in all internal and external finding close- Assist truck pusher in data entry the implementation of the JMS- Monitor the implementation of the maintenance program in accordance with a schedule that has been made- Monitoring and reporting fuel usage in the field and sent to the RE. Assist Tool Pusher/Rig Superintendent in making Inventory report- Create and make a simple RCA on every incident that occurs. Sends the operation status at any time has been determined. Show less
-
-
Education
-
Universitas Islam Riau
Bachelor's degree, Petroleum